* $75 million has been committed to date to the province of Alberta for initiatives funded under Provincial/Territorial Base Funding.
| Location | Project | Federal Contribution |
|---|---|---|
| Alix | Concrete overlay on overpass on Highway 12 at Alix | $226,500 |
| Alliance | Hwy 602 - Hwy 36 to Alliance | $170,132 |
| Ardmore | Highway 892 - Rehabilitation to the concrete deck overlay and partial curb and pier repairs | $428,113 |
| Arrowwood | Sanitary Lagoon Expansion | $616,667 |
| Athabasca | Waste Water Lagoon Upgrading | $553,668 |
| Athabasca | ALPAC/Grassland Connectors | $3,000,000 |
| Banff | Kinnear Centre | $15,000,000 |
| Banff | Hwy 1:02. East of Banff Park Border- Kananaskis River (selective East Bound lanes and West Bound lanes) | $1,742,038 |
| Banff | Hwy 1- Banff Park Boundary to Hwy 742 | $1,502,809 |
| Barrhead | Correction Line Upgrading | $2,999,743 |
| Barrhead | New Sewage Pumping Station | $325,125 |
| Barrhead | 48 Avenue 49B Street to 53 Street to 50 Avenue | $629,305 |
| Barrhead | 46 Street Water and Wastewater System Upgrades | $781,062 |
| Bashaw | Infrastructure Upgrading | $594,266 |
| Bashaw | Hwy 21- South of Bashaw - Hwy 53 (West) | $2,546,278 |
| Bear River | 16.9 km of final asphalt pavement on Highway 88 - Bear River to S of Fort Vermilion | $2,500,000 |
| Bentley | Roads Program & Storm Water Management | $1,625,400 |
| Berwyn | Water Plant Upgrade | $107,000 |
| Big Lakes | Faust Water and Sewer Expansion | $1,176,233 |
| Big Lakes | Hwy 679:04 Rehab from 1 km East of PAR 108 to Hwy 749 | $1,639,412 |
| Big Valley | Hwy 590:04. Rehab from Big Valley to Hwy 56 | $276,783 |
| Bittern Lake | Hwy 13- West of Bittern Lake - East of Hwy 21 | $3,071,782 |
| Black Diamond | Water/ WasteWater Line Servicing & Meters | $247,690 |
| Blackfalds | Town of Blackfalds Lift Station Upgrades | $1,582,700 |
| Blue Creek | Hwy 697:02. Rehab from Blue Creek to Steephill Creek | $2,730,259 |
| Blue Ridge | Hwy 658-Blue Ridge- North of Athabasca River | $913,440 |
| Bonnyville | 2009 Local Road Improvement | $2,508,333 |
| Bonnyville | 45th Avenue Rehabilitation | $1,131,333 |
| Bonnyville | 53A Street Infrastructure Replacement Project | $418,333 |
| Bonnyville | Hwy 659- East of Hwy 28 - Hwy 892 | $1,516,341 |
| Bow Island | 4th Street East Loop | $117,466 |
| Bow Island | Highway 879 - Maintenance (includes Bearing Repairs. Deck Joints) on South Saskatchewan River Bridge On Highway 879. 8 km northwest Of Bow Island | $368,000 |
| Bowden | 23rd Street and Westview Crescent Sanitary. Water & Road Re-construction | $632,405 |
| Bowden | Hwy 2- South of Hwy 2A- South of Town of Bowden | $838,679 |
| Bowden | Red Lodge Water Treatment Plant System Upgrade | $340,080 |
| Bowden | Westview Crescent Loop Infrastructure Replacement | $602,290 |
| Bragg Creek | Sandy McNabb Campground Refurbishments | $3,040,080 |
| Brazeau | Suchild Road Base/Pave | $3,000,000 |
| Cadogan | Hwy 600-East of Hwy 41 - East of Cadogan | $1,075,176 |
| Cadogan | UAR 108 - Cadogan Access | $425,000 |
| Calgary | Telus World of Science Centre | $40,000,000 |
| Calgary | Centre of Sport Excellence (Calgary Olympic Development Association (CODA) - Phase 1) | $40,000,000 |
| Calgary | Calgary Stampede Park | $25,000,000 |
| Calgary | Completion of improvements to the grounds at the Calgary Heritage Park | * |
