| Proponent | Project Category | Project Name | Total Eligible Costs | Federal share | Provincial share |
|---|---|---|---|---|---|
| City of Barrie | Municipal Buildings | Barrie Fire and Emergency Services Station #1 and Headquarters | $12,780,000 | $4,260,000 | $4,260,000 |
| City of Barrie | Water Infrastructure | Watermain construction on Salem Road from Veterans Drive to Saunders Road | $1,519,200 | $506,400 | $506,400 |
| City of Barrie | Water Infrastructure | Watermain construction on Anne Street, Cundles Road, Kozlov Street and Heather Street | $2,978,100 | $992,700 | $992,700 |
| City of Barrie | Wastewater Infrastructure | Operations Centre Site Works and Stormwater Management Pond | $5,184,000 | $1,728,000 | $1,728,000 |
| City of Barrie | Local Road Infrastructure | Infrstructure improvements on Boys Street and Donald Street, including Bunkers Creek and Kidd's Creek culverts. | $3,500,100 | $1,166,700 | $1,166,700 |
| City of Barrie | Local Road Infrastructure | Road, drainage and other infrastructure improvements on Toronto Street, Dunlop Street, and Mary Street | $9,844,200 | $3,281,400 | $3,281,400 |
| City of Barrie | Airport Infrastructure | Lake Simcoe Regional Airport Upgrades and Expansion | $13,788,000 | $4,596,000 | $4,596,000 |
| City of Brampton | Public Transit Infrastructure | Mount Pleasant Village Mobility Hub | $23,000,000 | $7,666,667 | $7,666,667 |
| City of Brampton | Parks and Trails | Chinguacousy Park | $24,492,000 | $8,164,000 | $8,164,000 |
| City of Burlington | Municipal Buildings | Corporate-Wide Building Automation System | $1,500,000 | $500,000 | $500,000 |
| City of Burlington | Municipal Buildings | Freeman Station Installation | $1,000,000 | $333,333 | $333,333 |
| City of Burlington | Municipal Buildings | New Fire Station in NE Burlington | $2,250,000 | $750,000 | $750,000 |
| City of Burlington | Municipal Buildings | Accessibility Bridge | $1,500,000 | $500,000 | $500,000 |
| City of Burlington | Parks and Trails | Centennial Bike Path Resurfacing | $2,500,000 | $833,333 | $833,333 |
| City of Burlington | Parks and Trails | Hydro Corridor Bike Path Resurfacing | $1,800,000 | $600,000 | $600,000 |
| City of Burlington | Public Transit Infrastructure | Transit Operations Centre Renewal/Expansion Project | $8,600,000 | $2,866,666 | $2,866,667 |
| City of Burlington | Parks and Trails | New City Park | $6,900,000 | $2,300,000 | $2,300,000 |
| City of Cambridge | Municipal Buildings | Municipal Buildings Rehabilitation | $15,000,000 | $5,000,000 | $5,000,000 |
| City of Cambridge | Municipal Buildings | Preston Auditorium Rehabilitation | $2,400,000 | $800,000 | $800,000 |
| City of Cambridge | Municipal Buildings | Public Works Building Rehabilitation | $4,200,000 | $1,400,000 | $1,400,000 |
| City of Cambridge | Local Road Infrastructure | Cambridge Road Rehabilitation Program | $12,500,000 | $4,166,667 | $4,166,667 |
| City of Greater Sudbury | Local Road Infrastructure | Municipal Road 80 (Paris Street), Kathleen Street to York Street | $11,500,000 | $3,833,333 | $3,833,333 |
| City of Greater Sudbury | Local Road Infrastructure | Municipal Road 71 (LaSalle Boulevard) | $14,100,000 | $4,700,000 | $4,700,000 |
| City of Greater Sudbury | Local Road Infrastructure | Municipal Road 86 (Falconbridge Highway), Kingsway to Skead Road | $13,000,000 | $4,333,333 | $4,333,333 |
| City of Greater Sudbury | Parks and Trails | Bell Park / Grace Hartman Amphitheatre | $5,000,000 | $1,665,000 | $1,665,000 |
| City of Guelph | Local Road Infrastructure | Wyndham Street: Carden to Wellington | $8,400,000 | $2,800,000 | $2,800,000 |
| City of Guelph | Local Road Infrastructure | Norfolk: Norwich to Quebec | $5,400,000 | $1,800,000 | $1,800,000 |
| City of Guelph | Local Road Infrastructure | Pavement Deficit - Woodlawn Road | $1,137,500 | $379,166 | $379,166 |
| City of Guelph | Local Road Infrastructure | Sidewalk Rehabilitation Project #B | $3,000,000 | $1,000,000 | $1,000,000 |
| City of Guelph | Local Road Infrastructure | Edinburgh Road: Speedvale to London | $2,500,000 | $833,300 | $833,300 |
| City of Guelph | Local Road Infrastructure | Speedvale/Stevenson intersection | $2,500,000 | $833,300 | $833,300 |
| City of Guelph | Local Road Infrastructure | Stevenson: York to Elizabeth | $4,500,000 | $1,500,000 | $1,500,000 |
| City of Guelph | Local Road Infrastructure | Dawson Road Shelldale to Speedvale | $2,700,000 | $900,000 | $900,000 |
| City of Guelph | Local Road Infrastructure | Victoria Road North Ferndale to City Limit | $2,400,000 | $800,000 | $800,000 |
| City of Guelph | Local Road Infrastructure | Maltby Road Gordon to Hanlon | $2,800,000 | $933,300 | $933,300 |
| City of Guelph | Local Road Infrastructure | Victoria Road South | $2,500,000 | $833,333 | $833,333 |
| City of Guelph | Local Road Infrastructure | Victoria and Eastview Intersection Improvement | $1,500,000 | $500,000 | $500,000 |
| City of Guelph | Local Road Infrastructure | Speedvale: Stevenon to East City Limit | $4,000,000 | $1,333,333 | $1,333,333 |
| City of Guelph | Local Road Infrastructure | Eramosa & Delhi Intersection Improvement | $2,400,000 | $800,000 | $800,000 |
| City of Guelph | Local Road Infrastructure | Westmount Road Speedvale to London | $3,000,000 | $1,000,000 | $1,000,000 |
| City of Guelph | Local Road Infrastructure | Victoria/Woodlawn Intersection | $2,300,000 | $766,600 | $766,600 |
| City of Guelph | Local Road Infrastructure | Stone Road Bicycle lanes | $2,250,000 | $750,000 | $750,000 |
| City of Guelph | Municipal Buildings | Main Fire Station Rehabilitation | $1,193,500 | $397,833 | $397,833 |
| City of Guelph | Municipal Buildings | River Run Performing Arts Centre Rehabilitation | $2,271,500 | $757,166 | $757,166 |
| City of Guelph | Municipal Buildings | Transit Facility Rehabilitation | $1,776,500 | $592,166 | $592,166 |
| City of Guelph | Public Transit Infrastructure | Transit Terminal Infrastructure/Road, Sewer, Watermain Upgrades | $8,000,000 | $2,666,666 | $2,666,666 |
| City of Hamilton | Municipal Buildings | Energy Retrofit - Lister District Energy Expansion | $1,200,000 | $400,000 | $400,000 |
| City of Hamilton | Municipal Buildings | Lower Stoney Creek Recreation Centre - Phase One | $13,000,000 | $4,333,333 | $4,333,333 |
| City of Hamilton | Municipal Buildings | Coronation Arean Public/Private Partnership | $3,000,000 | $1,000,000 | $1,000,000 |
| City of Hamilton | Municipal Buildings | Westmount Recreation Centre | $21,000,000 | $7,000,000 | $7,000,000 |
| City of Hamilton | Municipal Buildings | Sir Wilfrid Laurier Rehabilitation | $1,500,000 | $500,000 | $500,000 |
| City of Hamilton | Municipal Buildings | Sir Allen MacNab Rehabilitation Project | $3,000,000 | $1,000,000 | $1,000,000 |
| City of Hamilton | Water Infrastructure | Biogas/Digester (Energy Recovery) | $30,000,000 | $10,000,000 | $10,000,000 |
| City of Hamilton | Water Infrastructure | Ferguson Pumping Station Upgrades | $20,000,000 | $6,666,667 | $6,666,667 |
| City of Hamilton | Water Infrastructure | Woodward Water Treatment Plant Upgrades | $42,000,000 | $14,000,000 | $14,000,000 |
| City of Hamilton | Water Infrastructure | Hillcreat Water Reservoir Upgrades | $8,600,000 | $2,866,667 | $2,866,667 |
| City of Hamilton | Water Infrastructure | Kenilworth Water Reservoir and Pumping Station Upgrades | $6,800,000 | $2,266,667 | $2,266,667 |
| City of Hamilton | Water Infrastructure | Stone Church Water Reservoir and Pumping Station Upgrades | $4,500,000 | $1,500,000 | $1,500,000 |
| City of Hamilton | Municipal Buildings | Energy Retrofit - 700 Woodward Ave | $4,500,000 | $1,500,000 | $1,500,000 |
| City of Hamilton | Disaster Mitigation Infrastructure | Emergency Services Training Facility /Emergency Operations Centre | $25,000,000 | $8,333,333 | $8,333,333 |
| City of Kingston | Water Infrastructure | Water Master Plan Implementation - O'Connor Drive Reservoir & Discharge Header | $13,500,000 | $4,500,000 | $4,500,000 |
| City of Kingston | Water Infrastructure | Water Master Plan Implementation - Bayridge Drive | $8,850,000 | $2,950,000 | $2,950,000 |
| City of Kingston | Water Infrastructure | Water Master Plan Implementation - Front Road | $10,000,000 | $3,333,333 | $3,333,333 |
| City of Kitchener | Cultural Infrastructure | Centre in the Square Rehabilitation | $1,200,000 | $400,000 | $400,000 |
| City of Kitchener | Municipal Buildings | City Hall Lighting | $1,000,000 | $334,000 | $333,000 |
| City of Kitchener | Municipal Buildings | Consolidated Maintenance Facility Improvements | $14,000,000 | $4,666,667 | $4,666,667 |
| City of Kitchener | Municipal Buildings | Consolidated Maintenance Facility Solar Roof | $4,100,000 | $1,366,667 | $1,366,667 |
| City of Kitchener | Municipal Buildings | Accessibility Improvements | $1,000,000 | $334,000 | $333,000 |
| City of Kitchener | Municipal Buildings | Energy Management Systems | $1,500,000 | $500,000 | $500,000 |
| City of Kitchener | Parks and Trails | McLennan Park Development | $3,000,000 | $1,000,000 | $1,000,000 |
| City of Kitchener | Wastewater Infrastructure | Sewer and Watermain Rehabilitation | $2,500,000 | $833,334 | $833,333 |
| City of Kitchener | Water Infrastructure | Storm Water Infrastructure Rehabilitation | $2,070,000 | $690,000 | $690,000 |
| City of London | Local Road Infrastructure | Wellington Road Gateway | $2,700,000 | $900,000 | $900,000 |
| City of London | Parks and Trails | Oakridge Optimist Park - Improve Park Amenities | $1,461,000 | $487,000 | $487,000 |
| City of London | Parks and Trails | Thames Valley Parkway - North Branch | $1,500,000 | $500,000 | $500,000 |
| City of London | Public Transit Infrastructure | Transit Building Life Cycle Repairs | $7,080,000 | $2,360,000 | $2,360,000 |
| City of London | Wastewater Infrastructure | Lifecycle Repairs to Sewer System - South London | $1,200,000 | $400,000 | $400,000 |
| City of London | Wastewater Infrastructure | Lifecycle Repairs to Sewer System - Old North/Downtown | $2,600,000 | $866,667 | $866,667 |
| City of London | Wastewater Infrastructure | Lifecycle Repairs to Sewer System - Old South London | $2,000,000 | $666,667 | $666,667 |
| City of London | Wastewater Infrastructure | Lifecycle Repairs to Sewer System-Old East London | $2,200,000 | $733,333 | $733,333 |
| City of London | Wastewater Infrastructure | Skyway Industrial Park - Phase 2 | $6,350,000 | $2,116,666 | $2,116,666 |
| City of London | Wastewater Infrastructure | Innovation Industrial Park - Phase 3 | $14,100,000 | $4,700,000 | $4,700,000 |
| City of London | Local Road Infrastructure | Dundas Street Gateway | $3,000,000 | $1,000,000 | $1,000,000 |
| City of London | Wastewater Infrastructure | Walnut/Kensington Area Sanitary and Storm Sewer Replacement | $1,100,000 | $366,667 | $366,667 |
| City of London | Wastewater Infrastructure | Bathurst Street Sanitary Sewer Replacement | $1,500,000 | $500,000 | $500,000 |
| City of London | Wastewater Infrastructure | Old South Storm Sewer Installation/Sanitary Sewer Replacement | $3,300,000 | $1,100,000 | $1,100,000 |
| City of London | Wastewater Infrastructure | Old South Combined Sewer Overflow Project-Wellington Road Area-Trevithen/Alexandra/Whetter | $4,000,000 | $1,333,333 | $1,333,333 |
| City of London | Wastewater Infrastructure | Old East London Storm Sewer Installation and Sanitary Sewer Replacement | $2,500,000 | $833,333 | $833,333 |
| City of London | Wastewater Infrastructure | South London - Eden Avenue Storm Sewer Installation | $1,600,000 | $533,333 | $533,333 |
| City of London | Municipal Buildings | Boyle Community Centre - Rehabilitate Facility | $1,200,000 | $400,000 | $400,000 |
| City of London | Parks and Trails | Thames Valley Parkway - Main Branch | $1,350,000 | $450,000 | $450,000 |
| City of London | Municipal Buildings | Oxford - New Operations Facility | $2,804,000 | $934,666 | $934,666 |
| City of London | Municipal Buildings | City Hall Building Improvements | $4,700,000 | $1,566,667 | $1,566,667 |
| City of London | Municipal Buildings | Carling Heights - Rehabilitate Facility | $1,700,000 | $566,666 | $566,666 |
| City of London | Parks and Trails | Ed Blake Park - New Park Features | $1,175,000 | $391,666 | $391,666 |
| City of London | Municipal Buildings | Byron Community Centre - Rehabilitate Facility | $1,296,000 | $432,000 | $432,000 |
| City of London | Parks and Trails | Kiwanis Park - Improve Park Amenities | $2,050,000 | $683,333 | $683,333 |
| City of London | Local Road Infrastructure | Hale & Trafalgar Street Overpass | $11,850,000 | $3,950,000 | $3,950,000 |
| City of London | Local Road Infrastructure | Highbury Bride Rehabilitation | $2,000,000 | $666,667 | $666,667 |
| City of London | Local Road Infrastructure | Quebec Street Overpass Rehabilitation | $2,000,000 | $666,667 | $666,667 |
| City of London | Local Road Infrastructure | Veterans Memorial Parkway | $700,000 | $233,000 | $233,000 |
| City of London | Municipal Buildings | Library Branch Rehabilitation | $400,000 | $133,333 | $133,333 |
| City of London | Municipal Buildings | Farquharson Arena - Roof Replacement | $630,000 | $210,000 | $210,000 |
| City of London | Municipal Buildings | Carling Arena - Replace Roof and Compressors | $720,000 | $240,000 | $240,000 |
| City of London | Parks and Trails | Basil Grover Park - Improve Park Amenities | $450,000 | $150,000 | $150,000 |
| City of London | Municipal Buildings | Argyle Arena Lighting Upgrade | $100,000 | $33,333 | $33,333 |
| City of London | Municipal Buildings | Kinsmen Arena - Replace Arena Lights | $100,000 | $33,333 | $33,333 |
| City of London | Municipal Buildings | Stronach Arena - Replace Arena Lights | $100,000 | $33,333 | $33,333 |
| City of London | Parks and Trails | Piccadilly Park - Improve Park Amenities | $350,000 | $116,667 | $116,667 |
| City of London | Municipal Buildings | AJ Tyler Operations Centre - Building Improvements | $719,000 | $239,666 | $239,666 |
| City of London | Municipal Buildings | Fire Hall No. 10 - Building Improvements | $675,000 | $225,000 | $225,000 |
| City of London | Municipal Buildings | Nichols Arena - Replace Arena Lights | $150,000 | $50,000 | $50,000 |
| City of London | Parks and Trails | Medway Park - Improve Park Amenities | $950,000 | $316,666 | $316,666 |
| City of London | Municipal Buildings | Fire Hall No. 9 - Building Improvements | $550,000 | $183,333 | $183,333 |
| City of Mississauga | Public Transit Infrastructure | City Centre Transit Priority - Mavis | $1,330,000 | $443,333 | $443,333 |
| City of Mississauga | Public Transit Infrastructure | City Centre Transit Priority - Rathburn | $4,170,000 | $1,390,000 | $1,390,000 |
| City of Mississauga | Cultural Infrastructure | Burnhamthorpe Branch Library Redevelopment | $16,600,000 | $5,533,333 | $5,533,333 |
| City of Mississauga | Cultural Infrastructure | Port Credit Branch Library Redevelopment | $2,500,000 | $833,333 | $833,333 |
| City of Mississauga | Cultural Infrastructure | Lorne Park Branch Library Redevelopment | $4,000,000 | $1,333,333 | $1,333,333 |
| City of Mississauga | Cultural Infrastructure | Lakeview Branch Library Redevelopment | $2,500,000 | $833,333 | $833,333 |
| City of Mississauga | Municipal Buildings | Civic Centre Building: Underground Parking Garage Repairs and Public Square Rehabilitation | $40,000,000 | $13,333,333 | $13,333,333 |
| City of Mississauga | Municipal Buildings | Clarkson Community Centre & Library Expansion | $10,000,000 | $3,333,333 | $3,333,333 |
| City of Mississauga | Municipal Buildings | Malton Community Centre & Library Expansion | $13,333,333 | $3,333,333 | $3,333,333 |
| City of Mississauga | Local Road Infrastructure | Eglinton Avenue West-Road Rehabilitation | $2,106,000 | $702,000 | $702,000 |
| City of Mississauga | Local Road Infrastructure | Admiral Boulevard-Road Rehabilitation | $1,093,266 | $364,422 | $364,422 |
| City of Mississauga | Local Road Infrastructure | Aerowood Drive-Road Rehabilitation | $468,000 | $156,000 | $156,000 |
| City of Mississauga | Local Road Infrastructure | Mavis Road Noise Attenuation Barrier Replacement | $136,000 | $45,333 | $45,333 |
| City of Mississauga | Local Road Infrastructure | Argentia Road-Road Rehabilitation | $2,191,617 | $730,539 | $730,539 |
| City of Mississauga | Local Road Infrastructure | Mavis Road Noise Attenuation Barrier Replacement | $528,000 | $176,000 | $176,000 |
| City of Mississauga | Local Road Infrastructure | Burnhamthorpe Road East Noise Attenuation Barrier Replacement | $308,800 | $102,933 | $102,933 |
| City of Mississauga | Local Road Infrastructure | Britannia Road East-Road Rehabilitation | $1,272,375 | $424,125 | $424,125 |
| City of Mississauga | Local Road Infrastructure | Burnhamthorpe Road East Noise Attenuation Barrier Replacement | $29,600 | $9,866 | $9,866 |
| City of Mississauga | Local Road Infrastructure | Burnamthorpe Road-Road Rehabilitation | $819,000 | $273,000 | $273,000 |
| City of Mississauga | Local Road Infrastructure | Creditview Road-Road Rehabilitation | $1,462,500 | $487,500 | $487,500 |
| City of Mississauga | Local Road Infrastructure | Winston Churchill Blvd - Road Rehabilitation | $7,930,000 | $2,643,333 | $2,643,333 |
| City of Mississauga | Local Road Infrastructure | Eglinton Avenue West-Road Rehabilitation | $2,145,000 | $715,000 | $715,000 |
| City of Mississauga | Local Road Infrastructure | Winston Churchill Blvd. - Road Rehabilitation | $2,700,000 | $900,000 | $900,000 |
| City of Mississauga | Local Road Infrastructure | Burnhamthorpe Road East Noise Attenuation Barrier Replacement | $68,800 | $22,933 | $22,933 |
| City of Mississauga | Local Road Infrastructure | Haultain Court - Road Rehabilitation | $136,500 | $45,500 | $45,500 |
| City of Mississauga | Local Road Infrastructure | Burnhamthorpe Road East Noise Attenuation Barrier Replacement | $216,800 | $72,266 | $72,266 |
| City of Mississauga | Local Road Infrastructure | Lakeshore Road West-Road Rehabilitation | $2,921,751 | $973,917 | $973,917 |
