| Location | Project | Federal Contribution |
|---|---|---|
| 100 Mile House | Highway 97: Stormy Road North - 4 laning 1 km of highway (extension) | $1,064,643 |
| 100 Mile House | Highway 97: Bullock Lake Rd South | * |
| 150 Mile House | Highway 97: 148 Mile to Likely Rd | * |
| Abbotsford | Parallel Taxiway and Apron Widening | $10,000,000 |
| Abbotsford | Clearbrook Interchange Reconstruction | $8,333,333 |
| Abbotsford | "Discovery Trail" | $469,913 |
| Abbotsford | Highway 1: 264th Avenue to Vedder Canal | $900,000 |
| Abbottsford | Upgrade of the McCallum Road Interchange | $8,333,333 |
| Alberni-Clayoquot | Airport Improvement Project | $251,500 |
| Alert Bay | Alert Bay Road Upgrade | $145,000 |
| Alert Bay | Alert Bay Road Upgrade Phase Two | $55,000 |
| Anmore | Water System Renewal and Upgrades | $178,428 |
| Armstrong | Highway 97A Larkin Road to Crozier Road | $12,130,000 |
| Armstrong | Highway 97:Armstrong Four-laning | $6,660,000 |
| Ashcroft | Highway 1 - Oregan Jack 1 km South of Jct Hwy 97C | $1,100,000 |
| Bamfield | Water System Upgrades | $66,667 |
| Barriere | Water Infrastructure Updates | $262,894 |
| Barriere | Community Park Multi-Use Greenway | $27,000 |
| Barriere | Community Park Improvement Facilities | $166,667 |
| Beaverly | Fire Rescue Hall Construction project | $200,000 |
| Boston Bar | Highway 1: Anderson River Bridge #0552 | $1,800,000 |
| Bowen Island | Snug Cove Sewer Treatment Facility Expansion | $584,059 |
| Britannia | Infrastructure Components for the Britannia Project | $1,000,000 |
| British Colombia | Construction of the Northwest Transmission Line | $130,000,000 |
| Burnaby | Water Infrastructure Replacement Program | $2,466,666 |
| Burns Lake | Renewal and Enhancement of Cultural and Recreational Infrastructure | $113,993 |
| Burns Lake | Highway 16: Priestly Station | * |
| Burns Lake | Ridler Forest Service Road Construction | $150,000 |
| Campbell River | Northern Area - D Sewage Project - Phase 1 | $1,709,361 |
| Campbell River | South Island Highway Improvement Project - Phase 1 | $4,380,250 |
| Campbell River | Campbell River Airport Runway Extension | $2,777,083 |
| Campbell River | Penfield West Linear Park | $137,142 |
| Campbell River | Campbell River Pedestrian Crossings along Highway 19A | $28,000 |
| Campbell River | Campbell River Terminal | $150,000 |
| Campbell River/Woss | Highway 19: Mohun Bridge #1515 and Lukwa River Bridge #2595 | $414,000 |
| Canal Flats | Headwaters Walkway | $101,333 |
| Capital Regional District | Village Point Waste Water and Water System Upgrade | $1,514,792 |
| Capital Regional District | Mt. Belcher Water System Upgrade. Salt Spring Island | $79,344 |
| Capital Regional District | Feasibility Studies for Wastewater Treatment in the Capital Regional District | $3,333,333 |
| Cariboo | 108 Mile Water Reservoir Replacement | $367,000 |
| Cassidy | Highway 1: Nanaimo River Road to Spitfire Road | $675,000 |
| Cassidy | Highway 1: Spruston Road to Beck Road | $405,000 |
| Castlegar | 5th Street and 7th Avenue Walkways | $230,500 |
| Castlegar | Castlegar Air Tanker Base | $606,000 |
| Cedar Heights | Water System Universal Metering | $82,817 |