| Calgary | Public Transit in Calgary | $90,000,000 |
| Calgary | Expansion of the Art Gallery of Alberta (AGA) | * |
| Calgary | Sports Hall of Fame | $15,000,000 |
| Calgary | Highway 2 - improvements to 32nd Avenue near Deerfoot right-of-way | $403,000 |
| Calgary | Highway 2 - reconstruction and widening of 1.6 km from Beddington Trail to 64th Avenue | $3,722,639 |
| Calgary | Highway 2 - bridge twinning at 196th Avenue | $2,277,000 |
| Calgary | Calgary Southeast Ring Road | $100,000,000 |
| Calgary | Hwy 1A-Calgary ECL- Hwy 1 | $878,242 |
| Calgary | Hwy 2: N of McKnight Boulevard - South of City of Calgary NCL (South Bound lane) | $3,222,220 |
| Calgary | Highway 2 - Deerfoot Trail: Ivor Strong Bridge to South of 17 avenue (North and South Bound lanes) | $7,389,000 |
| Calgary | Improvements to Highway 9 | $5,000,000 |
| Calmar | 2009 Infrastructure Upgrading | $1,161,000 |
| Camrose | Hwy 21- North of Hwy 611 - Hwy 13 | $5,552,231 |
| Camrose | Hwy 616:10 - County Boundary to Hwy 21 (616:10 C1 21.640 - 35.490) | $2,291,500 |
| Camrose | Hwy 21:22 - Battle River Bridge near Ervick. ACP replacement and Deck Membrane repairs (BF875) | $158,000 |
| Canmore | Hwy 1A- Canmore (1A:02 C1 0.000-14.570) | $823,850 |
| Carbon | Hwy 836 - Hwy 9 to South of Carbon | $1,459,500 |
| Cardston | Cardston Outfall Project | $1,545,438 |
| Cardston | Highway 62 - Pavement rehabilitation will restore pavement serviceability by improving ride quality and providing new water-proof surface (North of US Border - South of Jensen Reservoir) | $2,172,273 |
| Cereal | HKRWSC Sheerness Pump House Emergency Generator & MCC | $230,000 |
| Chinchaga River | Highway 58 - 13.7 km of grade widening and repaving east of Chinchaga River to Sixth Meridian | $5,610,497 |
| Chipman | Road Program | $243,362 |
| Claresholm | South Sanitary Sewer | $1,022,000 |
| Clearwater | Sunchild Road Base/Pave – Phase II | $4,433,878 |
| Clearwater | Chungo Road – grading | $750,000 |
| Clearwater | Hwy 22:24 - South of Hwy 53 to Hwy 53. Climbing/Passing Lanes (22:24 C1 11.600-13.600. C1 25.900-28.000. C1 30.000-32.400) | $1,857,500 |
| Clearwater | Hwy 22:24 R1. C1. L1 - Hwy 11 to Hwy 53 (22:24 C1 0.054 - 33.442; 22:24 L1 0.019 - .054; 22:24 R1 0.019 - .054) | $9,899,500 |
| Cochrane | Hwy 22-N of Hwy 1 - South of Hwy 1A | $1,375,026 |
| Cochrane | Hwy 1A-E of Hwy 22 - East of Town of Cochrane | $795,704 |
| Corbett Creek | Hwy 658-North of Corbett Creek - Goose Lake | $1,450,151 |
| Crossfield | Smith Avenue – Water/wastewater upgrades | $631,320 |
| Crowsnest Pass | Project 1a. Water and Sewer Replacement West End of Blairmore | $641,381 |
| Crowsnest Pass | Project 11a. Water and Sewer Replacement 208 Street from 23 Avenue to old Highway #3 | $255,899 |
| Cypress | Walsh Water Distribution lines | $939,166 |
| Cypress | Hwy 879:6 C - South Saskatchewan River Bridge On Highway 879. 8 Km NW Of Bow Island (7256-1...Bearing Repairs. Deck Joints) (7256-1). | $368,000 |
| Cypress Hills | Cypress Hills Provincial Park Water Tower Replacement | $140,080 |
| Devon | 2009 & 2010 Road Improvements | $1,260,872 |
| Didsbury | North Industrial Area - Road Work & Storm Water Management | $2,032,666 |
| Donnelly | Paving East Village of Donnelly | $756,666 |
| Drumheller | Highway 9 - paving of 13.5 km from east of Hwy 836 to east of Hwy 840 | $1,505,711 |