| City of Mississauga | Local Road Infrastructure | Maingate Drive-Road Rehabilitation | $715,002 | $238,334 | $238,334 |
| City of Mississauga | Local Road Infrastructure | Turner Valley Road - Road Rehabilitation | $273,000 | $91,000 | $91,000 |
| City of Mississauga | Local Road Infrastructure | Burnhamthorpe Road East Noise Attenuation Barrier Replacement | $80,800 | $26,933 | $26,933 |
| City of Mississauga | Local Road Infrastructure | Burnhamthorpe Road East Noise Attenuation Barrier Replacement | $276,800 | $92,266 | $92,266 |
| City of Mississauga | Local Road Infrastructure | Burnhamthorpe Road East Noise Attenuation Barrier Replacement | $36,800 | $12,266 | $12,266 |
| City of Mississauga | Local Road Infrastructure | Britannia Road West- New Sidewalk Construction | $115,960 | $38,653 | $38,653 |
| City of Mississauga | Local Road Infrastructure | Britannia Road West- New Sidewalk Construction | $34,190 | $11,396 | $11,396 |
| City of Mississauga | Local Road Infrastructure | Britannia Road East- New Sidewalk Construction | $53,040 | $17,680 | $17,680 |
| City of Mississauga | Local Road Infrastructure | Kennedy Road- New Sidewalk Construction | $30,940 | $10,313 | $10,313 |
| City of Mississauga | Local Road Infrastructure | Tomken Road Noise Attenuation Barrier Replacement | $264,000 | $88,000 | $88,000 |
| City of Mississauga | Local Road Infrastructure | Derry Road West- New Sidewalk Construction | $177,580 | $59,193 | $59,193 |
| City of Mississauga | Local Road Infrastructure | Derry Road East- New Sidewalk Construction | $1,017,770 | $339,256 | $339,256 |
| City of Mississauga | Local Road Infrastructure | Bonhill Road- New Sidewalk Construction | $104,650 | $34,883 | $34,883 |
| City of Mississauga | Local Road Infrastructure | Eglinton Avenue Noise Attenuation Barrier Replacement | $46,400 | $15,466 | $15,466 |
| City of Mississauga | Local Road Infrastructure | Brunel Road- New Sidewalk Construction | $143,130 | $47,710 | $47,710 |
| City of Mississauga | Local Road Infrastructure | Cardiff Boulevard- New Sidewalk Construction | $24,180 | $8,060 | $8,060 |
| City of Mississauga | Local Road Infrastructure | Columbus Road- New Sidewalk Construction | $140,530 | $46,843 | $46,843 |
| City of Mississauga | Local Road Infrastructure | Eglinton Avenue Noise Attenuation Barrier Replacement | $177,600 | $59,200 | $59,200 |
| City of Mississauga | Local Road Infrastructure | Dixie Road- New Sidewalk Construction | $111,280 | $37,093 | $37,093 |
| City of Mississauga | Local Road Infrastructure | Freemont Boulevard- New Sidewalk Construction | $64,480 | $21,493 | $21,493 |
| City of Mississauga | Local Road Infrastructure | Hadwen Road- New Sidewalk Construction | $63,180 | $21,060 | $21,060 |
| City of Mississauga | Local Road Infrastructure | Meyerside Drive- New Sidewalk Construction | $251,550 | $83,850 | $83,850 |
| City of Mississauga | Local Road Infrastructure | Confederation Parkway Noise Attenuation Barrier Replacement | $176,000 | $58,666 | $58,666 |
| City of Mississauga | Local Road Infrastructure | Mid-way Boulevard- New Sidewalk Construction | $68,900 | $22,966 | $22,966 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Bonnie Brea | $44,000 | $14,666 | $14,666 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Hawkins Glen | $74,400 | $24,800 | $24,800 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Sawmill Valley Trail | $827,900 | $275,966 | $275,966 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation @ Elmcreek Park | $94,400 | $31,466 | $31,466 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Brookmede Park | $155,500 | $51,833 | $51,833 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation-Kings Masting Park | $302,400 | $100,800 | $100,800 |
| City of Mississauga | Parks and Trails | Serson Park | $240,000 | $80,000 | $80,000 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation @ Woodgreen Park | $114,900 | $38,300 | $38,300 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Gordon Lummiss Park | $81,600 | $27,200 | $27,200 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation @ Richards Memorial Park | $54,100 | $18,033 | $18,033 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Lake Wabukayne | $405,500 | $135,166 | $135,166 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Stillmeadows Park | $64,300 | $21,433 | $21,433 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation @ Brandon Gate Park | $104,800 | $34,933 | $34,933 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Sandgate Park | $33,900 | $11,300 | $11,300 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Douglas Kennedy Park | $321,000 | $107,000 | $107,000 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation @ Bloor Athletic Field | $114,900 | $38,300 | $38,300 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Meadow Green | $188,700 | $62,900 | $62,900 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Springfield Park | $84,500 | $28,166 | $28,166 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Arbour Green | $114,900 | $38,300 | $38,300 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Lake Aquitaine | $452,800 | $150,933 | $150,933 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Huron Park | $561,700 | $187,233 | $187,233 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation McCauley Green | $125,100 | $41,700 | $41,700 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Stonebrook Park | $155,500 | $51,833 | $51,833 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Spruce Park | $94,400 | $31,466 | $31,466 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Fred Halliday Memorial Park | $68,700 | $22,900 | $22,900 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Lake Aquitaine Trail | $322,800 | $107,600 | $107,600 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Thornlodge Park | $351,400 | $117,133 | $117,133 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Northwood Park | $250,100 | $83,366 | $83,366 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation J.J. Plause Park | $419,700 | $139,900 | $139,900 |
| City of Mississauga | Wastewater Infrastructure | Stormwater Management Facility No. 3601, Dredging and Rehabilitation | $500,000 | $166,666 | $166,666 |
| City of Mississauga | Local Road Infrastructure | Rathburn Road East- Noise Attenuation Barrier Replacement | $117,600 | $39,200 | $39,200 |
| City of Mississauga | Local Road Infrastructure | Rathburn Road West- Noise Attenuation Barrier Replacement | $259,200 | $86,400 | $86,400 |
| City of Mississauga | Local Road Infrastructure | Rathburn Road West- Noise Attenuation Barrier Replacement | $120,000 | $40,000 | $40,000 |
| City of Mississauga | Local Road Infrastructure | Rathburn Road West- Noise Attenuation Barrier Replacement | $340,000 | $113,333 | $113,333 |
| City of Mississauga | Local Road Infrastructure | Rathburn Road West- Noise Attenuation Barrier Replacement | $400,000 | $133,333 | $133,333 |
| City of Mississauga | Local Road Infrastructure | Rathburn Road West- Noise Attenuation Barrier Replacement | $199,200 | $66,400 | $66,400 |
| City of Mississauga | Local Road Infrastructure | Rathburn Road West- Noise Attenuation Barrier Replacement | $208,000 | $69,333 | $69,333 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Promenade Meadows | $125,100 | $41,700 | $41,700 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation J.C. Saddington Park | $240,000 | $80,000 | $80,000 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Kennedy Park | $74,400 | $24,800 | $24,800 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Hiawatha Park | $234,900 | $78,300 | $78,300 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Prinetree Grove Park | $33,900 | $11,300 | $11,300 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Derry Greenway | $144,900 | $48,300 | $48,300 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Rayfield Park | $114,900 | $38,300 | $38,300 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Millgrove Trail | $963,000 | $321,000 | $321,000 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Eden Woods | $229,800 | $76,600 | $76,600 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Trappers Green | $425,800 | $141,933 | $141,933 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Sheridan Creek Trail | $385,300 | $128,433 | $128,433 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Woodhurst Heights | $370,000 | $123,333 | $123,333 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation @ Shaver Trail | $270,400 | $90,133 | $90,133 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Windy Hollow | $260,200 | $86,733 | $86,733 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation @ Wildwood Park | $260,200 | $86,733 | $86,733 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Glen Eden Park | $246,100 | $82,033 | $82,033 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Edengrove Park | $219,700 | $73,233 | $73,233 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Woodington Green | $405,500 | $135,166 | $135,166 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Woodland Chase Park | $155,500 | $51,833 | $51,833 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Windwood Park | $309,200 | $103,066 | $103,066 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Woodeden Park | $152,800 | $50,933 | $50,933 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Turney Woods | $145,300 | $48,433 | $48,433 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Shelby Park | $145,300 | $48,433 | $48,433 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Rathwood District Park | $290,600 | $96,866 | $96,866 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Kogaydiwin Trail | $250,100 | $83,366 | $83,366 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Glendenning Park | $119,200 | $39,733 | $39,733 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation-Springbank Meadows | $104,800 | $34,933 | $34,933 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Millgrove park | $104,800 | $34,933 | $34,933 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation @ Golden Orchard Park | $88,000 | $29,333 | $29,333 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Plowmans Park | $88,000 | $29,333 | $29,333 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Wakefield Common Park | $170,900 | $56,966 | $56,966 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Settlers Green | $150,800 | $50,266 | $50,266 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Brentwood Park | $135,200 | $45,066 | $45,066 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation-Westwood Park | $135,200 | $45,066 | $45,066 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Beechwood Park | $64,300 | $21,433 | $21,433 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Kindree Gate | $54,100 | $18,033 | $18,033 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Taffey Park | $54,100 | $18,033 | $18,033 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation-Richard F.C. Mortensen Park | $94,700 | $31,566 | $31,566 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Burnhamthorpe Library Grounds | $94,700 | $31,566 | $31,566 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Pinecliff Park | $43,000 | $14,333 | $14,333 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation - Meadowvale Sports Park | $84,500 | $28,166 | $28,166 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation McKenzie Park | $84,500 | $28,166 | $28,166 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Shalebank Hollow | $84,500 | $28,166 | $28,166 |
| City of Mississauga | Parks and Trails | Pathway Paving and Lighting Rehabilitation Ben Machree Park | $57,800 | $19,266 | $19,266 |
| City of Oshawa | Municipal Buildings | Oshawa Civic Complex Renewal and Expansion | $19,450,000 | $6,483,333 | $6,483,333 |
| City of Ottawa | Cultural Infrastructure | Ottawa Public Library - Alta Vista Branch Retrofit | $750,000 | $250,000 | $250,000 |
| City of Ottawa | Cultural Infrastructure | Ottawa Public Library - Cumberland Branch Retrofit | $750,000 | $250,000 | $250,000 |
| City of Ottawa | Cultural Infrastructure | Ottawa Public Library - Sunnyside Branch Renovation | $1,275,000 | $425,000 | $425,000 |
| City of Ottawa | Cultural Infrastructure | Structures - Drainage Culverts (1m to 3m) - Prince of Wales Drive Culvert | $200,000 | $66,667 | $66,667 |
| City of Ottawa | Cultural Infrastructure | A New Library for Greely | $1,200,000 | $400,000 | $400,000 |
| City of Ottawa | Cultural Infrastructure | Centrepointe Theatre Expansion Project | $12,000,000 | $4,000,000 | $4,000,000 |
| City of Ottawa | Cultural Infrastructure | Ottawa Chinatown Gateway Project | $600,000 | $125,000 | $125,000 |
| City of Ottawa | Cultural Infrastructure | Ottawa Public Library - Vanier Branch Retrofit | $750,000 | $250,000 | $250,000 |
| City of Ottawa | Local Road Infrastructure | Hunt Club Road extension to Highway 417 - Phase I | $20,000,000 | $6,666,667 | $6,666,667 |
| City of Ottawa | Local Road Infrastructure | Terry Fox Drive - Flamborough Rd to Kanata Ave | $47,700,000 | $15,900,000 | $15,900,000 |
| City of Ottawa | Local Road Infrastructure | Rural Road Upgrades | $654,000 | $218,000 | $218,000 |
| City of Ottawa | Local Road Infrastructure | Rural Road Upgrades | $240,000 | $80,000 | $80,000 |
| City of Ottawa | Local Road Infrastructure | Rural Road Upgrades | $370,000 | $123,333 | $123,333 |
| City of Ottawa | Local Road Infrastructure | Rural Road Upgrades | $170,000 | $56,667 | $56,667 |
| City of Ottawa | Local Road Infrastructure | Rural Road Upgrades | $400,000 | $133,333 | $133,333 |
| City of Ottawa | Local Road Infrastructure | Rural Road Upgrades | $120,000 | $40,000 | $40,000 |
| City of Ottawa | Local Road Infrastructure | Rural Road Upgrades | $420,000 | $140,000 | $140,000 |
| City of Ottawa | Local Road Infrastructure | Rural Road Operational Improvements | $331,000 | $110,333 | $110,333 |
| City of Ottawa | Local Road Infrastructure | Rural Road Operational Improvements | $130,000 | $43,333 | $43,333 |
| City of Ottawa | Local Road Infrastructure | Rural Road Operational Improvements | $412,000 | $137,333 | $137,333 |
| City of Ottawa | Local Road Infrastructure | Rural Road Operational Improvements | $200,000 | $66,667 | $66,667 |
| City of Ottawa | Local Road Infrastructure | Rural Road Operational Improvements | $366,000 | $122,000 | $122,000 |
| City of Ottawa | Local Road Infrastructure | Rural Road Operational Improvements | $154,000 | $51,333 | $51,333 |
| City of Ottawa | Local Road Infrastructure | Mer Bleue Road - 500 meters South of Innes to Hydro Corridor | $5,000,000 | $1,666,666 | $1,666,666 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - Urban Multi-Use Pathways - Industrial Road (OR 30) | $25,000 | $8,333 | $8,333 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - Urban Multi-Use Pathways - Woodroffe Pathway Extension | $100,000 | $33,333 | $33,333 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - Urban Multi-Use Pathways - Alta Vista Transportation Corridor Pathway | $250,000 | $83,333 | $83,333 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - Urban Multi-Use Pathways - Sawmill Creek Pathway Connections | $250,000 | $83,333 | $83,333 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - Urban Multi-Use Pathways - Ottawa River Capital Pathway #2 (City-owned section) Improvements | $350,000 | $116,667 | $116,667 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - Urban Multi-Use Pathways - Ottawa River Capital Pathway #1 (City-owned section) Improvements | $110,000 | $36,667 | $36,667 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - New Sidewalks - Canada Post Transit Link | $145,000 | $48,333 | $48,333 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - New Sidewalks - Belfast Road | $210,000 | $70,000 | $70,000 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - New Sidewalks - Bronson | $240,000 | $80,000 | $80,000 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - New Sidewalks - City Wide | $3,000,000 | $1,000,000 | $1,000,000 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - New Sidewalks - Coventry | $150,000 | $50,000 | $50,000 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - Sidewalks - Data Centre Road West | $360,000 | $120,000 | $120,000 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - New Sidewalks - Hunt Club - Billy Bishop | $180,000 | $60,000 | $60,000 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - Rural Pathways - Prescott Russell Pathway Linkage | $2,000,000 | $666,667 | $666,667 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - Rural Pathways - Prescott Subdivision pathway #1 | $1,400,000 | $466,667 | $466,667 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - New Sidewalks - Hunt Club - Bowesville | $470,000 | $156,667 | $156,667 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - New Sidewalks - Eagleson Road | $236,000 | $78,667 | $78,667 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - New Sidewalks - Shoreline-Tewsley Transit Link | $125,000 | $41,667 | $41,667 |
| City of Ottawa | Local Road Infrastructure | Hazeldean Road Widening | $65,000,000 | $21,666,666 | $21,666,666 |
| City of Ottawa | Local Road Infrastructure | Sidewalk and Curb Renewal | $518,000 | $172,667 | $172,667 |
| City of Ottawa | Local Road Infrastructure | Earl Armstrong Road | $35,000,000 | $11,666,666 | $11,666,666 |
| City of Ottawa | Local Road Infrastructure | Rural Road Upgrades | $203,000 | $67,667 | $67,667 |
| City of Ottawa | Local Road Infrastructure | Rural Road Upgrades | $184,000 | $61,333 | $61,333 |
| City of Ottawa | Local Road Infrastructure | Rural Road Upgrades | $286,000 | $95,333 | $95,333 |
| City of Ottawa | Local Road Infrastructure | Rural Road Upgrades | $198,000 | $66,000 | $66,000 |
| City of Ottawa | Local Road Infrastructure | Rural Road Upgrades | $81,000 | $27,000 | $27,000 |
| City of Ottawa | Local Road Infrastructure | Rural Road Upgrades | $126,000 | $42,000 | $42,000 |