| Central Kootenay | Energy Efficiencies - Nelson. Castlegar. Creston Community Complexes | $187,500 |
| Central Okanagan | Wastewater Treatment Plant. Stage 3 | $2,459,053 |
| Chase | Water Supply and Treatment Upgrade | $2,270,959 |
| Chetwynd | Chetwynd - 53rd Avenue SE Road Construction | $198,873 |
| Chetwynd | Highway 97: Bennett Creek to Link Creek | * |
| Chilliwack | Hatzic Prairie Water System Extension | $492,800 |
| Chilliwack | Sewer upgrades | $1,300,000 |
| Chilliwack | Lickman Road Phase 2 | $450,000 |
| Chilliwack | West Dyke Upgrades. Left Bank | $1,085,000 |
| Chilliwack | Hamilton Avenue Sidewalk Project | $17,625 |
| Chilliwack | Keith Wilson Road Sidewalk Project | $8,757 |
| Chilliwack | Bernard Avenue Sidewalk Project | $11,250 |
| Chilliwack | South Sumas Road Sidewalk Project | $13,751 |
| Chilliwack | Pedestrian/Cycling Overpass crossing the CNR tracks at Bedford Landing | $77,255 |
| Chilliwack | Highway 1: Lickman Road to Young Road | $450,000 |
| Christina Lake | Highway 3: Paulson Bridge to Avalanche Gate | $1,125,000 |
| Clinton | Lebourdais Avenue Improvements | $187,500 |
| Clinton | Highway 97: Cargyle Curves | * |
| Clinton | Highway 97: 59 Mile North | * |
| Coldstream | Grid Road Connection to Highway 97 | $2,307,139 |
| Coldstream | Park Development | $187,500 |
| Columbia-Shuswap | Glacier National Park - Repave section of Trans Canada Highway | $3,300,000 |
| Columbia-Shuswap and Golden | Glacier & Yoho National Parks - Recapitalize elements of six highway bridges (e.g. abutments. decks. guardrails) on the Trans Canada Highway | $3,932,000 |
| Colwood | Fisgard Lighthouse National Historic Site - Rehabilitate interior (reception area). seismic upgrade and replace gang-way | $528,000 |
| Comox | Knight Road Sanitary Sewer Trunks | $273,000 |
| Comox | Guthrie Road Cycle lane Extensions | $24,675 |
| Comox | Highway 19A - 17th Street Bridge Right Turn Lane | $650,000 |
| Coquitlam | Southwest Coquitlam Sewer System - Construct a new common force main | $416,666 |
| Coquitlam | Schoolhouse Street Improvements | $2,400,000 |
| Coquitlam | King Edward Street Improvements | $2,466,666 |
| Coquitlam | Whiting-Westview Bike Route | $29,531 |
| Coquitlam | Improvements to the Lougheed and Barnet Highways | $6,200,000 |
| Courtenay | Arden Trunk Sewer - Riverside Lane to 20th Street | $500,000 |
| Courtenay | Native Sons Hall | $644,566 |
| Cowichan Lake | South Shore Roadway Upgrade McGill Overpass | $300,000 |
| Cowichan Valley | Historic Kinsol Trestle Rehabilitation | $1,885,366 |
| Cranbrook | Waste Water Capacity Improvements application | $4,815,000 |
| Cranbrook | Fibre Optic Broadband Infrastructure Development | $750,000 |
| Cranbrook | St. Mary's Wycliffe Bridge | * |
| Creston | Creston - Wastewater Treatment Plant Improvements | $1,570,000 |
| Creston | WWTP Improvements - BVF Cover. Second Clarifier & Backup Power | $833,333 |
| Creston | Creston LocalMotion | $58,725 |
| Cumberland | Lagoon Upgrading Project | $166,667 |
| Dawson Creek | Calvin Kruk Centre for the Arts | $3,199,721 |
| Dawson Creek | 92nd Avenue Storm Water Drainage Upgrades | $257,333 |
| Dawson Creek | Highway 97: 12 Mile Passing Lane | * |