| Drumheller | 18.8 km of pavement overlay on Highway 575 - East of Highway 836 to Town of Drumheller | $1,775,000 |
| Drumheller | Hwy 9:4 - S of Hwy 10 to Hwy 10 (NBL & SBL) (9:04 L1 42.170 - 43.146; 9:04 R1 42.170 - 43.144) | $160,500 |
| Duchess | Railway Avenue Relief Main | $123,510 |
| Eckville | North Outlet Stormwater Management Project | $109,961 |
| Edmonton | Northlands Agricom Exhibition Facility Expansion | $25,000,000 |
| Edmonton | Edmonton Southwest Ring Road Projects | $100,000,000 |
| Edmonton | Edmonton transit | $100,000,000 |
| Edmonton | Construction of the new GO Community Centre | $14,800,000 |
| Edmonton | Hwy 627:04. Rehab from Hwy 779 to City of Edmonton | $1,264,114 |
| Edmonton | Renovation of the Citadel Theatre | $2,700,000 |
| Edson | Expansion and Construction of Museum | $951,413 |
| Edson | Upgrading of Airport Road and Related Works | $850,524 |
| Elk Point | Concrete deck overlay on the North Saskatchewan River Bridge on Highway 41. 4 km South of Elk Point | $1,983,000 |
| Ervick | Highway 21 - Replacement of asphalt concrete pavement and deck membrance repairs on Battle River bridge near Ervick | $158,000 |
| Fairview | Lagoon Upgrade | $169,000 |
| Fairview | Highway 682 - Asphalt deck replacement on Hines Creek Bridge on Highway 682. 18 km west of Fairview | $283,500 |
| Flagstaff | Hwy 36: South of Hwy 53 - South of Hwy 26 | $4,677,203 |
| Fort McMurray | Improvements to Highway 63 | $53,000,000 |
| Forty Mile | Range Road 60 Stabilization | $633,333 |
| Fox Creek | Fox Creek Wastewater Lift Station | $1,083,278 |
| Fox Creek | 41.3 km of pavement overlay on Highway 43 - North of Town of Fox Creek to East of Highway 947 (West Bound Lane selective) | $2,267,000 |
| Gem | Hwy 862 - South of Gem to Hwy 556 | $275,500 |
| Gibbons | Gibbons Lift Station and Forcemain | $1,928,333 |
| Grande Prairie | Highway 43X - upgrades to 6.7 km of highway and service roads from 116 Street (R.R. #63) to Hwy 2 and Hwy 43 intersection north of Grande Prairie | $9,473,513 |
| Grande Prairie | Pipestone creek (Rge Rd 82) – grading | $750,000 |
| Grande Prairie | Twp Rd 714 - base/pave | $491,420 |
| Grande Prairie | Saskatoon Island Provincial Park Trail Enhancements | $240,080 |
| Greenview | Grovedale Connector Surfacing | $2,121,173 |
| Greenview | Hwy 43:10. 12 L1 - N of Town of Fox Creek to E of Hwy 947 (WBL selective) (43:10 L1 15.966 - 47.249; 43:12 L1 11.722 - 21.722) | $2,267,000 |
| Grimshaw | 2009 Street Paving | $492,804 |
| Grimshaw | 2009 Sewer Main Extensions | $148,333 |
| Gull Lake | Aspen Beach Provincial Park Shower Building Upgrades | $190,080 |
| Hardisty | Industrial Subdivision Wastewater | $765,181 |
| Hardisty | Hwy 13:16. Battle River Bridge on Highway 13. 2 km South of Hardisty | $263,740 |
| High Level | Alum Sludge Dewatering System | $379,333 |
| High Prairie | 55th Avenue Reconstruction (49 to 51 Street) | $842,666 |
| High Prairie | 56th Avenue Reconstruction (49 to 51 Street) | $833,333 |
| Highway 16 | Hwy 16:10. from Hwy 22 West - Hwy 22 East | $867,900 |
| Highway 16 | Hwy 16:10 L1 - Hwy 753 - West of Hwy 16A | $375,095 |
| Highway 16 | Hwy 16 - West of Hillview Rd (231 St) to East of Hwy 216 (East Bound Lane) | $392,500 |
| Highway 22 | Highway 22 - Constructing 6.5 km of climbing/passing lanes (3 locations) on Highway 22:24 | $1,857,500 |