| City of Ottawa | Local Road Infrastructure | Rural Road Upgrades | $221,000 | $73,667 | $73,667 |
| City of Ottawa | Local Road Infrastructure | Rural Road Upgrades | $289,000 | $96,333 | $96,333 |
| City of Ottawa | Local Road Infrastructure | Rural Road Upgrades | $149,000 | $49,667 | $49,667 |
| City of Ottawa | Local Road Infrastructure | Rural Road Operational Improvements | $85,000 | $28,333 | $28,333 |
| City of Ottawa | Local Road Infrastructure | Rural Road Operational Improvements | $86,000 | $28,667 | $28,667 |
| City of Ottawa | Local Road Infrastructure | Rural Road Operational Improvements | $300,000 | $100,000 | $100,000 |
| City of Ottawa | Local Road Infrastructure | Rural Road Operational Improvements | $205,000 | $68,333 | $68,333 |
| City of Ottawa | Local Road Infrastructure | Pedestrian - St Joseph Blvd Streetscaping | $2,500,000 | $833,333 | $833,333 |
| City of Ottawa | Municipal Buildings | Bellevue Manor Community Centre | $80,000 | $26,666 | $26,666 |
| City of Ottawa | Municipal Buildings | Goulbourn Municipal Office Septic System Reconstruction | $70,000 | $23,333 | $23,333 |
| City of Ottawa | Public Transit Infrastructure | Resurfacing - Transit Roads and Park & Ride Areas | $570,000 | $190,000 | $190,000 |
| City of Ottawa | Public Transit Infrastructure | Resurfacing - Transit Roads and Park & Ride Areas | $720,000 | $240,000 | $240,000 |
| City of Ottawa | Public Transit Infrastructure | Resurfacing - Transit Roads and Park & Ride Areas | $55,000 | $18,333 | $18,333 |
| City of Ottawa | Public Transit Infrastructure | Transitway Improvement Program - Blair Station | $100,000 | $33,333 | $33,333 |
| City of Ottawa | Public Transit Infrastructure | Structures - Transit Wall Preservation | $1,000,000 | $333,333 | $333,333 |
| City of Ottawa | Public Transit Infrastructure | O-Train Corridor Upgrades | $900,000 | $300,000 | $300,000 |
| City of Ottawa | Public Transit Infrastructure | Southwest Transitway Extension - Fallowfield to Barrhaven TC (903275) | $52,600,000 | $17,533,333 | $17,533,333 |
| City of Ottawa | Public Transit Infrastructure | Transitway Improvement Program - Core Area | $1,666,000 | $555,333 | $555,333 |
| City of Ottawa | Public Transit Infrastructure | Transitway Improvement Program - St Laurent Supervisors Office | $22,500 | $7,500 | $7,500 |
| City of Ottawa | Public Transit Infrastructure | Transitway Improvement Program - Upper Level of St Laurent Station | $175,000 | $58,333 | $58,333 |
| City of Ottawa | Public Transit Infrastructure | Transitway Improvement Program - Hurdman Station | $75,000 | $25,000 | $25,000 |
| City of Ottawa | Public Transit Infrastructure | Baseline Station Tunnel, College Ave Overpass | $38,000,000 | $12,666,667 | $12,666,667 |
| City of Ottawa | Public Transit Infrastructure | Pedestrian Overpass - Woodroffe Ave to Baseline Transit Station | $5,000,000 | $1,666,667 | $1,666,667 |
| City of Ottawa | Public Transit Infrastructure | Structures - Transitway Renew/Replace - Blair Road Ramp | $1,000,000 | $333,333 | $333,333 |
| City of Ottawa | Public Transit Infrastructure | Structures - Transitway Renew/Replace - Nicholas Street Ramp | $1,300,000 | $433,333 | $433,333 |
| City of Ottawa | Public Transit Infrastructure | Structures - Transitway Renew/Replace - Sackville Road Pedestrian Bridge | $200,000 | $66,667 | $66,667 |
| City of Ottawa | Public Transit Infrastructure | Transitway Improvement Program - Lighting Program | $75,000 | $25,000 | $25,000 |
| City of Ottawa | Wastewater Infrastructure | Integrated Road Water and Sewer - Tremblay Road | $4,500,000 | $1,500,000 | $1,500,000 |
| City of Ottawa | Wastewater Infrastructure | Integrated Road Water and Sewer - Stormont Street/Apeldoorn Avenue | $4,000,000 | $1,333,333 | $1,333,333 |
| City of Ottawa | Wastewater Infrastructure | Integrated Road Water and Sewer - Indian Road | $5,000,000 | $1,666,667 | $1,666,667 |
| City of Ottawa | Wastewater Infrastructure | Integrated Road Water and Sewer - 8th Line Road/Lloyd Graham Avenue | $2,500,000 | $833,333 | $833,333 |
| City of Ottawa | Wastewater Infrastructure | Integrated Road Water and Sewer - Sussex Drive | $6,000,000 | $2,000,000 | $2,000,000 |
| City of Ottawa | Wastewater Infrastructure | Integrated Road Water and Sewer - Pinewood Crescent | $3,500,000 | $1,166,667 | $1,166,667 |
| City of Ottawa | Wastewater Infrastructure | Integrated Road Water and Sewer - Churchill Avenue | $7,500,000 | $2,500,000 | $2,500,000 |
| City of Ottawa | Wastewater Infrastructure | Integrated Road Water and Sewer - Pleasant Park Road | $5,000,000 | $1,666,667 | $1,666,667 |
| City of Ottawa | Wastewater Infrastructure | Integrated Road Water and Sewer - Sandridge Road | $8,000,000 | $2,666,667 | $2,666,667 |
| City of Ottawa | Water Infrastructure | Integrated Road Water and Sewer - Triole Street | $3,000,000 | $1,000,000 | $1,000,000 |
| City of Ottawa | Water Infrastructure | Integrated Road Water and Sewer - Argyle Ave./Park Ave./Queen Elizabeth Way | $5,000,000 | $1,666,667 | $1,666,667 |
| City of Ottawa | Water Infrastructure | Integrated Road Water and Sewer - Cambridge Street/Jackson Avenue/Frederick Place | $3,000,000 | $1,000,000 | $1,000,000 |
| City of Ottawa | Water Infrastructure | Integrated Road Water and Sewer - Tweedsmuir Avenue | $6,000,000 | $2,000,000 | $2,000,000 |
| City of St. Catharines | Municipal Buildings | Carlisle Street Garage Replacement | $28,000,000 | $9,333,333 | $9,333,333 |
| City of St. Catharines | Airport Infrastructure | Niagara District Airport Infrastructure Improvements | $11,608,000 | $3,869,334 | $3,869,333 |
| Regional Municipality of Niagara | Local Road Infrastructure | Regional Road 73 (Fly Road) Reconstruction & Upgrading | $2,700,000 | $900,000 | $900,000 |
| City of Thunder Bay | Cultural Infrastructure | Mary J.L. Black Library Renewal | $4,110,000 | $1,370,000 | $1,370,000 |
| City of Thunder Bay | Parks and Trails | Prince Arthur's Landing at Marina Park - Phase 1 | $44,000,000 | $14,650,000 | $14,650,000 |
| City of Vaughan | Local Road Infrastructure | Ansley Grove Road | $1,483,300 | $494,433 | $494,433 |
| City of Vaughan | Parks and Trails | Rainbow Creek Park Renewal and Redevelopment | $1,302,000 | $434,000 | $434,000 |
| City of Vaughan | Local Road Infrastructure | Street Lighting Conversion to Energy Efficient | $1,500,000 | $500,000 | $500,000 |
| City of Vaughan | Local Road Infrastructure | Martin Grove Road | $2,664,300 | $888,100 | $888,100 |
| City of Vaughan | Municipal Buildings | Construct Park Washroom Facilities at Doctor McLean's Park | $1,400,000 | $466,667 | $466,667 |
| City of Vaughan | Local Road Infrastructure | Elmbank Road | $1,134,400 | $378,133 | $378,133 |
| City of Vaughan | Local Road Infrastructure | Erica Road | $1,167,800 | $389,267 | $389,267 |
| City of Vaughan | Local Road Infrastructure | Oakbank Road | $1,165,800 | $388,600 | $388,600 |
| City of Vaughan | Local Road Infrastructure | Thornbank Road | $3,974,400 | $1,324,800 | $1,324,800 |
| City of Vaughan | Municipal Buildings | Chancellor Community Centre - Replace Roof Over the First Construction Phase of the Facility | $400,000 | $133,333 | $133,333 |
| City of Vaughan | Municipal Buildings | Garnet A. Williams Community Centre Ice Rink Retrofit | $250,000 | $83,334 | $83,333 |
| City of Vaughan | Municipal Buildings | Maple Community Centre- Replace Wood Siding with Metal Siding at Lower and Upper Portions of the Building | $300,000 | $100,000 | $100,000 |
| City of Vaughan | Municipal Buildings | Al Palladini Community Centre Ice Rink Retrofit | $275,000 | $91,667 | $91,667 |
| City of Vaughan | Parks and Trails | Nort Johnson Park - Addition of Walkway Lighting | $250,000 | $83,334 | $83,333 |
| City of Vaughan | Parks and Trails | Maple Nature Reserve - Trail System Connections | $90,000 | $30,000 | $30,000 |
| City of Vaughan | Parks and Trails | The Woodbridge Memorial Tower and Park Site Rehabilitation - Landscaping | $170,000 | $56,667 | $56,667 |
| City of Vaughan | Parks and Trails | Don and Humber Trail System | $300,000 | $100,000 | $100,000 |
| City of Vaughan | Parks and Trails | Maple Nature Reserve - Quonset Hut Site Regeneration | $578,500 | $192,834 | $192,833 |
| City of Vaughan | Municipal Buildings | Al Palladini Community Centre New Elevator Installation | $300,000 | $100,000 | $100,000 |
| City of Vaughan | Municipal Buildings | Bathurst Clark Library Retrofit | $400,000 | $133,334 | $133,333 |
| City of Vaughan | Municipal Buildings | Kleinburg Library Building Retrofit | $175,000 | $58,334 | $58,333 |
| City of Vaughan | Local Road Infrastructure | Chancellor Drive & Weston Road | $105,000 | $35,000 | $35,000 |
| City of Vaughan | Local Road Infrastructure | Viceroy Road & Dufferin Street | $140,000 | $46,667 | $46,667 |
| City of Vaughan | Local Road Infrastructure | Highway 7 + Edgeley Boulevard | $150,000 | $50,000 | $50,000 |
| City of Vaughan | Local Road Infrastructure | Cradoock Street | $17,300 | $5,767 | $5,767 |
| City of Vaughan | Local Road Infrastructure | Cartwright Boulevard | $29,300 | $9,767 | $9,767 |
| City of Vaughan | Local Road Infrastructure | York Hill Boulevard | $60,700 | $20,234 | $20,233 |
| City of Vaughan | Local Road Infrastructure | Woodview Road | $5,900 | $1,967 | $1,967 |
| City of Vaughan | Local Road Infrastructure | Via Canala Way | $6,500 | $2,167 | $2,167 |
| City of Vaughan | Local Road Infrastructure | Muzzo Court | $5,500 | $1,833 | $1,833 |
| City of Vaughan | Local Road Infrastructure | Via Lanciano Crescent | $7,300 | $2,433 | $2,433 |
| City of Vaughan | Local Road Infrastructure | Domenica Way | $8,200 | $2,733 | $2,733 |
| City of Vaughan | Local Road Infrastructure | Cooper Creek Court | $19,400 | $6,467 | $6,467 |
| City of Vaughan | Local Road Infrastructure | Ed Quigg Way | $20,600 | $6,867 | $6,867 |
| City of Vaughan | Local Road Infrastructure | Oberdan Way | $21,200 | $7,067 | $7,067 |
| City of Vaughan | Local Road Infrastructure | Silverado Trail | $21,200 | $7,067 | $7,067 |
| City of Vaughan | Local Road Infrastructure | Jenna Court | $10,900 | $3,633 | $3,633 |
| City of Vaughan | Local Road Infrastructure | Longview Crescent | $23,300 | $7,767 | $7,767 |
| City of Vaughan | Local Road Infrastructure | Blossom Court | $12,700 | $4,233 | $4,233 |
| City of Vaughan | Local Road Infrastructure | Via Cristina Way | $25,400 | $8,467 | $8,467 |
| City of Vaughan | Local Road Infrastructure | Marco Sgotto Avenue | $27,200 | $9,067 | $9,067 |
| City of Vaughan | Local Road Infrastructure | Leyton Road | $27,500 | $9,167 | $9,167 |
| City of Vaughan | Local Road Infrastructure | Pierina Court | $14,500 | $4,833 | $4,833 |
| City of Vaughan | Local Road Infrastructure | Leith Court | $29,600 | $9,867 | $9,867 |
| City of Vaughan | Local Road Infrastructure | Thistle Ridge Drive | $32,000 | $10,667 | $10,667 |
| City of Vaughan | Local Road Infrastructure | Marevan Place | $16,600 | $5,533 | $5,533 |
| City of Vaughan | Local Road Infrastructure | Vespucci Drive | $17,500 | $5,833 | $5,833 |
| City of Vaughan | Local Road Infrastructure | Lio Avenue | $37,700 | $12,567 | $12,567 |
| City of Vaughan | Local Road Infrastructure | Norwood Avenue | $39,200 | $13,067 | $13,067 |
| City of Vaughan | Local Road Infrastructure | Laura Sabrina Drive | $24,400 | $8,133 | $8,133 |
| City of Vaughan | Local Road Infrastructure | San Vito Drive | $24,800 | $8,267 | $8,267 |
| City of Vaughan | Local Road Infrastructure | Giovanni Way | $25,300 | $8,433 | $8,433 |
| City of Vaughan | Local Road Infrastructure | Tavio Way | $25,600 | $8,533 | $8,533 |
| City of Vaughan | Local Road Infrastructure | Theodore Place | $54,200 | $18,067 | $18,067 |
| City of Vaughan | Local Road Infrastructure | Riverside Drive | $27,400 | $9,133 | $9,133 |
| City of Vaughan | Local Road Infrastructure | Sgotto Boulevard | $27,800 | $9,267 | $9,267 |
| City of Vaughan | Local Road Infrastructure | Colombo Crescent | $28,400 | $9,467 | $9,467 |
| City of Vaughan | Local Road Infrastructure | Eddington Place | $30,400 | $10,133 | $10,133 |
| City of Vaughan | Local Road Infrastructure | York Hill Boulevard | $30,800 | $10,267 | $10,267 |
| City of Vaughan | Local Road Infrastructure | Sherbourne Drive | $68,800 | $22,933 | $22,933 |
| City of Vaughan | Local Road Infrastructure | Noah Crescent | $35,300 | $11,767 | $11,767 |
| City of Vaughan | Local Road Infrastructure | Fonteselva Avenue | $36,400 | $12,133 | $12,133 |
| City of Vaughan | Local Road Infrastructure | Siderno Crescent | $78,400 | $26,133 | $26,133 |
| City of Vaughan | Local Road Infrastructure | Guery Crescent | $41,500 | $13,833 | $13,833 |
| City of Vaughan | Local Road Infrastructure | Lucky Court | $41,500 | $13,833 | $13,833 |
| City of Vaughan | Local Road Infrastructure | Clarmount Lane | $43,300 | $14,433 | $14,433 |
| City of Vaughan | Local Road Infrastructure | Robinwood Trail | $96,400 | $32,133 | $32,133 |
| City of Vaughan | Local Road Infrastructure | Dundurn Crescent | $96,800 | $32,267 | $32,267 |
| City of Vaughan | Local Road Infrastructure | Chilmar Crescent | $97,100 | $32,367 | $32,367 |
| City of Vaughan | Local Road Infrastructure | Julia Valentina Avenue | $101,000 | $33,667 | $33,667 |
| City of Vaughan | Local Road Infrastructure | Goldpark Court | $53,800 | $17,933 | $17,933 |
| City of Vaughan | Local Road Infrastructure | Riverside Drive | $54,200 | $18,067 | $18,067 |
| City of Vaughan | Local Road Infrastructure | Oakdale Road | $109,100 | $36,367 | $36,367 |
| City of Vaughan | Local Road Infrastructure | Amaretto Court | $57,700 | $19,233 | $19,233 |
| City of Vaughan | Local Road Infrastructure | Edgeley Boulevard | $58,300 | $19,433 | $19,433 |
| City of Vaughan | Local Road Infrastructure | Courtland Avenue | $58,900 | $19,633 | $19,633 |
| City of Vaughan | Local Road Infrastructure | Woodcroft Lane | $133,300 | $44,433 | $44,433 |
| City of Vaughan | Local Road Infrastructure | Antonella Crescent | $138,500 | $46,167 | $46,167 |
| City of Vaughan | Local Road Infrastructure | Bachman Drive | $70,600 | $23,533 | $23,533 |
| City of Vaughan | Local Road Infrastructure | Lamar Stree | $142,900 | $47,633 | $47,633 |
| City of Vaughan | Local Road Infrastructure | Melville Road | $149,000 | $49,667 | $49,667 |
| City of Vaughan | Local Road Infrastructure | Oliver Lane | $164,200 | $54,733 | $54,733 |
| City of Vaughan | Local Road Infrastructure | Huntingwood Court | $94,900 | $31,633 | $31,633 |
| City of Vaughan | Local Road Infrastructure | Sterling Crescent | $99,100 | $33,033 | $33,033 |
| City of Vaughan | Local Road Infrastructure | Binscarth Crescent | $102,100 | $34,033 | $34,033 |
| City of Vaughan | Local Road Infrastructure | Blaine Court | $104,800 | $34,933 | $34,933 |
| City of Vaughan | Local Road Infrastructure | Amy Court | $106,000 | $35,333 | $35,333 |
| City of Vaughan | Local Road Infrastructure | Millway Avenue | $106,900 | $35,633 | $35,633 |
| City of Vaughan | Local Road Infrastructure | Creditstone Road | $134,500 | $44,833 | $44,833 |
| City of Vaughan | Local Road Infrastructure | Courtland Avenue | $149,500 | $49,833 | $49,833 |
| City of Vaughan | Local Road Infrastructure | Marwood Place | $152,800 | $50,933 | $50,933 |
| City of Vaughan | Local Road Infrastructure | Martin Grove Road | $387,100 | $129,033 | $129,033 |
| City of Vaughan | Local Road Infrastructure | Beatrice Way | $218,800 | $72,933 | $72,933 |
| City of Vaughan | Local Road Infrastructure | Marlott Road | $271,700 | $90,567 | $90,567 |
| City of Vaughan | Local Road Infrastructure | Art Drive | $26,500 | $8,833 | $8,833 |
| City of Vaughan | Local Road Infrastructure | Asquith Place | $177,600 | $59,200 | $59,200 |
| City of Vaughan | Local Road Infrastructure | Athena Court | $5,100 | $1,700 | $1,700 |
| City of Vaughan | Local Road Infrastructure | Beechnut Road | $21,600 | $7,200 | $7,200 |
| City of Vaughan | Local Road Infrastructure | Birch Meadow Outlook | $37,800 | $12,600 | $12,600 |
| City of Vaughan | Local Road Infrastructure | Casa Vista Drive | $16,800 | $5,600 | $5,600 |
| City of Vaughan | Local Road Infrastructure | Castle Park Boulevard | $37,800 | $12,600 | $12,600 |
| City of Vaughan | Local Road Infrastructure | Corrine Court | $17,700 | $5,900 | $5,900 |
| City of Vaughan | Local Road Infrastructure | Criscione Drive | $27,300 | $9,100 | $9,100 |
| City of Vaughan | Local Road Infrastructure | David Todd Avenue | $44,700 | $14,900 | $14,900 |
| City of Vaughan | Local Road Infrastructure | Emmitt Road | $28,500 | $9,500 | $9,500 |
| City of Vaughan | Local Road Infrastructure | Huntington Road | $35,000 | $11,667 | $11,667 |
| City of Vaughan | Local Road Infrastructure | Jacob Keffer Parkway | $48,000 | $16,000 | $16,000 |
| City of Vaughan | Local Road Infrastructure | Kayla Cresent | $72,300 | $24,100 | $24,100 |
| City of Vaughan | Local Road Infrastructure | Killian Road | $546,500 | $182,167 | $182,167 |
| City of Vaughan | Local Road Infrastructure | King Vaughan Road | $16,700 | $5,567 | $5,567 |
| City of Vaughan | Local Road Infrastructure | Kipling Avenue | $30,800 | $10,267 | $10,267 |
| City of Vaughan | Local Road Infrastructure | Kipling Avenue | $263,100 | $87,700 | $87,700 |
| City of Vaughan | Local Road Infrastructure | Kirkbride Crescent | $42,400 | $14,133 | $14,133 |
| City of Vaughan | Local Road Infrastructure | Kortright Place | $63,500 | $21,167 | $21,167 |
| City of Vaughan | Local Road Infrastructure | Lucena Crescent | $37,200 | $12,400 | $12,400 |
| City of Vaughan | Local Road Infrastructure | Marisa Court | $27,300 | $9,100 | $9,100 |
| City of Vaughan | Local Road Infrastructure | Maxwell Court | $52,500 | $17,500 | $17,500 |
| City of Vaughan | Local Road Infrastructure | Mc Quarrie Lane | $54,000 | $18,000 | $18,000 |
| City of Vaughan | Local Road Infrastructure | McNaughton Road | $197,400 | $65,800 | $65,800 |
| City of Vaughan | Local Road Infrastructure | Medley Court | $12,000 | $4,000 | $4,000 |