| Highway 22 | Full Depth Reclamation and Overlay on Highway 22:24 - Highway 11 to Highway 53 | $9,899,500 |
| Highway 40 | Construction of 11.2 km of climbing lanes (four locations) on Highway 40:30 | $3,250,000 |
| Highway 581 | Highway 581 -Highway improvements east of Highway 2 - Highway 791 | $1,489,940 |
| Highway 616 | Highway 616 - Highway improvements from County Boundary to Highway 21. | $2,291,500 |
| Highway 62 | Hwy 62:2 - US Border - North of US Border | $2,996,718 |
| Highway 661 | Highway 661 - 10 km of pavement overlay on Highway 661 - West of Highway 63 to Highway 831 | $722,500 |
| Highway 836 | Highway 836 - Highway improvements from Highway 575 to Highway 27 | $1,773,500 |
| Highway 88 | Highway 88 - 16 - South of Tall Cree Indian Reserve to South of Jackpine Creek | $5,041,000 |
| Highway 88 | Highway 88 -16 - South of Jackpine Creek to Bear River | $3,022,500 |
| Highway 9 | 2 km of pavement overlay on Highway 9 - S of Highway 10 to Highway 10 (Northbound lanes and Southbound lanes) | $160,500 |
| Highway 9 | Highway 9, North of Highway 1 to North of Highway 566 | $5,000,000 |
| Higway 837 | Highway 837 - Highway improvements from Highway 575 to Highway 838 | $1,231,500 |
| Hinton | Water Treatment Plant Upgrade | $3,000,000 |
| Hinton | William A Switzer Provincial Park Water System Upgrade | $320,080 |
| Holden | Wastewater Collection System Repairs | $168,178 |
| Horburg | Hwy 11- Horburg - East of Horburg | $2,087,285 |
| Jasper | Jasper Activity and Aquatic Centre Renovation | $1,500,000 |
| Jasper | Jasper National Parks - Recapitalize campsites | $3,000,000 |
| Jensen | Hwy 62 - US Border to South of Jensen Reservoir (Selective Side sloping) | $750,000 |
| Kikino | Highway 36 - Rehabilitation to the concrete deck overlay and partial curb and pier | $238,465 |
| Kneehill | Hwy 836:4 C1 - Hwy 575 to Hwy 27 (836:04 C1 0.000 - 16.260) | $1,773,500 |
| Kneehill | Hwy 837:2 C1 - Hwy 575 to Hwy 838 (837:02 C1 0.000 - 9.150) | $1,231,500 |
| Lac La Biche | Hamlet of Lac La Biche East Lift Station | $616,667 |
| Lac La Biche | Hwy 36:26. Rehab from North of Hwy 55 to Hwy 881 | $2,326,055 |
| Lac La Biche | Hwy 55:12. Rehab from East of Hwy858 to Hwy 881 | $2,150,041 |
| Lac Ste Anne | Hwy 43-Hwy 658 - 3 km West of Hwy 18. Plus hwy 22:32 | $939,523 |
| Lac Ste. Anne | Northeast Lagoon | $500,000 |
| Lac Ste. Anne | Hwy 43-2Km W of Hwy 764 to 1 km West of Hwy 764 | $223,570 |
| Lacombe | Hwy 815-South of Hwy 12 - North of Hwy 12 | $591,722 |
| Lacombe | Hwy 12:12 C - CNR Overpass on Hwy. 12 At Alix (73621-1) | $226,500 |
| Lamont & Smoky Lake | Hwy 831:6 C1 - S of Waskatenau to Waskatenau (831:06 C1 16.100 - 23.960) | $659,000 |
| Leduc | Watermain Upgrades | $243,647 |
| Leduc | Hwy 2:30. Hwy 13 - Hwy 39 (South Bound Lane Selective) | $2,555,225 |
| Leduc | Hwy 2:30. Hwy 13 - Hwy 39 (North Bound Lane Selective) | $518,826 |
| Legal | Water Line Twin - Capacity Building | $307,916 |
| Lethbridge | North County Potable Water Co-op Project | $3,000,000 |
| Lethbridge | North Monarch Road – grading | $542,000 |
| Lethbridge | Brown Road | $503,606 |
| Lethbridge | Turin Water Distribution System | $706,633 |
| Little Smoky | Waskahigan Provincial Recreation Area Group Use Area Upgrade | $140,080 |
| Lloydminister | Hwy 17- City of Lloydminister North Boundary - Hwy 45 | $1,582,000 |
| Lloydminster | West Sanitary Sewer Trunk - Phase 1 | $1,384,460 |
| Loon River | Upgrading a 20.6 km section of currently graveled provincial Highway 88:08 to first stage pavement. | $5,150,000 |
| Lundbreck | Lundbreck Falls Provincial Recreation Area Trail Upgrades | $90,080 |
| Mackenzie | LaCrete 100th Ave and 102ns Street Improvements | $288,971 |
| MacKenzie | Hwy 88:16 - S of Jackpine Creek to Bear River (88:16 C1 39.636 - 53.750) | $3,022,500 |
| MacKenzie | Hwy 88:16 - S of Tall Cree IR to S of Jackpine Creek (88:16 C1 17.630 - 39.636) | $5,041,000 |
| MacKenzie | Bear River - S of Fort Vermilion (088:18 C1 0.000-16.920) | $2,500,000 |
| Magrath | Water Treatment and Supply System | $3,600,000 |
| Marwayne | Renewal of South 1st Street Sewer. Water and Road | $270,417 |
| Mayerthorpe | Lift Station. Forcemain and Sewage Lagoon Upgrades | $970,000 |
| Mayerthorpe | Hwy 22:32 - Town of Mayerthorpe (North of Hwy 43) | $213,523 |
| McLennan | Hwy 2:56. from Hwy 679 to McLennan | $1,411,571 |
| Medicine Hat | Emergency Chlorine Scrubber | $500,000 |
| Medicine Hat | Hwy 1:22. Canadian Pacific Rail Overpass (West Bound lane) on Highway 1. 1 km southeast of Medicine Hat boundary | $453,212 |
| Medicine Hat | Highway 1 - Bridge rehabilitation over east bound lanes | $425,000 |
| Medicine Hat | Highway 1 - Bridge rehabilitation over west bound lanes | $425,000 |
| Medicine Hat | Hwy 1:21 - Bridge Rehabilitation. Highway 1 over Gershaw Drive Interchange (East Bound Lane) in Medicine Hat | $425,000 |
| Medicine Hat | Hwy 1:21 - Bridge Rehabilitation. Highway 1 over Gershaw Drive Interchange (West Bound Lane) in Medicine Hat | $425,000 |
| Milo | Grade widening and pavement overlay of 9.1 km of Highway 542:02 | $3,773,000 |
| Mountain View | Hwy 791 - South of Hwy 27- Hwy 27 | $767,313 |
| Mountain View | Hwy 27 - East of Hwy 2 - East of Hwy 791 | $1,195,354 |
| Mundare | Mundare main Street Rehabilitation | $2,000,000 |
| Nanton | 21 Street Water & Sewer Upgrades | $1,200,000 |
| Negus River | Highway 58 - 15.7 km of grade widening and repaving within right-of-way from south of Negus River to west of High Level. including the bridge culvert | $7,841,500 |
| New Sarepta | Hwy 623:4 - From East of Village of New Sarepta West of PAR 109 | $367,500 |
| Newell | Hwy 556:02. Hwy 862 - Hwy 36 (Overlay) | $2,315,000 |
| Newell | Hwy 556- from Hwy 862 - Hwy 36 | $1,967,000 |
| Nisku | Nisku Spine Road Construction - Phase 1 | $2,500,000 |
| Northern Sunrise and Opportunity | Loon River - N of 23rd Baseline (088:08 C1 31.280-33.720. 088:10 C1 0.000-18.200) | $5,150,000 |
| Okotoks | Upgrades to 32nd Street and the Canadian Pacific Railway (CPR) crossing | $11,000,000 |
| Olds | Olds Municipal Library | $1,072,608 |
| Olds | Hwy 27- Town of Olds - Hwy 2 | $738,157 |
| Onoway | Lift Station Rehabilitation | $271,600 |
| Onoway | Lac Ste. Anne Trail Wastewater System replacement | $271,600 |
| Parkland | Sewage Lagoon for Wabamun Lake and West Half of Parkland County Area Residents | $1,050,000 |
| Parkland | Hwy 16:12. 6 kms West of Hwy 43 - Hwy 43 | $568,095 |
| Parkland | Hwy 16:14. Rehab Hwy 16A - 1 km East of Hwy 16A | $150,368 |
| Parkland | Hwy 16:14 Rehab. Hwy 43 - 2km East of Hwy 43 | $179,795 |
| Pigeon Lake | Pigeon Lake Provincial Park Sewage System Upgrade | $1,077,080 |
| Ponoka | Twp Rd 422 – grading | $181,750 |