| City of Vaughan | Local Road Infrastructure | Mill Arbour Lane | $106,800 | $35,600 | $35,600 |
| City of Vaughan | Local Road Infrastructure | Millbank Court | $55,800 | $18,600 | $18,600 |
| City of Vaughan | Local Road Infrastructure | Mortimer Crescent | $18,900 | $6,300 | $6,300 |
| City of Vaughan | Local Road Infrastructure | Mount Charles Crescent | $52,500 | $17,500 | $17,500 |
| City of Vaughan | Local Road Infrastructure | Muirside Road | $25,500 | $8,500 | $8,500 |
| City of Vaughan | Local Road Infrastructure | Mustang Road | $13,200 | $4,400 | $4,400 |
| City of Vaughan | Local Road Infrastructure | Nicola Court | $18,500 | $6,167 | $6,167 |
| City of Vaughan | Local Road Infrastructure | Parsons Court | $15,000 | $5,000 | $5,000 |
| City of Vaughan | Local Road Infrastructure | Payson Avenue | $27,500 | $9,167 | $9,167 |
| City of Vaughan | Local Road Infrastructure | Pine Hollow Crescent | $46,800 | $15,600 | $15,600 |
| City of Vaughan | Local Road Infrastructure | Piper Court | $10,200 | $3,400 | $3,400 |
| City of Vaughan | Local Road Infrastructure | Porter Avenue | $22,500 | $7,500 | $7,500 |
| City of Vaughan | Local Road Infrastructure | Ridgeway Court | $39,300 | $13,100 | $13,100 |
| City of Vaughan | Local Road Infrastructure | Rimmington Drive | $159,600 | $53,200 | $53,200 |
| City of Vaughan | Local Road Infrastructure | Romina Drive | $16,500 | $5,500 | $5,500 |
| City of Vaughan | Local Road Infrastructure | Ridgefield Crescent | $243,200 | $81,067 | $81,067 |
| City of Vaughan | Local Road Infrastructure | Rose Green Drive | $323,200 | $107,733 | $107,733 |
| City of Vaughan | Local Road Infrastructure | Roselawn Drive | $299,100 | $99,700 | $99,700 |
| City of Vaughan | Local Road Infrastructure | Sequoia Road | $16,800 | $5,600 | $5,600 |
| City of Vaughan | Local Road Infrastructure | Sicilia Street | $13,800 | $4,600 | $4,600 |
| City of Vaughan | Local Road Infrastructure | Sklwood Crescent | $77,700 | $25,900 | $25,900 |
| City of Vaughan | Local Road Infrastructure | Springfield Way | $90,300 | $30,100 | $30,100 |
| City of Vaughan | Local Road Infrastructure | St. Mark Drive | $53,600 | $17,867 | $17,867 |
| City of Vaughan | Local Road Infrastructure | Stephanie Boulevard | $358,200 | $119,400 | $119,400 |
| City of Vaughan | Local Road Infrastructure | Sterling Court | $12,900 | $4,300 | $4,300 |
| City of Vaughan | Local Road Infrastructure | Stonemill Gate | $40,200 | $13,400 | $13,400 |
| City of Vaughan | Local Road Infrastructure | Summeridge Drive | $140,100 | $46,700 | $46,700 |
| City of Vaughan | Local Road Infrastructure | Swanage Drive | $79,500 | $26,500 | $26,500 |
| City of Vaughan | Local Road Infrastructure | Sylvester Court | $20,700 | $6,900 | $6,900 |
| City of Vaughan | Local Road Infrastructure | Tandian Court | $42,300 | $14,100 | $14,100 |
| City of Vaughan | Local Road Infrastructure | Terra Road | $107,300 | $35,767 | $35,767 |
| City of Vaughan | Local Road Infrastructure | Thomas Henry Road | $49,200 | $16,400 | $16,400 |
| City of Vaughan | Local Road Infrastructure | Thornhill Woods Drive | $45,000 | $15,000 | $15,000 |
| City of Vaughan | Local Road Infrastructure | Timber Lane | $84,300 | $28,100 | $28,100 |
| City of Vaughan | Local Road Infrastructure | Townsgate Drive | $126,300 | $42,100 | $42,100 |
| City of Vaughan | Local Road Infrastructure | Vera Street | $88,500 | $29,500 | $29,500 |
| City of Vaughan | Local Road Infrastructure | Via Carmine Way | $72,900 | $24,300 | $24,300 |
| City of Vaughan | Local Road Infrastructure | Villa Antica Drive | $23,700 | $7,900 | $7,900 |
| City of Vaughan | Local Road Infrastructure | Villandry Crescent | $54,000 | $18,000 | $18,000 |
| City of Vaughan | Local Road Infrastructure | Willow Tree Street | $21,600 | $7,200 | $7,200 |
| City of Vaughan | Local Road Infrastructure | Woodgreen Drive | $82,400 | $27,467 | $27,467 |
| City of Vaughan | Local Road Infrastructure | Thomson Creek Boulevard | $190,400 | $63,467 | $63,467 |
| City of Vaughan | Local Road Infrastructure | Rosegreen Drive | $167,200 | $55,733 | $55,733 |
| City of Vaughan | Local Road Infrastructure | Lockheed Avenue | $60,500 | $20,167 | $20,167 |
| City of Vaughan | Local Road Infrastructure | Ashton Drive | $52,000 | $17,333 | $17,333 |
| City of Vaughan | Local Road Infrastructure | Pine Meadow Drive | $45,800 | $15,267 | $15,267 |
| City of Vaughan | Local Road Infrastructure | Millcreek Crescent | $84,500 | $28,167 | $28,167 |
| City of Vaughan | Local Road Infrastructure | Muzich Place | $26,300 | $8,767 | $8,767 |
| City of Vaughan | Local Road Infrastructure | Adriana Louise Drive | $45,700 | $15,233 | $15,233 |
| City of Vaughan | Local Road Infrastructure | Lookout Point Court | $26,200 | $8,733 | $8,733 |
| City of Vaughan | Local Road Infrastructure | Klamath Court | $24,500 | $8,167 | $8,167 |
| City of Vaughan | Local Road Infrastructure | Monterey Road | $19,000 | $6,333 | $6,333 |
| City of Vaughan | Local Road Infrastructure | Alanno Way | $17,300 | $5,767 | $5,767 |
| City of Vaughan | Local Road Infrastructure | Monica Court | $15,700 | $5,233 | $5,233 |
| City of Windsor | Local Road Infrastructure | Tecumseh Road East Improvements | $8,400,000 | $2,800,000 | $2,800,000 |
| City of Windsor | Local Road Infrastructure | Bikeways Development | $400,000 | $133,333 | $133,333 |
| City of Windsor | Parks and Trails | Jackson Park Renewal | $800,000 | $266,667 | $266,667 |
| City of Windsor | Parks and Trails | Central Riverfront Festival Plaza | $2,000,000 | $666,667 | $666,667 |
| City of Windsor | Parks and Trails | Ganatchio Trail Reconstruction | $600,000 | $200,000 | $200,000 |
| City of Windsor | Wastewater Infrastructure | Retention Treatment Basin (RTB) | $60,000,000 | $20,000,000 | $20,000,000 |
| City of Windsor | Local Road Infrastructure | Walker/Wyandotte Intersection Improvements | $2,498,667 | $832,889 | $832,889 |
| City of Windsor | Airport Infrastructure | Airport Operations Building Rehabilitation | $2,250,000 | $750,000 | $750,000 |
| City of Windsor | Local Road Infrastructure | Walker Road Reconstruction | $11,866,667 | $3,955,555 | $3,955,556 |
| City of Windsor | Water Infrastructure | Sandwich South Employment Lands Servicing | $30,400,000 | $10,133,333 | $10,133,333 |
| City of Windsor | Airport Infrastructure | Parallel Taxiway Construction | $7,000,000 | $2,333,333 | $2,333,333 |
| City of Windsor | Local Road Infrastructure | City Centre Streetscape | $7,214,000 | $2,404,666 | $2,404,667 |
| County of Essex | Local Road Infrastructure | CR 42 from CR 25 to CR 27 Pavement Rehabilitation | $1,227,516 | $409,172 | $409,172 |
| County of Essex | Local Road Infrastructure | CR 25 from CR 42 to Hwy#401 Pavement Rehabilitation | $764,913 | $254,971 | $254,971 |
| County of Essex | Local Road Infrastructure | CR 11 - CR 8 to Hwy # 3 Pavement Rehabilitation | $923,304 | $307,768 | $307,768 |
| County of Essex | Local Road Infrastructure | CR 46 - CR 17 to 8th Conc. Pavement Rehabilitation | $864,621 | $288,207 | $288,207 |
| County of Essex | Local Road Infrastructure | CR 23 from Hwy #3 to CR 27 and CR27 from Hwy#3 to CR23 Pavement Preservation | $1,188,531 | $396,177 | $396,177 |
| County of Essex | Local Road Infrastructure | CR 43 Pavement Preservation | $187,500 | $62,500 | $62,500 |
| County of Essex | Local Road Infrastructure | CR 42 Pavement Preservation | $2,379,291 | $793,097 | $793,097 |
| County of Essex | Local Road Infrastructure | CR 2 Pavement Preservation | $1,230,639 | $410,213 | $410,213 |
| County of Essex | Local Road Infrastructure | CR 8 Pavement Preservation | $557,550 | $185,850 | $185,850 |
| County of Essex | Local Road Infrastructure | CR 14 Pavement Preservation | $1,021,521 | $340,507 | $340,507 |
| County of Essex | Local Road Infrastructure | CR 18 Pavement Preservation | $620,151 | $206,717 | $206,717 |
| County of Essex | Local Road Infrastructure | CR 21 Pavement Preservation | $334,959 | $111,653 | $111,653 |
| County of Essex | Municipal Buildings | EMS Base - Leamington | $1,500,000 | $500,000 | $500,000 |
| County of Essex | Local Road Infrastructure | CR 22 Improvement Program | $9,315,492 | $3,105,164 | $3,105,164 |
| County of Essex | Local Road Infrastructure | CR 31/3rd Concession Intersection Improvement | $1,250,000 | $416,667 | $416,667 |
| County of Essex | Local Road Infrastructure | CR 23 & CR 8 Intersection Improvement | $1,250,000 | $416,667 | $416,667 |
| County of Essex | Local Road Infrastructure | East Side Arterial Road (Leamington) | $6,300,000 | $2,100,000 | $2,100,000 |
| County of Lambton | Local Road Infrastructure | Lambton County Road 8 Rehabilitation | $1,900,000 | $633,333 | $633,333 |
| County of Lambton | Municipal Buildings | Community Health Services Department Expansion | $1,674,000 | $558,000 | $558,000 |
| County of Lambton | Municipal Buildings | Lambton County Communiciations Enhancement | $328,946 | $109,648 | $109,648 |
| County of Oxford | Municipal Buildings | Old Registry Renovation | $1,100,000 | $366,666 | $366,666 |
| County of Oxford | Local Road Infrastructure | County Road 9 | $1,687,675 | $562,558 | $562,558 |
| County of Oxford | Local Road Infrastructure | County Road 55 Rehabilitation | $1,389,850 | $463,283 | $463,283 |
| County of Oxford | Local Road Infrastructure | County Road 6 Rehabilitation | $1,191,300 | $397,100 | $397,100 |
| County of Oxford | Municipal Buildings | Turnkey Renovation | $700,000 | $233,333 | $233,333 |
| County of Oxford | Municipal Buildings | Ingersoll Water Shop | $700,000 | $233,333 | $233,333 |
| County of Oxford | Local Road Infrastructure | County Road 13 Rehabilitation | $913,330 | $304,443 | $304,443 |
| County of Simcoe | Local Road Infrastructure | Rehabilitation of Avening Bridge | $1,500,000 | $500,000 | $500,000 |
| County of Simcoe | Local Road Infrastructure | Improvements to Highway 400 Detour Route -Cty rd 19 | $4,810,000 | $1,603,333 | $1,603,333 |
| County of Simcoe | Municipal Buildings | Archives Expansion | $4,133,500 | $1,377,833 | $1,377,833 |
| County of Simcoe | Local Road Infrastructure | Improvements to Highway 400 Detour Routes | $1,000,000 | $333,333 | $333,333 |
| County of Simcoe | Local Road Infrastructure | Improvements to Highway 400 Detour Routes - Wilson Dr | $2,450,000 | $816,666 | $816,666 |
| County of Simcoe | Local Road Infrastructure | County Road 44 Improvements - Rama Rd. | $5,000,000 | $1,666,666 | $1,666,666 |
| Municipality of Chatham - Kent | Local Road Infrastructure | Coutts Line Bridge over Baptiste Creek - 4681950N | $1,200,000 | $400,000 | $400,000 |
| Municipality of Chatham - Kent | Local Road Infrastructure | Coutts Line Bridge over Government Drain 1 - 4686559N | $2,250,000 | $750,000 | $750,000 |
| Municipality of Chatham - Kent | Local Road Infrastructure | Princess Street Bridge over McGregor Creek - 4695656N | $3,250,000 | $1,083,333 | $1,083,333 |
| Municipality of Chatham - Kent | Local Road Infrastructure | LP - Sixth Line Bridge over Raleigh Plains Drain - 4688184N | $3,600,000 | $1,200,000 | $1,200,000 |
| Municipality of Chatham - Kent | Local Road Infrastructure | Base Line Bridge over Little Bear Creek East - 4713726N | $3,000,000 | $1,000,000 | $1,000,000 |
| Municipality of Chatham - Kent | Local Road Infrastructure | Sydenham River Bridge on Langstaff Line - 4719274N | $2,400,000 | $800,000 | $800,000 |
| Municipality of Chatham - Kent | Wastewater Infrastructure | King St Sanitary Sewer Relining Project | $5,000,000 | $1,666,667 | $1,666,667 |
| Municipality of Chatham - Kent | Wastewater Infrastructure | Sanitary Sewer Rehabilitation - Community of Wallaceburg - T05-152 | $1,600,000 | $533,333 | $533,333 |
| Municipality of Chatham - Kent | Wastewater Infrastructure | Sanitary Sewer Rehabilitation - Community of Wallaceburg - T07-153 | $3,500,000 | $1,166,667 | $1,166,667 |
| Municipality of Chatham - Kent | Wastewater Infrastructure | Sanitary Sewer Rehabilitation - Community of Tilbury - T07-152 | $1,200,000 | $400,000 | $400,000 |
| Municipality of Chatham - Kent | Wastewater Infrastructure | Sanitary Sewer Rehabilitation - Community of Chatham - T07-147 | $2,000,000 | $666,667 | $666,667 |
| Municipality of Chatham - Kent | Wastewater Infrastructure | Sanitary Sewer Rehabilitation - Community of Chatham - T08-147 | $2,000,000 | $666,667 | $666,667 |
| Municipality of Chatham - Kent | Wastewater Infrastructure | Van Allen Street Sanitary Sewer Separation Project | $5,000,000 | $1,666,667 | $1,666,667 |
| Municipality of Chatham - Kent | Wastewater Infrastructure | Robertson Outfall Sanitary Sewer Separation Project | $11,500,000 | $3,833,333 | $3,833,333 |
| Municipality of Chatham - Kent | Wastewater Infrastructure | Dresden Storm Sewers | $3,000,000 | $1,000,000 | $1,000,000 |
| Regional Municipality of Durham | Wastewater Infrastructure | Rosebank Road Sanitary Sewerage Pumping Station | $5,500,000 | $1,833,333 | $1,833,333 |
| Regional Municipality of Durham | Local Road Infrastructure | Road Rehabilitation of Regional Highway 2 | $1,250,000 | $416,667 | $416,667 |
| Regional Municipality of Durham | Local Road Infrastructure | Road Rehabilitation of Regional Highway 47 | $5,000,000 | $1,666,667 | $1,666,667 |
| Regional Municipality of Durham | Local Road Infrastructure | Road Rehabilitation of Regional Road 5 (Ninth Concession) | $1,000,000 | $333,333 | $333,333 |
| Regional Municipality of Durham | Local Road Infrastructure | Road Rehabilitation of Regional Road 7 (Island Road) | $1,350,000 | $450,000 | $450,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Love Crescent, Ajax, 45 houses) | $225,000 | $75,000 | $75,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Garnett Drive, Ajax, 27 houses) | $135,000 | $45,000 | $45,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Hawkins Crescent, Ajax, 75 houses) | $375,000 | $125,000 | $125,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Hillings Drive, Ajax, 30 houses) | $150,000 | $50,000 | $50,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Humphrey Drive, Ajax, 102 houses) | $510,000 | $170,000 | $170,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Kipling Crescent, Ajax, 66 houses) | $330,000 | $110,000 | $110,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Pittmann Crescent, Ajax, 105 houses) | $525,000 | $175,000 | $175,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Danton Court, Ajax, 26 houses) | $130,000 | $43,333 | $43,333 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Easton Court, Ajax, 30 houses) | $150,000 | $50,000 | $50,000 |
| Regional Municipality of Durham | Wastewater Infrastructure | Replacement of Polybutylene Service Connections (Cowan Crescent, Pickering, 59 houses) | $295,000 | $98,333 | $98,333 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Greenfield Court, Whitby, 68 houses) | $340,000 | $113,333 | $113,333 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Janedale Court, Whitby, 42 houses) | $210,000 | $70,000 | $70,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Holden Court, Whitby, 12 houses) | $60,000 | $20,000 | $20,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Kirby Court, Whitby, 99 houses) | $495,000 | $165,000 | $165,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Winston Court, Whitby, 40 houses) | $200,000 | $66,667 | $66,667 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Vanessa Place, Whitby, 57 houses) | $285,000 | $95,000 | $95,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Mayflower Street, Whitby, 19 houses) | $95,000 | $31,667 | $31,667 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Lowder Place, Whitby, 57 houses) | $285,000 | $95,000 | $95,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Fieldview Crescent, Whitby, 35 houses) | $175,000 | $58,333 | $58,333 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Elmeroy Court, Whitby, 30 houses) | $150,000 | $50,000 | $50,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Sawdon Drive, Whitby, 21 houses) | $105,000 | $35,000 | $35,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Bellwood Drive, Whitby, 20 houses) | $100,000 | $33,333 | $33,333 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Roundelay Court, Oshawa, 97 houses) | $485,000 | $161,667 | $161,667 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Sagebush Street, Oshawa, 44 houses) | $220,000 | $73,333 | $73,333 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Overbank Drive, Oshawa, 137 houses) | $685,000 | $228,333 | $228,333 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Lichen Crescent, Oshawa, 55 houses) | $275,000 | $91,667 | $91,667 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Castlegrove Avenue, Oshawa, 23 houses) | $115,000 | $38,333 | $38,333 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Adele Crescent, Oshawa, 42 houses) | $210,000 | $70,000 | $70,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Homestead Court, Oshawa, 69 houses) | $345,000 | $115,000 | $115,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Nevada Court, Oshawa, 9 houses) | $45,000 | $15,000 | $15,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Elite Court, Oshawa, 28 houses) | $140,000 | $46,667 | $46,667 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Barry Drive, Pickering, 21 houses) | $105,000 | $35,000 | $35,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Edmund Drive, Pickering, 10 houses) | $50,000 | $16,667 | $16,667 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Portland Court, Pickering, 41 houses) | $205,000 | $68,333 | $68,333 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Sundown Crescent, Pickering, 52 houses) | $260,000 | $86,667 | $86,667 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Cat Tail Court, Pickering, 26 houses) | $130,000 | $43,333 | $43,333 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Steel Hill, Pickering, 37 houses) | $185,000 | $61,667 | $61,667 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Lightfoot Place, Pickering, 48 houses) | $240,000 | $80,000 | $80,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Sheppard Avenue, Pickering, 13 houses) | $65,000 | $21,667 | $21,667 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Anthony Court, Pickering, 7 houses) | $35,000 | $11,667 | $11,667 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Foster Court, Pickering, 14 houses) | $70,000 | $23,333 | $23,333 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Houston Court, Pickering, 8 houses) | $45,000 | $15,000 | $15,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Mooreland Court, Pickering, 77 houses) | $385,000 | $128,333 | $128,333 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Rosebank Road, Pickering, 16 houses) | $80,000 | $26,667 | $26,667 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Dalewood Drive, Pickering, 42 houses) | $210,000 | $70,000 | $70,000 |