| Ponoka | Ponoka Lagoon Expansion | $240,000 |
| Ponoka | Hwy 2A- N of Hwy 2 - South of Town of Ponoka | $279,881 |
| Ponoka | Hwy 2: S of Hwy 604 - Hwy 53 (North Bound lane) | $585,185 |
| Provost | Range Road 14 (Bodo/Hayter Road) Project No. 25597 | $2,970,000 |
| Provost | Highway Avenue | $180,000 |
| Rainbow Lake | Home Road Highway Commercial/Industrial Water & Sewer Development | $406,720 |
| Raymond | Hwy 52:2 - From Town of Raymond | $159,352 |
| Raymond | Hwy 845:2 - From Town of Raymond: Hwy 52- Raymond | $313,509 |
| Red Deer | Traffic Signal Control System Upgrade | $700,000 |
| Red Deer | Highway 11A - upgrades to Diamond Conversion interchange to improve traffic safety | $9,803,000 |
| Red Deer | Cottonwood Road and Range Road 270 Asphalt Concrete Overlay Road Improvements | $848,000 |
| Red Deer | Various Rural Roads – Base Strengthening and Double Seal Coat Road Improvements | $916,667 |
| Red Deer | Sanitary sewer and storm water Improvements | $12,000,000 |
| Redwater | Town of Redwater Downtown Storm Sewer | $810,000 |
| Rocky View | Bridge File 75853 over a Western Irrigation District irrigation canal in the M.D. of Rocky View No. 31 (Langdon) | $600,000 |
| Rocky View | Bragg Creek Waste Water Treatment Plant and Collection System | $1,000,000 |
| Rosemary | Wastewater Lift Station | $49,373 |
| Route 109 | Pavement rehabilitation on Route 109 | $362,500 |
| Saddle Hills | Pillsworth Road (Range Rd 115) - Grading. Bridge Culvert | $750,000 |
| Seba Beach | 10th Street North Bridge Replacement | $23,333 |
| Sedgewick | Sedgewick Sanitary Sewer Priorities | $956,610 |
| Slave Lake | Southshore Regional Wastewater Re-use & Green Infrastructure System | $1,548,333 |
| Smoke Lake | Smoke Lake and Iosegun Lake Provincial Recreation Areas Campground Upgrades | $115,080 |
| Smoky Lake | Hwy 855- North Saskatchewan River - Hwy 28 | $1,608,525 |
| Smoky Lake | Highway 855 - 16.4 km of pavement overlay on Highway 855 - Highway 28 to North of Town of Smoky Lake | $1,432,500 |
| Spirit River | Elevator Road & Cargill Road Paving Overlay | $336,761 |
| Spirit River | Main Street Storm Sewer | $267,358 |
| Spring Coulee | Hwy 5- Cardston - South of Spring Coulee | $2,156,437 |
| Spring Lake | Local Road Paving | $278,650 |
| Spruce Grove | Valking Road - West Cove Drive Upgrade Project | $43,333 |
| St. Lina | Hwy 867 - West of St Lina to County Boundary | $1,344,000 |
| St. Paul | Hwy 41:22 C - North Saskatchewan River Bridge on Highway 41. 4 Km S of Elk Point (70318-1) | $1,983,000 |
| Starland | Hwy 575:4 C1 - E of Hwy 836 to Town of Drumheller (575:04 C1 18.202 - 37.010) | $1,775,000 |
| Steephill Creek | Hwy 697:04. Rehab from Steephill Creek to South of Buffalo Head Prairie | $1,561,985 |
| Stettler | Wastewater Treatment Facility Upgrades | $689,846 |
| Stettler | Hwy 12 - Town of Stettler (various locations) | $485,500 |
| Stettler | County of Stettler Central-East and South-East Region Water Servicing | $3,000,000 |
| Stony Plain | West Trunk Sanitary Sewer Line | $2,325,662 |
| Strathcona | Cogeneration of electricity using renewable biogas | $1,043,000 |
| Strathcona | West of Tofield (14:06 C1 13.200-14.600. C1 18.000-19.300. C1 23.000-24.300. C1 26.300-28.000) | $402,500 |
| Strome | Hwy 13- 6 km West of Village of Strome - Hwy 36 | $1,357,789 |