| Regional Municipality of Durham | Water Infrastructure | Replacement of Polybutylene Service Connections (Brookridge Gate, Pickering, 14 houses) | $70,000 | $23,333 | $23,333 |
| Regional Municipality of Durham | Local Road Infrastructure | Road Rehabilitation of Church Street (Regional Road 24) | $350,000 | $116,667 | $116,667 |
| Regional Municipality of Durham | Local Road Infrastructure | Road Rehabilitation of Regional Road 21 (Goodwood Road) | $500,000 | $166,667 | $166,667 |
| Regional Municipality of Durham | Local Road Infrastructure | Road Rehabilitation of Regional Road 60 (Wentworth Street) | $550,000 | $183,333 | $183,333 |
| Regional Municipality of Durham | Local Road Infrastructure | Roadside Protection Improvements - Ajax (1 location) | $11,000 | $3,667 | $3,667 |
| Regional Municipality of Halton | Wastewater Infrastructure | Oakville Southwest (Phase III) Wastewater Treatment Plant | $50,200,000 | $16,733,333 | $16,733,333 |
| Regional Municipality of Halton | Local Road Infrastructure | Tremaine Road Widening | $16,000,000 | $5,333,333 | $5,333,333 |
| Regional Municipality of Niagara | Wastewater Infrastructure | Baker Road Wastewater Treatment Plant (WWTP) Upgrade | $25,000,000 | $8,333,333 | $8,333,333 |
| Regional Municipality of Niagara | Wastewater Infrastructure | Frenchman's Creek Sewage Servicing | $20,000,000 | $6,666,667 | $6,666,667 |
| Regional Municipality of Niagara | Wastewater Infrastructure | Seaway Wastewater Treatment Plant (WWTP) Expansion | $22,000,000 | $7,333,333 | $7,333,333 |
| Regional Municipality of Niagara | Local Road Infrastructure | Regional Road 101 (Mountain Road) Reconstruction & Storm Drainage Project | $3,500,000 | $1,166,000 | $1,167,000 |
| Regional Municipality of Niagara | Wastewater Infrastructure | Combined Sewer Overflow High Rate Treatment - Niagara Falls Wastewater Treatment Plant (WWTP) | $15,000,000 | $5,000,000 | $5,000,000 |
| Regional Municipality of Peel | Wastewater Infrastructure | Clarkway Drive Trunk Sewer | $4,738,249 | $1,579,417 | $1,579,416 |
| Regional Municipality of Peel | Wastewater Infrastructure | Lionhead Pumping Station, Decommissioning and Gravity Sewer Connection | $1,500,000 | $500,000 | $500,000 |
| Regional Municipality of Peel | Water Infrastructure | MEADOWVALE NORTH PUMPING STATION EXPANSION | $7,467,000 | $2,489,000 | $2,489,000 |
| Regional Municipality of Peel | Water Infrastructure | SILVERTHORN PUMPING STATION IMPROVEMENTS AND UPGRADES | $3,271,000 | $1,090,333 | $1,090,333 |
| Regional Municipality of Peel | Water Infrastructure | REPLACEMENT OF ROOF MEMBRANE AT BECKETT SPROULE RESERVOIR | $1,500,000 | $500,000 | $500,000 |
| Regional Municipality of Peel | Water Infrastructure | ESERVOIR REHABILITATION PROJECT - EAST BRAMPTON CELLS 1 AND 2 | $1,000,000 | $333,333 | $333,333 |
| Regional Municipality of Peel | Water Infrastructure | RESERVOIR REHABILITATION PROJECT - EAST BRAMPTON CELLS 3 AND 4 | $1,200,000 | $400,000 | $400,000 |
| Regional Municipality of Peel | Water Infrastructure | RESERVOIR REHABILITATION PROJECT - SILVERTHORN RESERVOIR | $1,500,000 | $500,000 | $500,000 |
| Regional Municipality of Peel | Water Infrastructure | Interconnection of Caledon East and Palgrave Water System | $4,184,590 | $1,394,863 | $1,394,863 |
| Regional Municipality of Peel | Water Infrastructure | REPLACEMENT OF OLD WATERMAINS IN THE CITY OF MISSISSAUGA | $36,786,050 | $12,262,016 | $12,262,016 |
| Regional Municipality of Peel | Water Infrastructure | Replacement of Old Watermains in the City of Brampton | $25,129,762 | $8,376,587 | $8,376,587 |
| Regional Municipality of Peel | Water Infrastructure | WATER SERVICING FOR THE COMMUNITES OF CAMPBELL''''S CROSS AND VICTORIA IN TOWN OF CALEDON | $5,151,300 | $1,717,100 | $1,717,100 |
| Regional Municipality of Peel | Wastewater Infrastructure | Intermodal Sewage Pumping Station Enhancements | $550,000 | $183,334 | $183,333 |
| Regional Municipality of Peel | Cultural Infrastructure | Peel Heritage Complex Expansion and Revitalization | $10,000,000 | $3,333,334 | $3,333,333 |
| Regional Municipality of Peel | Local Road Infrastructure | Road Resurfacing - Airport Road from Steeles Avenue to Queen Street | $3,327,000 | $1,109,000 | $1,109,000 |
| Regional Municipality of Peel | Local Road Infrastructure | Road Resurfacing - Dixie Road from Highway 401 to Derry Road | $6,723,000 | $2,241,000 | $2,241,000 |
| Regional Municipality of Peel | Local Road Infrastructure | Road Resurfacing - Cawthra Road from Lakeshore Road to North Service Road | $3,031,000 | $1,010,334 | $1,010,333 |
| Regional Municipality of Peel | Local Road Infrastructure | Road Resurfacing - Hwy. 50 from Countryside Dr. to Coleraine Dr. | $1,204,580 | $401,527 | $401,527 |
| Regional Municipality of Peel | Local Road Infrastructure | Road Resurfacing - King Street from Creditview Road to Mississauga Road | $429,390 | $143,130 | $143,130 |
| Regional Municipality of Peel | Local Road Infrastructure | Road Resurfacing - Mayfield Road from McLaughlin Road to Mississauga Road | $900,000 | $300,000 | $300,000 |
| Regional Municipality of Peel | Local Road Infrastructure | Road Resurfacing - on the Forks of the Credit Road from Hurontario Street to approximately 6 km westerly | $3,900,000 | $1,300,000 | $1,300,000 |
| Regional Municipality of Peel | Municipal Buildings | Malton Paramedic Satelite Station | $799,998 | $266,666 | $266,666 |
| Regional Municipality of Peel | Municipal Buildings | Major Rehabilitation and Repair Works to Municipal Facilities at Copper Road | $1,276,800 | $425,600 | $425,600 |
| Regional Municipality of Peel | Municipal Buildings | Police Fleet Garage and Inventory Stores | $9,000,000 | $3,000,000 | $3,000,000 |
| Regional Municipality of Peel | Water Infrastructure | Port Credit Trunk Sewer and Forcemain | $8,832,800 | $2,944,267 | $2,944,267 |
| Regional Municipality of Peel | Water Infrastructure | McVean Drive Trunk Sewer | $4,485,775 | $1,495,259 | $1,495,258 |
| Regional Municipality of Waterloo | Solid Waste Management Infrastructure | Main Scales and Scalehouse Replacement | $1,500,000 | $500,000 | $500,000 |
| Regional Municipality of Waterloo | Solid Waste Management Infrastructure | Landfill Gas Pipeline Twinning | $1,650,000 | $550,000 | $550,000 |
| Regional Municipality of Waterloo | Municipal Buildings | Operations Center Photovoltaic System | $1,500,000 | $500,000 | $500,000 |
| Regional Municipality of Waterloo | Wastewater Infrastructure | Upgrade of The Galt Wastewater Treatment Plant Digester | $6,000,000 | $2,000,000 | $2,000,000 |
| Regional Municipality of Waterloo | Wastewater Infrastructure | Replacement of The Hespeler Wastewater Treatment Plant Raw Sewage Pumping Station | $9,999,900 | $3,333,300 | $3,333,300 |
| Regional Municipality of Waterloo | Wastewater Infrastructure | Upgrade of The Galt & Preston Wastewater Treatment Plants SCADA System | $9,999,900 | $3,333,300 | $3,333,300 |
| Regional Municipality of Waterloo | Local Road Infrastructure | Reg. Rd. 22 (Northfield Drive) from Waterloo/Woolwich Bdry. to Scotch Line Rd. | $2,010,000 | $670,000 | $670,000 |
| Regional Municipality of Waterloo | Local Road Infrastructure | Reg. Rd. 22 (Northfield Drive) from Line 86 to Waterloo/Wellington Bdry. | $2,340,000 | $780,000 | $780,000 |
| Regional Municipality of Waterloo | Local Road Infrastructure | Reg. Rd. 23 (Katherine Street) from Cox Creek to Line 86 | $1,065,000 | $355,000 | $355,000 |
| Regional Municipality of Waterloo | Local Road Infrastructure | Reg. Rd. 55 (Victoria Street) from 0.73 Km's east of Ebycrest Rd. to Frederick St. | $4,200,000 | $1,400,000 | $1,400,000 |
| Regional Municipality of Waterloo | Local Road Infrastructure | Reg. Rd. 86 (Line 86) from Waterloo/Wellington Bdry. to Cox Creek Bridge | $1,575,000 | $525,000 | $525,000 |
| Regional Municipality of Waterloo | Local Road Infrastructure | Reg. Rd. 97 (Cedar Creek Road) from Edworthy Side Road to Waterloo/Oxford Bdry. | $3,450,000 | $1,150,000 | $1,150,000 |
| Regional Municipality of Waterloo | Local Road Infrastructure | Reg. Rd. 97 (Main Street) from Shellard Side Rd. to 200 metres east of Franklin Blvd. | $1,110,000 | $370,000 | $370,000 |
| Regional Municipality of York | Local Road Infrastructure | Dufferin Street Resurfacing | $2,100,000 | $700,000 | $700,000 |
| Regional Municipality of York | Local Road Infrastructure | Bathurst Street Microsurfacing | $1,350,000 | $450,000 | $450,000 |
| Regional Municipality of York | Local Road Infrastructure | Highway 27 Resurfacing | $9,100,000 | $3,033,333 | $3,033,333 |
| Regional Municipality of York | Local Road Infrastructure | Keele Street Resurfacing | $1,250,000 | $416,667 | $416,667 |
| Regional Municipality of York | Local Road Infrastructure | Old Homestead Road Resurfacing | $1,560,000 | $520,000 | $520,000 |
| Regional Municipality of York | Local Road Infrastructure | Warden Avenue Resurfacing | $1,975,000 | $658,333 | $658,333 |
| Regional Municipality of York | Local Road Infrastructure | Bathurst Street Resurfacing | $1,800,000 | $600,000 | $600,000 |
| Regional Municipality of York | Local Road Infrastructure | Weston Road Resurfacing | $1,350,000 | $450,000 | $450,000 |
| Regional Municipality of York | Local Road Infrastructure | Davis Drive Resurfacing | $2,300,000 | $766,667 | $766,666 |
| Regional Municipality of York | Solid Waste Management Infrastructure | Richmond Hill Community Environmental Centre | $9,750,000 | $3,250,000 | $3,250,000 |
| Regional Municipality of York | Water Infrastructure | Georgina Water Treatment Plant Upgrade | $7,200,000 | $2,400,000 | $2,400,000 |
| Regional Municipality of York | Water Infrastructure | Water & Wastewater - Instrumentation and Control Replacement | $1,100,000 | $366,666 | $366,667 |
| Regional Municipality of York | Public Transit Infrastructure | Rehabilitation of Concrete Bus Stops | $2,900,000 | $966,666 | $966,667 |
| Regional Municipality of York | Public Transit Infrastructure | Rehabilitation of Bus Loops | $2,000,000 | $666,666 | $666,667 |
| Regional Municipality of York | Local Road Infrastructure | Gamble Road from Bathurst Street to Yonge Street | $3,700,000 | $1,233,333 | $1,233,333 |
| Regional Municipality of York | Municipal Buildings | EMS Central Support Facility and Health Connection/Contact Centre | $22,000,000 | $7,333,333 | $7,333,333 |
| Regional Municipality of York | Solid Waste Management Infrastructure | Garfield Material Recovery Facility Upgrades | $7,600,000 | $2,533,333 | $2,533,333 |
| Town of Markham | Municipal Buildings | Thornhill Community Centre & Library Expansion | $6,000,000 | $2,000,000 | $2,000,000 |
| Town of Markham | Municipal Buildings | Facility Accessibility, Energy Retrofit and Emergency Operations Centre Rehabilitation | $7,200,000 | $2,400,000 | $2,400,000 |
| Town of Oakville | Public Transit Infrastructure | Priority #1 -Oakville Transit Facility Renewal and Expansion | $45,000,000 | $15,000,000 | $15,000,000 |
| Town of Richmond Hill | Municipal Buildings | Eyer Homestead Historical House Restoration | $3,060,000 | $1,020,000 | $1,020,000 |
| Town of Richmond Hill | Municipal Buildings | George Forster Historical House and Barn Restoration | $2,276,000 | $758,666 | $758,666 |
| Town of Richmond Hill | Local Road Infrastructure | Town-wide Cycling Infrastructure Project | $1,031,435 | $343,811 | $343,811 |
| Town of Richmond Hill | Municipal Buildings | Elgin Barrow Arena Rehabilitation | $4,068,000 | $1,356,000 | $1,356,000 |
| Town of Richmond Hill | Local Road Infrastructure | Axminster Drive Road Reconstruction | $1,712,000 | $424,000 | $424,000 |
| Town of Richmond Hill | Local Road Infrastructure | Leisure Lane Road Reconstruction | $3,767,000 | $933,000 | $933,000 |
| Town of Richmond Hill | Local Road Infrastructure | Clairage Drive Road Reconstruction | $6,238,000 | $1,545,000 | $1,545,000 |
| Town of Whitby | Municipal Buildings | Brooklin Community Centre and Library | $14,560,000 | $4,853,333 | $4,853,333 |
| Town of Whitby | Municipal Buildings | Anne Ottenbrite Pool - Accessibility Improvements | $3,500,000 | $1,166,666 | $1,166,666 |
| Beauchamp Local Roads Board | Local Road Infrastructure | Airport Road | $60,000 | $19,800 | $19,800 |
| Beauchamp Local Roads Board | Local Road Infrastructure | McLean Road Upgrade | $40,000 | $13,200 | $13,200 |
| City of Belleville | Local Road Infrastructure | Dundas Street West CPR Overpass Rehabilitation (Priority Three) | $2,000,001 | $666,667 | $666,667 |
| City of Brockville | Wastewater Infrastructure | Jessie St./George St. Sewer Seperation | $1,500,000 | $500,000 | $500,000 |
| City of Clarence - Rockland | Water Infrastructure | Regional Water Supply - Phase 2 | $26,737,691 | $8,912,563 | $8,912,563 |
| City of Cornwall | Municipal Buildings | New Emergency Medical Services Headquarters Building | $5,100,000 | $1,700,000 | $1,700,000 |
| City of Cornwall | Water Infrastructure | Brookdale Avenue Water Main | $2,100,000 | $700,000 | $700,000 |
| City of Dryden | Water Infrastructure | Water Meter Implementation | $1,800,000 | $600,000 | $600,000 |
| City of Elliot Lake | Wastewater Infrastructure | Hwy 108 Sanitary Sewer Line | $1,795,000 | $598,274 | $598,274 |
| City of Elliot Lake | Water Infrastructure | Pearson Drive Water Main | $931,000 | $307,230 | $307,230 |
| City of Kawartha Lakes | Wastewater Infrastructure | North West Trunk | $5,000,000 | $1,666,666 | $1,666,666 |
| City of Kenora | Local Road Infrastructure | Highway 17 Gateway Rehabilitation Project | $7,000,000 | $2,333,333 | $2,333,333 |
| City of Niagara Falls | Local Road Infrastructure | Drummond Road Reconstruction | $6,300,000 | $2,100,000 | $2,100,000 |
| City of North Bay | Water Infrastructure | Algonquin/Front Rehabiliation Program | $14,000,000 | $4,666,667 | $4,666,667 |
| City of Orillia | Local Road Infrastructure | Albany Avenue Rehabilitation | $2,000,000 | $666,666 | $666,667 |
| City of Pembroke | Brownfield Redevelopment Infrastructure | Winter Maintenance and Control Activities Facility | $1,500,000 | $500,000 | $500,000 |
| City of Peterborough | Cultural Infrastructure | Market Hall Restoration Project | $9,686,000 | $3,228,667 | $3,228,667 |
| City of Port Colborne | Parks and Trails | Soccer Complex Restoration and Rehabilitation | $300,000 | $100,000 | $100,000 |
| City of Port Colborne | Water Infrastructure | Catharine Street Watermain | $650,000 | $216,667 | $216,667 |
| City of Quinte West | Water Infrastructure | Batawa-Frankford Water and Wastewater Development | $5,000,000 | $1,666,667 | $1,666,667 |
| City of Sarnia | Local Road Infrastructure | Wellington Street Reconstruction [Murphy Road to Research Park Drive] | $11,700,000 | $3,900,000 | $3,900,000 |
| City of Sault Ste. Marie | Municipal Buildings | New Municipal Building for Algoma Public Health | $22,000,000 | $7,333,333 | $7,333,333 |
| City of Sault Ste. Marie | Parks and Trails | Hub Trail & Waterfront Walkway Expansion | $5,000,000 | $1,666,667 | $1,666,667 |
| City of St. Thomas | Wastewater Infrastructure | Wellington Street Reconstruction | $3,600,000 | $1,200,000 | $1,200,000 |
| City of St. Thomas | Airport Infrastructure | St. Thomas Municipal Airport Corporate Hangar | $1,500,000 | $500,000 | $500,000 |
| City of Stratford | Wastewater Infrastructure | Southside Storm System Downie Pon | $8,167,500 | $2,722,500 | $2,722,500 |
| City of Temiskaming Shores | Local Road Infrastructure | Haileybury Water Reservoir 1 Replacement | $1,020,000 | $340,000 | $340,000 |
| City of Thorold | Local Road Infrastructure | Seburn Road Bridge Replacement | $450,000 | $150,000 | $150,000 |
| City of Waterloo | Local Road Infrastructure | Pinewood Place Reconstruction | $862,600 | $287,533 | $287,533 |
| City of Waterloo | Local Road Infrastructure | Bearinger Road Corridor Improvements | $2,050,000 | $683,333 | $683,333 |
| City of Waterloo | Local Road Infrastructure | Columbia Street Corridor Improvements | $1,210,000 | $403,333 | $403,333 |
| City of Welland | Local Road Infrastructure | Thorold Road Intersection & Roadway Improvements | $6,000,000 | $2,000,000 | $2,000,000 |
| City of Woodstock | Municipal Buildings | Public Works Building Expansion | $450,000 | $150,000 | $150,000 |
| County of Brant | Local Road Infrastructure | County Road 16 Rehabilitation | $6,300,000 | $2,100,000 | $2,100,000 |
| County of Bruce | Local Road Infrastructure | WEST ROAD | $2,100,000 | $700,000 | $700,000 |
| County of Bruce | Local Road Infrastructure | BRUCE COUNTY ROAD 17 | $1,350,000 | $450,000 | $450,000 |
| County of Bruce | Water Infrastructure | FORRESTER''''S BRIDGE | $492,000 | $164,000 | $164,000 |
| County of Elgin | Local Road Infrastructure | Calton Line Rehabilitation | $2,060,000 | $686,667 | $686,667 |
| County of Frontenac | Municipal Buildings | Ambulance Station - Township of South Frontenac | $750,000 | $250,000 | $250,000 |
| County of Frontenac | Municipal Buildings | Ambulance Accommodation - Township of Frontenac Islands | $102,000 | $34,000 | $34,000 |
| County of Grey | Municipal Buildings | Construction of Durham Maintenance Depot | $1,500,000 | $500,000 | $500,000 |
| County of Haliburton | Local Road Infrastructure | Road # 1 Rehabilitation | $900,000 | $300,000 | $300,000 |
| County of Haliburton | Local Road Infrastructure | Blue Hawk Culvert Replacement Priority 2 | $800,000 | $266,666 | $266,667 |
| County of Haliburton | Local Road Infrastructure | Road No. 503 Rehabilitation Priority #3 | $1,124,000 | $374,667 | $374,667 |
| County of Hastings | Local Road Infrastructure | Rehabilitation of Bayshore Road | $684,342 | $228,114 | $228,114 |
| County of Hastings | Parks and Trails | Hastings Heritage Trail Improvements | $126,000 | $42,000 | $42,000 |
| County of Huron | Local Road Infrastructure | County Rd. 14 Resurfacing | $1,817,198 | $302,866 | $302,866 |
| County of Huron | Local Road Infrastructure | County Rd. 19 Resurfacing | $1,713,090 | $571,030 | $571,030 |
| County of Lennox & Addington | Local Road Infrastructure | County Road 41 Reconstruction (7.5km) | $8,044,601 | $2,681,534 | $2,681,534 |
| County of Middlesex | Local Road Infrastructure | County Road 81 (Grand Bend Road) Rehabilitation | $1,428,287 | $476,096 | $476,096 |
| County of Northumberland | Municipal Buildings | County of Northumberland/United Way EMS Headquarters/ Food 4 All Warehouse | $1,375,000 | $458,333 | $458,333 |
| County of Perth | Municipal Buildings | Mitchell EMS Base | $930,000 | $310,000 | $310,000 |
| County of Perth | Local Road Infrastructure | Perth Road 135 Rehabilitation | $886,800 | $295,600 | $295,600 |
| County of Peterborough | Local Road Infrastructure | Taylors Bridge Replacement | $1,099,998 | $366,666 | $366,666 |
| County of Prince Edward | Local Road Infrastructure | Rehabilitation of County Road #25 | $770,000 | $256,666 | $256,666 |
| County of Prince Edward | Local Road Infrastructure | Rehabilitation of County Road # 15 | $3,500,000 | $1,166,666 | $1,166,666 |
| County of Renfrew | Local Road Infrastructure | Rehabilitation of County Road 515, Palmer Road from Palmer Rapids to Combermere | $1,100,000 | $366,666 | $366,666 |
| District of Nippissing Social Services Administration Board | Municipal Buildings | DNSSAB Accommodation | $2,701,397 | $900,465 | $900,465 |
| Eby-Grenfell Local Roads Board | Local Road Infrastructure | Beverly Street Improvement | $49,114 | $16,371 | $16,371 |
| Foleyet Local Service Board | Municipal Buildings | Foleyet Community Hall Renovations | $49,250 | $16,417 | $16,417 |
| Lappe Local Service Board | Municipal Buildings | Lappe Volunteer Fire Department Hall Expansion | $145,800 | $48,600 | $48,600 |
| Loyalist Township | Local Road Infrastructure | Amherst Island Culvert Replacement Project | $333,000 | $111,000 | $111,000 |
| Magnetawan | Local Road Infrastructure | Rehabilitiation of Ahmick Lk Rd. | $630,000 | $210,000 | $210,000 |
| Municipality of Arran - Elderslie | Water Infrastructure | Ross Street Watermain, Paisley | $791,250 | $263,750 | $263,750 |
| Municipality of Bayham | Local Road Infrastructure | Carson Line Bridge | $97,200 | $32,400 | $32,400 |
| Municipality of Brighton | Local Road Infrastructure | Reconstruction of Drewery Street | $1,130,226 | $376,742 | $376,742 |
| Municipality of Callander | Wastewater Infrastructure | Standyby Power Generation | $300,000 | $100,000 | $100,000 |
| Municipality of Calvin | Solid Waste Management Infrastructure | Landfill Site Expansion Project | $79,200 | $26,400 | $26,400 |
| Municipality of Central Elgin | Water Infrastructure | Port Stanley Watermain Project | $478,000 | $159,333 | $159,333 |
| Municipality of Central Huron | Disaster Mitigation Infrastructure | Fire Hall | $1,305,000 | $435,000 | $435,000 |
| Municipality of Central Huron | Local Road Infrastructure | Orchard Line Road Repaving Project | $1,260,000 | $420,000 | $420,000 |
| Municipality of Clarington | Local Road Infrastructure | Concession Road 6 Pavement Rehabilitation - Old Scugog Road to Acres Road | $2,480,001 | $826,667 | $826,667 |
| Municipality of Dutton - Dunwich | Local Road Infrastructure | Chalmers Line Culvert Replacement | $315,000 | $105,000 | $105,000 |
| Municipality of Dutton - Dunwich | Wastewater Infrastructure | Improvements to Sewer System | $1,025,000 | $341,667 | $341,667 |
| Municipality of French River | Local Road Infrastructure | Rehabilitation of Shaw Road | $1,500,000 | $500,000 | $500,000 |
| Municipality of Gordon/Barrie Island | Parks and Trails | Gordon/Barrie Island Parks Rehabilitation | $187,471 | $62,490 | $62,490 |
| Municipality of Grey Highlands | Municipal Buildings | Flesherton Arena & Community Hall Complex | $450,000 | $150,000 | $150,000 |
| Municipality of Hastings Highlands | Municipal Buildings | Hastings Highlands Recreational/Cultural Facility | $4,568,000 | $1,522,667 | $1,522,667 |
| Municipality of Hastings Highlands | Local Road Infrastructure | Reconstruction of Peterson Road | $2,100,000 | $700,000 | $700,000 |
| Municipality of Highlands East | Local Road Infrastructure | Hadlington Road | $750,600 | $250,200 | $250,200 |
| Municipality of Huron East | Local Road Infrastructure | Cranbrook McNabb Road Resurfacing and Bridge Deck Waterproofing | $1,400,000 | $466,666 | $466,666 |
| Municipality of Huron Shores | Local Road Infrastructure | Dayton Road Loop (Sections 9-11) | $400,000 | $133,333 | $133,333 |
| Municipality of Huron Shores | Local Road Infrastructure | Maple Ridge Road Rehabilitation | $86,000 | $28,667 | $28,667 |
| Municipality of Kincardine | Municipal Buildings | Connaught Park Fair Grounds Accessibility Project | $300,000 | $100,000 | $100,000 |
| Municipality of Lambton Shores | Local Road Infrastructure | Grand Bend Main Street Redevelopment | $2,612,491 | $870,830 | $870,830 |
| Municipality of Lambton Shores | Municipal Buildings | Thedford Bosanquet Community Centre Revitalization | $4,500,000 | $1,500,000 | $1,500,000 |
| Municipality of Lambton Shores | Parks and Trails | Thedford Village Green | $503,698 | $167,899 | $167,899 |
| Municipality of Leamington | Local Road Infrastructure | Erie at Seacliff Intersection Improvements | $2,600,000 | $866,667 | $866,667 |
| Municipality of Leamington | Municipal Buildings | New Administration Building | $12,500,000 | $4,166,667 | $4,166,667 |
| Municipality of Magnetawan | Municipal Buildings | New Municipal Complex | $2,001,000 | $667,000 | $667,000 |
| Municipality of Markstay - Warren | Local Road Infrastructure | Salt Dome Warren Garage | $300,000 | $100,000 | $100,000 |
| Municipality of Marmora and Lake | Local Road Infrastructure | Rehabilitation of Centre Line Road | $295,000 | $98,333 | $98,333 |
| Municipality of Marmora and Lake | Water Infrastructure | Marmora and Lake SCADA Upgrades | $450,000 | $150,000 | $150,000 |
| Municipality of McDougall | Municipal Buildings | Public Works Building | $244,000 | $81,333 | $81,333 |
| Municipality of Meaford | Local Road Infrastructure | 3rd Line Rehabilitation | $191,000 | $63,667 | $63,667 |
| Municipality of Meaford | Water Infrastructure | Boucher and Victoria Water Main | $203,000 | $67,667 | $67,667 |
| Municipality of Meaford | Municipal Buildings | Community Center/Arena Roof Replacement | $165,000 | $55,000 | $55,000 |
| Municipality of Middlesex Centre | Municipal Buildings | Denfield Operations Centre | $6,000,000 | $2,000,000 | $2,000,000 |
| Municipality of Neebing | Local Road Infrastructure | Pardee Road Resurfacing Project | $431,460 | $143,820 | $143,820 |
| Municipality of Neebing | Municipal Buildings | Sand/Salt Storage Shed | $100,000 | $33,333 | $33,333 |
| Municipality of North Perth | Municipal Buildings | Rehabilitation of North Perth Administration Building | $3,600,000 | $1,200,000 | $1,200,000 |
| Municipality of Northern Bruce Peninsula | Municipal Buildings | Municipal building at Ferndale for Tourism and Public Washroom Facility at the Ferndale Park | $400,000 | $133,333 | $133,333 |
| Municipality of Oliver Paipoonge | Municipal Buildings | Kakabeka Fire Station | $312,000 | $104,000 | $104,000 |
| Municipality of Oliver Paipoonge | Cultural Infrastructure | Rosslyn Library Addition | $300,000 | $100,000 | $100,000 |
| Municipality of Port Hope | Municipal Buildings | Joint Operations Centre | $5,017,344 | $1,672,448 | $1,672,448 |
| Municipality of Shuniah | Local Road Infrastructure | Grandview Beach Rehabilitation and Asphalt Paving | $976,776 | $325,592 | $325,592 |
| Municipality of South Bruce | Cultural Infrastructure | TEESWATER LIBRARY RENOVATION & ACCESSIBILITY PROJECT | $345,000 | $115,000 | $115,000 |
| Municipality of South Huron | Water Infrastructure | Huron Park Industrial Area Reconstruction | $6,800,000 | $2,266,666 | $2,266,666 |
| Municipality of Southwest Middlesex | Municipal Buildings | Ekfrid Community Centre Renovation | $250,000 | $83,333 | $83,333 |
| Municipality of Southwest Middlesex | Municipal Buildings | Glencoe Fire Hall Replacement | $1,000,000 | $333,333 | $333,333 |
| Municipality of St. Charles | Local Road Infrastructure | Musky Bay Road Re-alignment | $711,740 | $237,009 | $237,009 |
| Municipality of Trent Hills | Water Infrastructure | Watermain Replacement-Hastings | $1,811,253 | $603,751 | $603,751 |
| Municipality of Trent Hills | Wastewater Infrastructure | Sewer Separation and Infrastructure Renewal | $1,950,294 | $650,098 | $650,098 |
| Municipality of Tweed | Cultural Infrastructure | New Tweed Public Library Initiative | $900,000 | $300,000 | $300,000 |
| Municipality of Tweed | Local Road Infrastructure | Rehabilitation of Marlbank Road | $1,409,950 | $469,983 | $469,983 |
| Municipality of Wawa | Airport Infrastructure | Wawa Airside Pavement Rehabilitation | $801,419 | $267,140 | $267,140 |
| Municipality of Wawa | Municipal Buildings | Michipicoten Memorial Community Centre - Upgrades | $175,000 | $58,333 | $58,333 |
| Municipality of West Elgin | Municipal Buildings | WEST ELGIN ARENA REHABILITATION | $600,000 | $200,000 | $200,000 |
| Municipality of West Grey | Municipal Buildings | Police/Fire Station Building Rehabilitation | $100,000 | $33,333 | $33,333 |
| Municipality of West Grey | Municipal Buildings | Neustadt Arena Rehabilitation | $200,000 | $66,667 | $66,667 |
| Municipality of West Grey | Municipal Buildings | Normanby Arena Rehabilitation | $200,000 | $66,667 | $66,667 |
| Municipality of West Nipissing | Municipal Buildings | Municipal Buildings Restoration Project | $510,000 | $170,000 | $170,000 |
| Municipality of West Nipissing | Parks and Trails | Minnehaha Bay Community Waterfront Park | $6,233,000 | $2,077,667 | $2,077,667 |
| Municipality of West Perth | Local Road Infrastructure | St. Andrew Street Reconstruction | $1,400,000 | $466,666 | $466,666 |
| Municipality of Whitestone | Municipal Buildings | Hagerman Community Centre Renovations | $50,000 | $16,667 | $16,667 |
| Norfolk County | Local Road Infrastructure | County Road 42 Road Rehibiliation | $8,280,000 | $2,760,000 | $2,760,000 |
| Norfolk County | Municipal Buildings | Langton Arena Upgrades | $750,000 | $250,000 | $250,000 |
| Parry Sound District Social Services Administration | Municipal Buildings | Esprit Place Family Centre Accessible Entranceway and Expansion | $247,446 | $82,482 | $82,482 |
| Separated Town of Gananoque | Wastewater Infrastructure | Sanitary Sewer Infiltration Control Project | $450,000 | $150,000 | $150,000 |
| Separated Town of Prescott | Wastewater Infrastructure | Sludge Drying Tanks | $780,000 | $260,000 | $260,000 |
| Separated Town of Prescott | Wastewater Infrastructure | Prince Street Rehabilitation Program | $1,200,000 | $400,000 | $400,000 |
| Separated Town of Smiths Falls | Local Road Infrastructure | Replacement of Streetlighting | $870,000 | $290,000 | $290,000 |
| Separated Town of St. Marys | Water Infrastructure | St. Marys Water Tower Re-lining | $200,000 | $66,667 | $66,667 |
| The Corporation of the Town of Perth | Local Road Infrastructure | Wilson Street Corridor Rehabilitation | $9,100,000 | $3,033,333 | $3,033,333 |
| The Corporation of the Town of Perth | Local Road Infrastructure | Drummond Street West Corridor Rehabilitation | $390,000 | $130,000 | $130,000 |
| Town of Ajax | Cultural Infrastructure | St. Francis de Sales Rehabilitation and Retrofit | $2,557,419 | $852,473 | $852,473 |
| Town of Amherstburg | Local Road Infrastructure | Dalhousie Street Reconstruction | $2,000,000 | $666,666 | $666,666 |
| Town of Amherstburg | Wastewater Infrastructure | Victoria Street Sewer Separation | $930,000 | $310,000 | $310,000 |
| Town of Arnprior | Airport Infrastructure | Taxiway Reconstruction | $100,000 | $33,333 | $33,333 |
| Town of Arnprior | Cultural Infrastructure | Arnprior Library Expansion | $675,000 | $225,000 | $225,000 |
| Town of Aurora | Parks and Trails | Park Development | $250,000 | $83,333 | $83,333 |
| Town of Aurora | Municipal Buildings | Energy Management and Building System Retro-fits | $740,400 | $246,800 | $246,800 |
| Town of Aylmer | Municipal Buildings | Town Hall Basement Retrofit | $234,000 | $78,000 | $78,000 |
| Town of Blind River | Municipal Buildings | Public Works Complex | $2,230,000 | $743,333 | $743,333 |
| Town of Bradford West Gwillimbury | Local Road Infrastructure | 8th Line / Dissette Reconstruction | $11,951,500 | $1,972,000 | $1,972,000 |
| Town of Bradford West Gwillimbury | Local Road Infrastructure | Colborne Street Reconstruction | $1,621,000 | $540,334 | $540,334 |
| Town of Carleton Place | Local Road Infrastructure | Road Rehabilitation | $2,150,000 | $716,667 | $716,667 |
| Town of Cobalt | Parks and Trails | Teck-Cominco Prospect Park Upgrades | $75,000 | $25,000 | $25,000 |
| Town of Cobalt | Municipal Buildings | Energy Retrofit Municipal Buildings | $100,000 | $31,666 | $31,666 |
| Town of Cobourg | Municipal Buildings | Cobourg Multi-Use Community Centre (CCC) | $27,400,000 | $9,133,333 | $9,133,333 |
| Town of Cobourg | Local Road Infrastructure | D''''''''''''''''''''''''''''''''Arcy Street Reconstruction | $3,150,000 | $1,050,000 | $1,050,000 |
| Town of Cochrane | Local Road Infrastructure | Genier Road Resurfacing | $3,562,800 | $1,187,600 | $1,187,600 |
| Town of Cochrane | Brownfield Redevelopment Infrastructure | Ferguson Subdivision | $450,000 | $150,000 | $150,000 |
| Town of Collingwood | Local Road Infrastructure | Downtown Collingwood Infrastructure Rehabilitation and Economic Revitalization | $7,000,000 | $2,000,000 | $2,000,000 |
| Town of East Gwillimbury | Municipal Buildings | Administration Building Renovation | $700,000 | $233,333 | $233,333 |
| Town of East Gwillimbury | Local Road Infrastructure | Boag Road Bridge | $750,000 | $250,000 | $250,000 |
| Town of Erin | Local Road Infrastructure | Hillsburgh Street Rehabilitation | $860,000 | $286,667 | $286,667 |
| Town of Erin | Wastewater Infrastructure | Deer Pit Storm Water Facility | $1,210,000 | $403,334 | $403,333 |
| Town of Erin | Local Road Infrastructure | Reconstruction of Sideroad 5 | $950,000 | $316,667 | $316,667 |
| Town of Essex | Municipal Buildings | McGregor Library and Community Centre | $1,800,000 | $600,000 | $600,000 |
| Town of Fort Erie | Water Infrastructure | Ridge Road Infrastructure Improvements | $5,884,000 | $1,961,333 | $1,961,333 |
| Town of Fort Frances | Water Infrastructure | Biomass Road Reconstruction & Infrastructure Renewal ( Water & Sanitary Sewer) Project | $1,714,095 | $571,365 | $571,365 |
| Town of Gore Bay | Municipal Buildings | Renovations at Arena | $320,000 | $106,666 | $106,666 |
| Town of Gore Bay | Municipal Buildings | Construction of new Firehall | $340,000 | $113,333 | $113,333 |
| Town of Greater Napanee | Local Road Infrastructure | Rehabilitation of Thomas Street | $1,391,375 | $463,791 | $463,791 |
| Town of Greater Napanee | Local Road Infrastructure | Rehabilitation of Camden Road | $538,824 | $179,608 | $179,608 |
| Town of Greater Napanee | Local Road Infrastructure | Rehabilitation of Roblin Road | $983,681 | $327,894 | $327,894 |
| Town of Grimsby | Water Infrastructure | Watermain Replacement Project | $1,325,000 | $441,660 | $441,660 |
| Town of Grimsby | Local Road Infrastructure | Book Road Reconstruction | $240,000 | $80,000 | $80,000 |
| Town of Grimsby | Municipal Buildings | Grimaby Town Redevelopment/Renovation | $6,563,000 | $2,187,660 | $2,187,670 |
| Town of Halton Hills | Cultural Infrastructure | Acton Branch Library Replacement | $3,500,000 | $1,166,667 | $1,166,667 |
| Town of Hanover | Water Infrastructure | Rehabilitation and Expansion of Water Treatment Plant | $3,600,000 | $1,200,000 | $1,200,000 |
| Town of Hawkesbury | Municipal Buildings | Dehumidifer Sports Complex | $160,000 | $53,333 | $53,333 |
| Town of Hearst | Wastewater Infrastructure | Wastewater Lagoon and System Updgrade | $969,000 | $323,000 | $323,000 |
| Town of Huntsville | Municipal Buildings | Port Sydney Fire Hall | $1,200,000 | $400,000 | $400,000 |
| Town of Ingersoll | Local Road Infrastructure | Wonham Street North Reconstruction | $1,727,410 | $575,803 | $575,803 |
| Town of Ingersoll | Local Road Infrastructure | King Street West Reconstruction | $4,268,491 | $1,422,830 | $1,422,830 |
| Town of Ingersoll | Local Road Infrastructure | Clark Road East Reconstruction | $4,545,371 | $1,515,124 | $1,515,124 |
| Town of Innisfil | Parks and Trails | Innisfil beach Park Improvements | $1,000,000 | $333,300 | $333,300 |
| Town of Kapuskasing | Local Road Infrastructure | Brock Crescent Rehabilitation | $990,000 | $330,000 | $330,000 |
| Town of Kapuskasing | Local Road Infrastructure | Cedar Street Rehabilitation | $3,460,000 | $1,153,333 | $1,153,333 |
| Town of Kapuskasing | Local Road Infrastructure | Maple Drive Rehabilitation | $1,200,000 | $400,000 | $400,000 |
| Town of Kingsville | Local Road Infrastructure | Project 1of 3 - Cull Drive Infrastructure Renewal | $2,206,423 | $669,500 | $669,500 |
| Town of Latchford | Local Road Infrastructure | Cosens Avenue - Murphy Mill Extension | $75,000 | $25,000 | $25,000 |
| Town of Laurentian Hills | Water Infrastructure | Corrective Measures to the Chalk River Water Treatment Plant | $390,000 | $130,000 | $130,000 |
| Town of Marathon | Water Infrastructure | Provide Potable Water to the Visitors Information Centre | $54,000 | $18,000 | $18,000 |