| Suffield | Hwy 524:06. E of Hwy 879- South of Suffield | $2,245,065 |
| Sundre | Hwy 27- Town of Sundre- Town of Olds | $4,137,237 |
| Sundre | Water and Wastewater Eastside Servicing | $3,000,000 |
| Swan Hills | Hwy 33 - Swan Hills to South of 18th Baseline | $7,091,690 |
| Taber | Taber North West Storm Water Improvements | $2,950,000 |
| The Pas | Water Treatment Plant Upgrades | $828,661 |
| Thorhild | Correction line Road | $829,852 |
| Thorhild | Long Lake Emergency Access Road | $199,004 |
| Thorhild | Opal Road Resurfacing from Twp Road 590 to Highway 18 | $1,349,333 |
| Thorhild | Hwy 661:10. 12 C1 - W of Hwy 63 to Hwy 831 (661:10 C1 39.945 - 40.993; 661:12 C1 0.000 - 8.977) | $722,500 |
| Three Hills | Hwy 21:14. Threehills Creek Bridge on Highway 21. 10 km South of Three Hills | $114,660 |
| Tofield | Constructing 5.7 km of passing lanes (4 locations) on Highway 14:06 | $402,500 |
| Touchwood Lake | Lakeland Provincial Recreation Area Playground at Touchwood Lake | $80,080 |
| Trochu | Dry Island Buffalo Jump Provincial Park New Water Supply System | $75,080 |
| Turner Valley | Sheep River Intermunicipal Library | $983,000 |
| Vegreville | 49 street 2010 Capital Works Project | $327,720 |
| Vermilion | Downtown Core Underground and Streetscape Improvements | $1,471,017 |
| Vulcan | Sewage Lagoon Relocation | $2,203,279 |
| Vulcan | West of Milo to Milo (542:02 C1 18.510-27.610) | $3,773,000 |
| Wabamun | 51 Ave Rehabilitation | $225,358 |
| Wainwright | Minburn Road Grading | $980,000 |
| Wainwright | Ribstone Road (Rge Rd 205) – grading | $750,000 |
| Wainwright | Water System Flush Off Points | $18,256 |
| Wapiti River | O'Brien Provincial Park Trail Improvement | $90,080 |
| Warburg | Residential Access Roads Project/Install Water /Sewer Services | $400,000 |
| Warner | New Dayton Drainage Pipeline | $165,526 |
| Waskatenau | 7.9 km of pavement overlay on Highway 831 - South of Waskatenau to Waskatenau | $659,000 |
| Wataskwin | Hwy 611- W of Hwy 2 - West of Hwy 2A | $585,248 |
| Wataskwin | Hwy 13 from Hwy 20 - Hwy 2 | $1,730,639 |
| Wataskwin | Hwy 2: S of Hwy 53 - Hwy 13 (South Bound lane) | $1,770,871 |
| Waterton | Waterton Lakes National Parks - Construct bike path from park entry to townsite | $2,000,000 |
| Watino | Hwy 49-East of Hwy 739 - Watino Bridge | $1,946,808 |
| Wentzel River | Highway 58 - 23.3 km of grading work to Garden River Road from east of the Wentzel River to the Wood Buffalo Park Boundary to convert Garden River Road to Hwy 58 | $2,291,750 |
| Westlock | Westlock County Lagoon's Rehabilitation and Treatment | $637,518 |
| Westlock | Westlock Sanitary Main Trunk Sewer | $851,780 |
| Westlock | Hwy 801:02. Pave gravel road from Hwy 661 to North of Long Island Park Access Road. | $2,067,606 |
| Wetaskiwin | Yeoford Road - Base & Pave | $811,666 |
| Wetaskwin | Hwy 2A-S of City of Wetaskwin - North of Hwy 611 | $831,833 |
| Wheatland | Hwy 24- Hwy 22X - Hwy 1 | $2,003,417 |
| Whitelaw-Fairview | Hwy 2- West of Whitelaw –Fairview | $3,230,901 |
| Willow Creek | Brobble Road | $145,860 |
| Wood Buffalo | 2010 Sewer Main Replacement | $2,166,666 |
| Woodlands | Water/Sewer Servicing for Whitecourt Airport and Surrounding Subdivisions | $1,693,450 |
| Yellowhead | North of Hwy 16 to South of Berland River (040:30 C1 6.850-8.500. C1 28.240-30.000. C1 32.500-34.000. C1 37.050-38.430) | $3,250,000 |