| Town of Midland | Municipal Buildings | Municipal Office Expansion/Retrofit | $4,000,000 | $1,333,333 | $1,333,333 |
| Town of Milton | Municipal Buildings | Milton Sports Centre Expansion Phase 1 | $20,237,653 | $6,678,425 | $6,678,425 |
| Town of Minto | Municipal Buildings | Harriston Community Centre Upgrades | $187,000 | $62,333 | $62,333 |
| Town of Mississippi Mills | Local Road Infrastructure | Reconstruct 4km of 8th Concession Ramsay | $480,000 | $160,000 | $160,000 |
| Town of Mississippi Mills | Local Road Infrastructure | Spring Street Reconstruction Including Water / Sewer Main Replacement | $441,000 | $147,000 | $147,000 |
| Town of Mono | Local Road Infrastructure | Blind Line Reconstruction (County Rd. 10 to County Road 16) | $1,523,000 | $507,667 | $507,667 |
| Town of Newmarket | Local Road Infrastructure | Parkview Crescent Road Reconstruction | $957,000 | $319,000 | $319,000 |
| Town of Niagara-on-the-Lake | Parks and Trails | Multi Purpose Trail | $150,000 | $50,000 | $50,000 |
| Town of Northeastern Manitoulin and The Islands | Local Road Infrastructure | Indian Mountain Road Upgrade | $223,750 | $74,583 | $74,583 |
| Town of Northeastern Manitoulin and The Islands | Water Infrastructure | Upgrade Membrane Cassettes at Little Current Water Plant | $499,809 | $166,603 | $166,603 |
| Town of Orangeville | Water Infrastructure | William Street - Water Main and Sanitary Sewer Replacement | $1,800,000 | $600,000 | $600,000 |
| Town of Parry Sound | Water Infrastructure | Reconstruction of Cascade Street | $2,800,000 | $933,333 | $933,333 |
| Town of Pelham | Municipal Buildings | Fire Station #2 Replacement (Fenwick) | $2,970,000 | $990,000 | $990,000 |
| Town of Penetanguishene | Water Infrastructure | Elevated Water Tower Resurfacing | $375,000 | $125,000 | $125,000 |
| Town of Petawawa | Local Road Infrastructure | Russell Street Rehabilitation | $1,548,189 | $516,063 | $516,063 |
| Town of Petrolia | Local Road Infrastructure | West Street Reconstruction | $824,000 | $274,667 | $274,667 |
| Town of Petrolia | Local Road Infrastructure | Queen/Nelson Street Reconstruction | $2,140,000 | $713,333 | $713,333 |
| Town of Rainy River | Municipal Buildings | Refurbish Public Works Garage/Fire Hall | $420,000 | $140,000 | $140,000 |
| Town of Rainy River | Municipal Buildings | Municipal Office Renewal | $45,000 | $15,000 | $15,000 |
| Town of Renfrew | Water Infrastructure | June Street Rehabilitation | $380,000 | $126,666 | $126,667 |
| Town of Renfrew | Local Road Infrastructure | Road Re-surfacing Project | $480,000 | $160,000 | $160,000 |
| Town of Saugeen Shores | Wastewater Infrastructure | Sanitary Sewer Expansion N/S Saugeen River | $17,680,000 | $5,893,333 | $5,893,333 |
| Town of Saugeen Shores | Wastewater Infrastructure | 10th Concession Drainage and Storm Sewer Installation | $1,210,000 | $403,333 | $403,333 |
| Town of Shelburne | Municipal Buildings | CDRC Community Centre Upgrades | $3,000,000 | $1,000,000 | $1,000,000 |
| Town of South Bruce Peninsula | Parks and Trails | Bluewater Park Rehabilitation | $1,420,646 | $473,549 | $473,549 |
| Town of Spanish | Local Road Infrastructure | DECLERK ROAD | $384,203 | $128,068 | $128,068 |
| Town of Spanish | Local Road Infrastructure | Shedden Backline | $517,740 | $172,580 | $172,580 |
| Town of Tecumseh | Local Road Infrastructure | St. Alphonse Avenue Reconstruction | $3,765,000 | $1,255,000 | $1,255,000 |
| Town of The Blue Mountains | Parks and Trails | Beaver River Trail | $500,000 | $166,500 | $166,500 |
| Town of The Blue Mountains | Municipal Buildings | New Town Hall | $6,900,000 | $2,300,000 | $2,300,000 |
| Town of Wasaga Beach | Parks and Trails | McIntyre Creek Trail Rehabilitation | $540,000 | $180,000 | $180,000 |
| Town of Wasaga Beach | Local Road Infrastructure | 45th Street Reconstruction | $1,562,724 | $520,908 | $520,908 |
| Town of Whitchurch - Stouffville | Local Road Infrastructure | McCowan Road Reconstruction | $1,950,000 | $650,000 | $650,000 |
| Township of Addington Highlands | Local Road Infrastructure | Reconstruction of Matawatchan Road | $1,539,495 | $513,165 | $513,165 |
| Township of Addington Highlands | Municipal Buildings | Denbigh Roads Garage Addition | $131,056 | $43,685 | $43,685 |
| Township of Adelaide Metcalfe | Municipal Buildings | Kerwood Fire Hall | $600,000 | $200,000 | $200,000 |
| Township of Adelaide Metcalfe | Local Road Infrastructure | Cuddy Drive Reconstruction | $795,000 | $265,000 | $265,000 |
| Township of Adjala - Tosorontio | Water Infrastructure | Repair Everett Reservoir | $92,500 | $30,525 | $30,525 |
| Township of Adjala - Tosorontio | Local Road Infrastructure | Pave Sideroad 30 Adjala | $138,400 | $45,672 | $45,672 |
| Township of Adjala - Tosorontio | Local Road Infrastructure | Resurface Concession Road 7 | $239,700 | $79,101 | $79,101 |
| Township of Admaston/Bromley | Municipal Buildings | Admaston/Bromley Expansion | $312,000 | $104,000 | $104,000 |
| Township of Alberton | Municipal Buildings | Alberton Fire Hall | $187,755 | $62,585 | $62,585 |
| Township of Alfred and Plantagenet | Wastewater Infrastructure | Wendover Water Pollution Control Plant Upgrade | $6,571,675 | $2,190,558 | $2,190,558 |
| Township of Alfred and Plantagenet | Local Road Infrastructure | Bolt Road Rehabilitation | $1,142,970 | $380,990 | $380,990 |
| Township of Alfred and Plantagenet | Local Road Infrastructure | Boundary Road Rehabilitation | $889,400 | $296,466 | $296,466 |
| Township of Algonquin Highlands | Wastewater Infrastructure | McClintock Sewage Lagoon Rehabilitation | $150,000 | $50,000 | $50,000 |
| Township of Algonquin Highlands | Disaster Mitigation Infrastructure | Disaster Mitigation Program Generators | $225,000 | $75,000 | $75,000 |
| Township of Alnwick/Haldimand | Municipal Buildings | Centreton Library | $548,700 | $182,900 | $182,900 |
| Township of Alnwick/Haldimand | Local Road Infrastructure | Shelter Valley Road Rehabilitation | $1,030,000 | $343,333 | $343,333 |
| Township of Amaranth | Municipal Buildings | Sand Storage Building | $260,133 | $86,711 | $86,711 |
| Township of Armour | Municipal Buildings | Armour Office Modification & Renewal | $80,000 | $26,664 | $26,664 |
| Township of Armour | Local Road Infrastructure | Armour Commercial Drive intersection Modification and Renewal | $630,000 | $210,000 | $210,000 |
| Township of Armour | Solid Waste Management Infrastructure | TRI R Site Improvements | $150,000 | $50,000 | $50,000 |
| Township of Ashfield - Colborne - Wawanosh | Municipal Buildings | Lucknow & District Firehall | $1,125,000 | $375,000 | $375,000 |
| Township of Asphodel - Norwood | Municipal Buildings | Public Works Facility | $1,730,000 | $576,667 | $576,667 |
| Township of Assiginack | Municipal Buildings | Manitowaning Arena Community Centre Facelift | $1,026,000 | $342,000 | $342,000 |
| Township of Athens | Municipal Buildings | Athens Town Hall Rehabilitation | $195,000 | $65,000 | $65,000 |
| Township of Atikokan | Municipal Buildings | Municipal Civic Centre | $318,311 | $106,104 | $106,104 |
| Township of Atikokan | Local Road Infrastructure | Dunbar Heights Sidewalk Rehabilitation | $138,462 | $46,154 | $46,154 |
| Township of Augusta | Solid Waste Management Infrastructure | Maynard Waste Disposal Site Rehabilitation | $600,000 | $200,000 | $200,000 |
| Township of Augusta | Municipal Buildings | Algonquin Maintenance Garage Revitalization | $450,000 | $150,000 | $150,000 |
| Township of Baldwin | Local Road Infrastructure | Hardwood Road Rehabilitation | $450,000 | $150,000 | $150,000 |
| Township of Baldwin | Solid Waste Management Infrastructure | Township of Baldwin Landfill Closure | $212,000 | $70,667 | $70,667 |
| Township of Beckwith | Local Road Infrastructure | Lake Park Road Reconstruction | $900,534 | $300,178 | $300,178 |
| Township of Beckwith | Parks and Trails | Beckwith Township and Town of Carleton Place Joint Trail Development Project | $1,442,001 | $480,667 | $480,667 |
| Township of Billings | Parks and Trails | Bridal Veil Falls and Kagawong River Valley Project | $21,530 | $7,177 | $7,177 |
| Township of Billings | Municipal Buildings | New Windows Old Mill | $87,451 | $29,150 | $29,150 |
| Township of Black River - Matheson | Water Infrastructure | Rehabilitation of Municipal Wells | $60,600 | $20,200 | $20,200 |
| Township of Bonfield | Local Road Infrastructure | Trunk Road Reconstruction | $950,500 | $316,517 | $316,517 |
| Township of Bonnechere Valley | Local Road Infrastructure | Lake Clear Road Stabilization | $630,300 | $210,100 | $210,100 |
| Township of Bonnechere Valley | Local Road Infrastructure | Alice Street Rehabilitation | $825,000 | $275,000 | $275,000 |
| Township of Brethour | Local Road Infrastructure | Jacques Bridge Project | $1,400,000 | $126,667 | $126,667 |
| Township of Brock | Local Road Infrastructure | Culvert 340 Replacement | $350,000 | $116,667 | $116,667 |
| Township of Brooke-Alvinston | Local Road Infrastructure | Churchill Line Rehabilitation | $225,000 | $75,000 | $75,000 |
| Township of Brooke-Alvinston | Municipal Buildings | Administration Community Centre Accessiblity | $258,500 | $86,167 | $86,167 |
| Township of Brudenell, Lyndoch and Raglan | Municipal Buildings | Upgrade to Raglan Recreation Centre | $712,647 | $237,549 | $237,549 |
| Township of Brudenell, Lyndoch and Raglan | Local Road Infrastructure | Upgrade to Letterkenny Road | $360,000 | $120,000 | $120,000 |
| Township of Burpee and Mills | Municipal Buildings | Municipal Complex Improvements | $26,400 | $8,791 | $8,791 |
| Township of Carlow/Mayo | Municipal Buildings | Renovations to Community/Evacuation Centre | $300,000 | $100,000 | $100,000 |
| Township of Casey | Municipal Buildings | Sand/Salt Storage Facility | $190,080 | $63,360 | $63,360 |
| Township of Central Frontenac | Municipal Buildings | Office Extension | $200,000 | $66,666 | $66,666 |
| Township of Central Frontenac | Local Road Infrastructure | Road Upgrade and Construction Project | $2,367,396 | $789,132 | $789,132 |
| Township of Central Frontenac | Local Road Infrastructure | Salt Storage Expansion Project | $350,000 | $116,667 | $116,667 |
| Township of Centre Wellington | Local Road Infrastructure | Reconstruction of Church Street (Elora) | $1,330,000 | $443,333 | $443,333 |
| Township of Chamberlain | Municipal Buildings | Public Works Garage | $300,000 | $100,000 | $100,000 |
| Township of Champlain | Local Road Infrastructure | Pleasant Corner Road Reconstruction | $175,000 | $58,333 | $58,333 |
| Township of Champlain | Municipal Buildings | Vankleek Hill Arena Elevator Replacement | $200,000 | $66,667 | $66,667 |
| Township of Chapleau | Local Road Infrastructure | Lisgar St. Bridge Improvements | $135,000 | $45,000 | $45,000 |
| Township of Chatsworth | Local Road Infrastructure | Concession 6 | $420,000 | $140,000 | $140,000 |
| Township of Chatsworth | Municipal Buildings | Williamsford Community Centre Rehabilitation | $750,000 | $250,000 | $250,000 |
| Township of Chatsworth | Local Road Infrastructure | Chatsworth Road 24 | $499,998 | $166,666 | $166,666 |
| Township of Chisholm | Municipal Buildings | Municipal Fire Hall Upgrade | $90,000 | $30,000 | $30,000 |
| Township of Chisholm | Solid Waste Management Infrastructure | Landfill Site Groundwater Monitoring Wells | $54,100 | $18,033 | $18,033 |
| Township of Clearview | Parks and Trails | Stayner to Collingwood Trail Link | $200,000 | $66,667 | $66,667 |
| Township of Conmee | Municipal Buildings | Handicapped Access | $150,000 | $50,000 | $50,000 |
| Township of Cramahe | Local Road Infrastructure | Durham St Reconstruction | $350,000 | $116,666 | $116,666 |
| Township of Dawn - Euphemia | Water Infrastructure | Lambton Line-Dawn Valley Watermain | $822,000 | $274,000 | $274,000 |
| Township of Dawson | Municipal Buildings | Pinewood Fire Hall Addition | $143,000 | $47,667 | $47,667 |
| Township of Dawson | Local Road Infrastructure | Atwood Road #2 Upgrade | $88,000 | $29,333 | $29,333 |
| Township of Douro - Dummer | Municipal Buildings | Warsaw Community Centre | $150,000 | $50,000 | $50,000 |
| Township of Douro - Dummer | Municipal Buildings | Municipal Building Addition | $1,100,000 | $366,666 | $366,668 |
| Township of Drummond - North Elmsley | Local Road Infrastructure | Drummond Conc 1A | $1,092,819 | $364,273 | $364,273 |
| Township of Drummond - North Elmsley | Local Road Infrastructure | Prestonvale Road Rehabilitation | $1,418,292 | $472,764 | $472,764 |
| Township of Drummond - North Elmsley | Local Road Infrastructure | Churchill Road Rehabilitation | $1,190,358 | $396,786 | $396,786 |
| Township of Dubreuilville | Local Road Infrastructure | Re-Alignment of the Intersection of Rue De L''''Eglise and Rue Des Pins | $255,000 | $85,000 | $85,000 |
| Township of Dysart et al | Municipal Buildings | West Guilford Community Centre Rehabilitation | $120,000 | $40,000 | $40,000 |
| Township of Dysart et al | Local Road Infrastructure | Haliburton Lake Road Rehabilitation | $373,477 | $124,492 | $124,492 |
| Township of Ear Falls | Municipal Buildings | Ear Falls Multiplex | $8,116,200 | $2,710,810 | $2,702,695 |
| Township of East Garafraxa | Local Road Infrastructure | 10th Line Improvement Project | $673,758 | $224,586 | $224,586 |
| Township of East Hawkesbury | Cultural Infrastructure | New Community/Emergency Centre | $989,940 | $329,980 | $329,980 |
| Township of East Hawkesbury | Local Road Infrastructure | Concession 1 Road Reconstruction | $647,400 | $215,800 | $215,800 |
| Township of East Zorra -Tavistock | Local Road Infrastructure | 10th line road improvements | $666,000 | $221,778 | $222,111 |
| Township of East Zorra -Tavistock | Local Road Infrastructure | 16th line resurfacing | $2,096,000 | $697,968 | $699,016 |
| Township of East Zorra -Tavistock | Local Road Infrastructure | Rudy Subdivision reconstruction | $638,000 | $212,454 | $212,773 |
| Township of Elizabethtown - Kitley | Local Road Infrastructure | Kitley Line 2 Reconstruction | $200,000 | $66,666 | $66,666 |
| Township of Emo | Local Road Infrastructure | Fisher Road Rebuild Project | $125,000 | $41,667 | $41,667 |
| Township of Enniskillen | Local Road Infrastructure | Shiloh Line Rehabilitation | $503,610 | $167,870 | $167,870 |
| Township of Enniskillen | Local Road Infrastructure | Marthaville Road Rehabilitation | $519,147 | $173,049 | $173,049 |
| Township of Essa | Local Road Infrastructure | Rehabilitation and repaving of various urban streets in Angus area | $343,000 | $114,322 | $114,322 |
| Township of Faraday | Solid Waste Management Infrastructure | Faraday Landfill Capacity Reclamation including Leachate Collection System Extension | $371,512 | $123,837 | $123,838 |
| Township of Fauquier - Strickland | Parks and Trails | Groundhog River Park | $127,127 | $42,376 | $42,376 |
| Township of Front of Yonge | Local Road Infrastructure | Reconstruction & Drainage Improvements - Ballycanoe & Escott-Yonge Townline Road | $403,398 | $134,466 | $134,466 |
| Township of Front of Yonge | Local Road Infrastructure | Road Resurfacing Program | $541,392 | $180,464 | $180,464 |
| Township of Frontenac Islands | Local Road Infrastructure | Wolfe Island Wind Plant Haul Roads Rehabilitation (Stage 2) | $476,000 | $158,666 | $158,666 |
| Township of Frontenac Islands | Local Road Infrastructure | Lower Side Road & Howe Island Drive Road Rehabilitation Project | $1,027,000 | $342,333 | $342,333 |
| Township of Galway - Cavendish - Harvey | Local Road Infrastructure | South Salmon Lake Road | $200,000 | $66,667 | $66,667 |
| Township of Galway - Cavendish - Harvey | Municipal Buildings | Buckhorn Welcome and Tourist Information Centre | $400,000 | $133,333 | $133,333 |
| Township of Galway - Cavendish - Harvey | Local Road Infrastructure | Kennedy Drive Rehabilitation | $400,000 | $133,333 | $133,333 |
| Township of Georgian Bluffs | Local Road Infrastructure | Big Bay Culvert Replacement | $165,000 | $55,000 | $55,000 |
| Township of Georgian Bluffs | Local Road Infrastructure | Park Head Culvert Replacement | $291,000 | $97,000 | $97,000 |
| Township of Georgian Bluffs | Local Road Infrastructure | 24th Street West Drainage Improvements | $490,000 | $163,170 | $163,415 |
| Township of Gillies | Parks and Trails | PeeDee Park Enhancement | $9,000 | $3,000 | $3,000 |
| Township of Gillies | Airport Infrastructure | Emergency Helipad Upgrade | $30,000 | $10,000 | $10,000 |
| Township of Greater Madawaska | Local Road Infrastructure | Mill Street | $230,500 | $76,833 | $76,833 |
| Township of Greater Madawaska | Local Road Infrastructure | Pucker Street | $800,000 | $266,667 | $266,667 |
| Township of Harley | Local Road Infrastructure | Belle Vallee Rd Gravel Resurfacing | $258,000 | $86,000 | $86,000 |
| Township of Harley | Local Road Infrastructure | Development Rd East Rehabilitation | $420,000 | $140,000 | $140,000 |
| Township of Harris | Local Road Infrastructure | Vahey Road | $7,000 | $2,333 | $2,333 |
| Township of Harris | Local Road Infrastructure | Sale Barn Road | $13,000 | $4,333 | $4,333 |
| Township of Head, Clara and Maria | Municipal Buildings | Garage Energy Savings Retrofit | $38,500 | $12,833 | $12,833 |
| Township of Head, Clara and Maria | Municipal Buildings | Admin Building Lighting Upgrades | $17,500 | $5,833 | $5,833 |
| Township of Head, Clara and Maria | Municipal Buildings | Admin Building Insulation Upgrades | $12,500 | $4,167 | $4,167 |
| Township of Hilton | Local Road Infrastructure | Hamilton Drive Rehabilitation | $245,797 | $81,932 | $81,932 |
| Township of Howick | Local Road Infrastructure | Gough Road Reconstruction | $312,000 | $104,000 | $104,000 |
| Township of Howick | Municipal Buildings | Municipal Public Works Garage Addition | $207,000 | $69,000 | $69,000 |
| Township of Howick | Local Road Infrastructure | Spencetown Road Reconstruction | $324,000 | $108,000 | $108,000 |
| Township of Hudson | Municipal Buildings | Community Hall Renewal | $185,760 | $61,920 | $61,920 |
| Township of Hudson | Local Road Infrastructure | Sawmill Rd Rehabilitation | $435,000 | $145,000 | $145,000 |
| Township of Hudson | Local Road Infrastructure | Road B - Rehabilitation | $180,000 | $60,000 | $60,000 |
| Township of Huron - Kinloss | Local Road Infrastructure | Concession 4 Resurfacing | $1,000,000 | $333,333 | $333,333 |
| Township of Ignace | Local Road Infrastructure | West Street Rehabilitation | $1,472,865 | $490,955 | $490,955 |
| Township of Ignace | Local Road Infrastructure | Lakeshore Drive Rehabilitation | $1,540,000 | $513,333 | $513,333 |
| Township of Jocelyn | Parks and Trails | All Season Trails | $303,000 | $101,000 | $101,000 |
| Township of Johnson | Local Road Infrastructure | Government Road Improvements | $174,000 | $58,000 | $58,000 |
| Township of Johnson | Municipal Buildings | Recreation Centre Safety/Energy Upgrades | $205,000 | $68,333 | $68,333 |
| Township of Joly | Local Road Infrastructure | TOWNSHIP OF JOLY - AIRPORT ROAD WIDENING | $375,000 | $125,000 | $125,000 |
| Township of Kerns | Municipal Buildings | Sand/Salt Shed | $268,488 | $89,496 | $89,496 |
| Township of Killaloe, Hagarty and Richards | Local Road Infrastructure | Cameron Street Rehabilitation | $43,000 | $14,333 | $14,333 |
| Township of Killaloe, Hagarty and Richards | Local Road Infrastructure | Stone Church Road & Cardinal Road Rehabilitaion | $63,000 | $21,000 | $21,000 |
| Township of King | Municipal Buildings | Schomberg Arena/Curling/Fitness Facility Construction Project | $14,560,000 | $4,720,000 | $4,720,000 |
| Township of La Vallee | Municipal Buildings | Emo-LaVallee Community Centre Retrofit | $36,408 | $12,136 | $12,136 |
| Township of La Vallee | Local Road Infrastructure | Pyne Road Rehabilitation | $57,000 | $19,000 | $19,000 |
| Township of Laird | Municipal Buildings | Laird Hall Rehabilitation | $30,000 | $10,000 | $10,000 |
| Township of Lake of Bays | Local Road Infrastructure | Winter Sand Storage Building | $710,000 | $236,666 | $236,666 |
| Township of Lake of the Woods | Local Road Infrastructure | Frenchman''''''''''''''''s Rock Road Upgrade | $163,000 | $54,333 | $54,333 |
| Township of Lake of the Woods | Local Road Infrastructure | Moosebay Road Upgrade | $123,000 | $41,000 | $41,000 |
| Township of Lake of the Woods | Local Road Infrastructure | Lakewood Drive Upgrade | $114,000 | $38,000 | $38,000 |
| Township of Lanark Highlands | Local Road Infrastructure | Galbraith Road Improvements | $1,505,670 | $501,890 | $501,890 |
| Township of Lanark Highlands | Local Road Infrastructure | Highland Line Construction Improvements | $1,452,696 | $484,232 | $484,232 |
| Township of Larder Lake | Municipal Buildings | Larder Lake Municipal Complex | $1,407,000 | $268,469 | $268,469 |
| Township of Laurentian Valley | Water Infrastructure | Bruham Avenue Watermain Rehabilitation | $300,000 | $100,000 | $100,000 |
| Township of Leeds and the Thousand Islands | Municipal Buildings | Leeds and the Thousand Islands Lyndhurst Fire Hall and Combined Training Facility | $2,000,000 | $666,666 | $666,666 |
| Township of Leeds and the Thousand Islands | Local Road Infrastructure | Maple Grove Road | $840,000 | $280,000 | $280,000 |
| Township of Limerick | Local Road Infrastructure | Pleasure Bay Road Rehabilitation | $537,192 | $179,064 | $179,064 |
| Township of Lucan Biddulph | Water Infrastructure | George Street Watermain Replacement | $852,264 | $284,088 | $284,088 |
| Township of Lucan Biddulph | Local Road Infrastructure | Saintsbury Line Reconstruction | $958,248 | $319,416 | $319,416 |
| Township of Lucan Biddulph | Municipal Buildings | Facility Rehabilitation (Lucan Community Memorial Centre) | $470,000 | $156,667 | $156,667 |
| Township of Macdonald, Meredith and Aberdeen Add l | Municipal Buildings | Milligan Gazebo | $58,553 | $19,498 | $19,498 |
| Township of Macdonald, Meredith and Aberdeen Add l | Municipal Buildings | Municipal Office Addition | $99,263 | $33,054 | $33,054 |
| Township of Macdonald, Meredith and Aberdeen Add l | Municipal Buildings | Sportsplex Upgrades | $125,000 | $41,625 | $41,625 |
| Township of Machar | Local Road Infrastructure | Eagle Lake Narrows Bridge | $543,375 | $181,125 | $181,125 |
| Township of Madoc | Municipal Buildings | Accessibility Upgrade | $21,000 | $7,000 | $7,000 |
| Township of Malahide | Municipal Buildings | Firehall/Multi Use Building | $1,700,000 | $566,666 | $566,666 |
| Township of Matachewan | Municipal Buildings | Municipal Building Improvements | $108,912 | $36,304 | $36,304 |
| Township of Mattice - Val Cote | Parks and Trails | Community Parks 2009 | $50,000 | $16,666 | $16,666 |
| Township of Mattice - Val Cote | Municipal Buildings | Infrastructure 2009 | $132,000 | $44,000 | $44,000 |
| Township of McKellar | Local Road Infrastructure | Middle River Bridge Replacement | $2,300,000 | $766,667 | $766,667 |
| Township of McMurrich/Monteith | Local Road Infrastructure | Stisted Road Reconstruction Project | $190,000 | $63,333 | $63,333 |
| Township of McMurrich/Monteith | Local Road Infrastructure | Stisted Road Slurry Seal Project | $160,000 | $53,333 | $53,333 |
| Township of Minden Hills | Parks and Trails | Riverview Walk | $1,565,460 | $521,820 | $521,820 |
| Township of Moonbeam | Cultural Infrastructure | Accessibilité à la Bibliothèque | $390,000 | $130,000 | $130,000 |
| Township of Moonbeam | Municipal Buildings | ISF-Fire Hall Expansion | $437,500 | $145,833 | $145,833 |
| Township of Morley | Municipal Buildings | Community Centre Complex Rehabilitation | $81,000 | $27,000 | $27,000 |
| Township of Muskoka Lakes | Municipal Buildings | Bala Fire Station Renovation/Expansion | $350,000 | $116,667 | $116,667 |
| Township of Nipissing | Municipal Buildings | Nipissing Fire Station #1 Addition | $210,000 | $70,000 | $70,000 |
| Township of Nipissing | Municipal Buildings | Nipissing Public Works Garage Energy Retrofitting | $80,000 | $26,667 | $26,667 |
| Township of North Algona Wilberforce | Municipal Buildings | Golden Lake Municipal Building Rehabilitation | $54,000 | $18,000 | $18,000 |
| Township of North Algona Wilberforce | Local Road Infrastructure | B-Line Road Resurfacing Project | $345,000 | $115,000 | $115,000 |
| Township of North Algona Wilberforce | Local Road Infrastructure | Smiths Bay Road Resurfacing | $180,000 | $60,000 | $60,000 |
| Township of North Dundas | Water Infrastructure | Winchester Water Transmission Main Project | $835,000 | $278,333 | $278,333 |
| Township of North Dundas | Local Road Infrastructure | Reconstruction of Belmeade Road | $2,499,400 | $833,133 | $833,133 |
| Township of North Frontenac | Local Road Infrastructure | Rehabilitation of Ardoch Road | $750,000 | $250,000 | $250,000 |
| Township of North Glengarry | Water Infrastructure | Alexandria Water System Upgrade | $3,420,000 | $1,140,000 | $1,140,000 |
| Township of North Glengarry | Water Infrastructure | Park Street Sanitary Sewer Replacement | $750,000 | $250,000 | $250,000 |
| Township of North Grenville | Cultural Infrastructure | North Grenville Public Library | $4,001,610 | $1,333,870 | $1,333,870 |
| Township of North Grenville | Local Road Infrastructure | Boundary Road Gravel Rebuild | $1,800,000 | $600,000 | $600,000 |
| Township of North Huron | Municipal Buildings | Blyth Campground Event Venue with Washrooms, Showers & Laundry | $137,025 | $45,675 | $45,675 |
| Township of North Kawartha | Municipal Buildings | North Kawartha Library and Community Poice Building | $880,000 | $293,333 | $293,333 |
| Township of North Kawartha | Municipal Buildings | Public Works Garage | $950,000 | $316,667 | $316,667 |
| Township of North Kawartha | Municipal Buildings | Fire Station 1 Addition | $400,000 | $133,333 | $133,333 |
| Township of North Stormont | Local Road Infrastructure | Finch-Roxborough Boundary Road Reconstruction | $1,131,700 | $377,233 | $377,233 |
| Township of Norwich | Municipal Buildings | Fire/EOC Station #1 | $1,100,000 | $366,666 | $366,667 |
| Township of O Connor | Local Road Infrastructure | Bridge #1 Rehabilitation | $48,600 | $16,200 | $16,200 |
| Township of O Connor | Municipal Buildings | O''Connor Municipal Building & Council Chambers | $323,400 | $107,800 | $107,800 |
| Township of Perry | Municipal Buildings | Public Works Shop and Office Roof | $42,000 | $14,000 | $14,000 |
| Township of Perth East | Municipal Buildings | Library Building Project | $1,200,000 | $400,000 | $400,000 |
| Township of Perth South | Local Road Infrastructure | Rehabilition of Line 29 | $646,800 | $215,600 | $215,600 |
| Township of Perth South | Local Road Infrastructure | Rehabilitation of Line 6 | $630,000 | $210,000 | $210,000 |
| Township of Perth South | Local Road Infrastructure | Rehabilitation of Line 26 | $948,150 | $316,050 | $316,050 |
| Township of Plummer Additional | Municipal Buildings | Bruce Station Hall Rehabilitation | $34,500 | $11,500 | $11,500 |
| Township of Plummer Additional | Local Road Infrastructure | Copper Bay Road Hard Surfacing | $87,000 | $29,000 | $29,000 |
| Township of Puslinch | Municipal Buildings | Township Storage Building | $495,999 | $165,333 | $165,333 |
| Township of Ramara | Water Infrastructure | Water Meters | $840,000 | $280,000 | $280,000 |
| Township of Red Rock | Municipal Buildings | Lighting Retrofit | $35,000 | $11,667 | $11,667 |
| Township of Red Rock | Municipal Buildings | Boiler Replacement | $80,000 | $26,667 | $26,667 |
| Township of Rideau Lakes | Municipal Buildings | South Elmsley Hall Renovation/Addition | $289,500 | $96,500 | $96,500 |
| Township of Russell | Local Road Infrastructure | Rebuilt and Surface Treatment Rte 200 | $1,100,000 | $366,650 | $366,650 |
| Township of Sables - Spanish Rivers | Water Infrastructure | Hugh Cummings Street Water Main | $255,000 | $85,000 | $85,000 |
| Township of Sables - Spanish Rivers | Municipal Buildings | Public Works Building Rehab & Addition | $393,000 | $131,000 | $131,000 |
| Township of Sables - Spanish Rivers | Local Road Infrastructure | Replacement of Four Large Culverts | $750,000 | $250,000 | $250,000 |
| Township of Schreiber | Municipal Buildings | New Municipal Public Works Garage | $866,200 | $288,733 | $288,733 |
| Township of Scugog | Local Road Infrastructure | Old Simcoe Road Reconstruction Project | $4,060,000 | $1,353,333 | $1,353,333 |
| Township of Severn | Local Road Infrastructure | Fairgrounds Road Upgrade | $600,000 | $200,000 | $200,000 |
| Township of Sioux Narrows - Nestor Falls | Municipal Buildings | Municipal Multi-Use Facility | $495,000 | $165,000 | $165,000 |
| Township of Smith - Ennismore - Lakefield | Local Road Infrastructure | Charles Street Reconstruction | $501,975 | $167,325 | $167,325 |
| Township of South Algonquin | Municipal Buildings | Madawaska Multi-Purpose Building | $1,500,000 | $500,000 | $500,000 |
| Township of South Frontenac | Local Road Infrastructure | BATTERSEA ROAD | $975,000 | $325,000 | $325,000 |
| Township of South Frontenac | Local Road Infrastructure | Desert Lake Road | $900,000 | $300,000 | $300,000 |
| Township of South Stormont | Water Infrastructure | Wales Village Water Main Extension | $920,000 | $306,667 | $306,666 |
| Township of South Stormont | Municipal Buildings | South Stormont Town Hall | $2,714,217 | $904,739 | $904,739 |
| Township of Southgate | Municipal Buildings | Library & OPP Emergency Services Office | $1,020,000 | $340,000 | $340,000 |
| Township of South-West Oxford | Local Road Infrastructure | Dereham Line (South) | $113,428 | $37,809 | $37,809 |
| Township of South-West Oxford | Local Road Infrastructure | Foldens Line | $224,132 | $74,710 | $74,710 |
| Township of Springwater | Local Road Infrastructure | Culvert 203 - Rainbow Valley Rd. West | $180,000 | $60,000 | $60,000 |
| Township of Springwater | Local Road Infrastructure | Culvert 201 - Wilson Drive | $360,000 | $120,000 | $120,000 |
| Township of Springwater | Local Road Infrastructure | Queen Street East | $1,600,000 | $533,333 | $533,333 |
| Township of St. Joseph | Parks and Trails | Parks Rehabilitation Project | $150,000 | $50,000 | $50,000 |
| Township of Stirling - Rawdon | Municipal Buildings | Police/Fire Facility | $3,000,000 | $1,000,000 | $1,000,000 |
| Township of Stirling - Rawdon | Water Infrastructure | Water Treatment Plant - Standy Power System | $120,000 | $40,000 | $40,000 |
| Township of Stone Mills | Municipal Buildings | Municipal Garage | $2,500,650 | $833,550 | $833,550 |
| Township of Strathroy - Caradoc | Wastewater Infrastructure | Mount Brydges Sanitary Sewer Servicing | $8,438,382 | $2,812,794 | $2,812,794 |
| Township of Strong | Parks and Trails | Parks/Beaches Beautification Project | $100,000 | $33,333 | $33,333 |
| Township of Strong | Municipal Buildings | Municipal Office Expansion | $350,000 | $116,666 | $116,666 |
| Township of Tarbutt & Tarbutt Additional | Solid Waste Management Infrastructure | Johnson & Tarbutt Landfill Expansion | $235,950 | $78,650 | $78,650 |
| Township of Tay | Water Infrastructure | Hogg Valley Road Reconstruction | $2,503,717 | $834,572 | $834,572 |
| Township of Tay Valley | Local Road Infrastructure | Upgrade Menzies Munro Side Road | $320,000 | $106,600 | $106,700 |
| Township of Tay Valley | Local Road Infrastructure | Stanleyville Road Rehabilitation and Improvement | $275,000 | $91,600 | $91,700 |
| Township of Tay Valley | Municipal Buildings | South Sherbrooke Fire Hall | $1,200,000 | $400,000 | $400,000 |
| Township of Tehkummah | Municipal Buildings | Municipal Fire Hall | $330,000 | $110,000 | $110,000 |
| Township of The Archipelago | Solid Waste Management Infrastructure | Waste Management Efficiency Improvements | $683,000 | $227,666 | $227,666 |
| Township of The Archipelago | Local Road Infrastructure | Healey Lake Road Reconstruction | $5,000,000 | $1,666,667 | $1,666,667 |
| Township of The Archipelago | Local Road Infrastructure | Blackstone/Crane Lake Road Reconstruction | $3,000,000 | $1,000,000 | $1,000,000 |
| Township of The North Shore | Municipal Buildings | Renovations to Municipal Building & New Fire Station | $216,000 | $72,000 | $72,000 |
| Township of Tiny | Local Road Infrastructure | Blam Beach Road Improvements | $340,937 | $113,646 | $113,646 |
| Township of Tyendinaga | Municipal Buildings | Melrose Sand Dome Roof Rehabilitation | $86,250 | $28,750 | $28,750 |
| Township of Uxbridge | Local Road Infrastructure | Downtown Revitalization | $600,000 | $200,000 | $200,000 |
| Township of Val Rita - Harty | Municipal Buildings | Municipal Chalet | $90,435 | $30,145 | $30,145 |
| Township of Wainfleet | Local Road Infrastructure | Buliung Road Bridge | $300,000 | $100,000 | $100,000 |
| Township of Wellesley | Local Road Infrastructure | Hessen Strasse Resurfacing, Moser Young Rd. to Hutchinson Rd. | $1,264,500 | $421,500 | $421,500 |
| Township of Wellesley | Local Road Infrastructure | Weimar Line Resurfacing, Greenwood Hill Rd. to Hutchison Rd. | $369,000 | $123,000 | $123,000 |
| Township of Wellesley | Local Road Infrastructure | Siegner Bridge Handrail Upgrades | $285,000 | $95,000 | $95,000 |
| Township of Wellington North | Wastewater Infrastructure | Cork Street Sewage Pumping Station | $1,800,000 | $600,000 | $600,000 |
| Township of West Lincoln | Local Road Infrastructure | Port Davidson Road Realignment | $200,000 | $66,666 | $66,666 |
| Township of Whitewater Region | Water Infrastructure | Morris Street & Anderson Drive Watermain Extension | $372,210 | $124,070 | $124,070 |
| Township of Wilmot | Local Road Infrastructure | Shade Street Bridge Rehabilitation | $742,500 | $247,500 | $247,500 |
| Township of Wollaston | Local Road Infrastructure | Rehabilitation of Ridge Road | $276,000 | $92,000 | $92,000 |
| Township of Woolwich | Wastewater Infrastructure | Snyder Avenue Reconstruction | $2,600,000 | $866,667 | $866,667 |
| Township of Woolwich | Wastewater Infrastructure | Samuel Street and Area Reconstruction | $2,600,000 | $866,667 | $866,667 |
| Township of Woolwich | Local Road Infrastructure | Floradale Road Resurfacing and Floradale Bridge Rehabilitation | $1,200,000 | $400,000 | $400,000 |
| Township of Zorra | Local Road Infrastructure | Cobble Hills Road Rehabilitation | $690,000 | $230,000 | $230,000 |
| United Counties of Leeds and Grenville | Local Road Infrastructure | County Road 5 Resurfacing | $3,210,000 | $1,070,000 | $1,070,000 |
| United Counties of Prescott and Russell | Local Road Infrastructure | Brisson Bridge Rehabilitation | $1,584,000 | $528,000 | $528,000 |
| United Counties of Prescott and Russell | Parks and Trails | Riverflow Cycling Trail | $4,360,000 | $1,453,333 | $1,453,333 |
| United Counties of Prescott and Russell | Local Road Infrastructure | Casselman Storm Sewers | $770,000 | $128,333 | $128,333 |
| United Counties of Stormont, Dundas & Glengarry | Municipal Buildings | Glengarry Registry Office | $287,340 | $95,780 | $95,780 |
| United Counties of Stormont, Dundas & Glengarry | Municipal Buildings | Historic Jail Kitchen/Courtyard | $270,000 | $90,000 | $90,000 |
| Village of Hilton Beach | Municipal Buildings | Hilton Beach Community Centre Rehabilitation | $153,170 | $51,057 | $51,057 |
| Village of Merrickville - Wolford | Local Road Infrastructure | Collar Hill Road Construction | $275,001 | $91,667 | $91,667 |
| Village of Merrickville - Wolford | Water Infrastructure | Main Street Watermain Replacement | $957,999 | $319,333 | $319,333 |
| Village of Merrickville - Wolford | Local Road Infrastructure | Snowdons Corners Road Construction | $418,000 | $139,333 | $139,333 |
| Village of Newbury | Municipal Buildings | Newbury Municipal Office Expansion and Renovation | $294,000 | $98,000 | $98,000 |
| Village of Point Edward | Wastewater Infrastructure | Bayview Storm Station Upgrades | $802,200 | $267,400 | $267,400 |
| Village of Westport | Wastewater Infrastructure | Sewage Pumping Station Upgrades | $225,000 | $75,000 | $75,000 |
| Global Totals | $2,792,396,193 | $925,003,383 | $924,996,418 | ||