| Dawson Creek | Swan Lake Bridge | * |
| Dawson Creek | Boundary Road (Oil & Gas) 2 | * |
| Delta | 82 Avenue Upgrade - Phase III (from 112A Street to 116 Street) | $1,000,000 |
| Delta | Archives Building Conversion | $225,000 |
| Delta | East Delta/Oliver Pump Station Upgrade | $1,346,666 |
| Delta | East Delta - Boundary Bay Dyke Foreshore Upgrade | $233,333 |
| Delta | Westham Island Dyke (Trim Road) Upgrade | $88,839 |
| Delta | Annacis Centre of Excellence | $3,000,000 |
| Delta | Highway 17: 28th Avenue Overpass | $2,387,500 |
| Delta/Surrey | Highway 99: Highway 17 underpass to Nicomekl River | $1,350,000 |
| Departure Bay | Departure Bay Terminal - Sewage Pump Ashore | $481,057 |
| Dewdney | Highway 7L Mission to Dewdney | $1,035,000 |
| Donald | Highway 1 - Donald Bridges | $30,440,000 |
| Duke Point | Duke Point Terminal - Sewage Pump Ashore | $477,015 |
| Duncan | Centennial Park Project | $137,721 |
| Duncan | Downtown Revitalization Proejct | $200,000 |
| East Kootenay | Windermere and Timber Ridge Bulk Water Supply and Water Meter Installation Project | $1,030,333 |
| East Kootenay | Arena Upgrade | $187,500 |
| East Kootenay | Kootenay National Park - Stabilize rock cuts along Highway 93 | $1,100,000 |
| Elko | Highway 3: Elko Passing Lane | * |
| Enderby | Highway 97: Enderby Intersection - Intersection Improvements | $1,750,000 |
| Enderby | Sludge Dewatering/Nutrient Level Control | $408,333 |
| Enderby | Non-Residential Metering Program | $166,000 |
| Enderby | Highway 97A: east of Enderby to Springbend Road | $850,000 |
| Esquimalt | Esquimalt - Upgrading of Archie Browning Sports Centre | $664,000 |
| Esquimalt | New Sidewalk Construction Program - Phase 1 | $37,155 |
| Falkland | Highway 97: Falkland Bridge to Pinaus Road - Asphalt Resurfacing | $1,350,000 |
| Falkland | Highway 97 - Zinkmantle Passing Lane | $2,500,000 |
| Falkland | Blockline Road Climbing Lane | $1,150,000 |
| Fernie | NW Reservoir / James White Well | $2,415,240 |
| Fernie | Highway 3: Elko overhead to Fernie Ski Hill Road | $2,480,000 |
| Fort Nelson | Highway 77: Deasum Creek to NWT Border - Base strengthening and sealcoating 25 kms. | $2,048,975 |
| Fort Nelson | Drinking Water Quality. Security of Supply and Energy Efficiency | $1,290,000 |
| Fort Nelson | Community Trail Master Plan - Phase 1 | $301,338 |
| Fort St. James | Driftwood Forest Service Road Relocation and Realignment | $237,500 |
| Fort St. John | Wastewater Treatment Plant Upgrades | $842,333 |
| Fort St. John | Highway 97: Road 271 to Charlie Lake | * |
| Fort St. John | 100th Avenue Expansion | $1,398,595 |
| Fort St. John | Fort St. John - North Lagoon Trunkmain Twinning | $1,426,928 |
| Fort St. John | Enerplex Site Improvements | $2,505,899 |
| Fort St. John | 100th Street Community Trail | $247,431 |
| Fort St. John | Doig and Siphon Ck Rds (Oil & Gas) | * |
| Fort St. John | Highway 97: Taylor Bridge | * |
| Fort St. John | North Peace Side Road Improvements Phase 2 | $2,250,000 |
| Fraser Lake | Arena Upgrades | $146,972 |
| Fraser Lake | Francois Lake Road: Fraser Lake Road to Birch Bay Road | $675,000 |
| Fraser Richmon | North Access Road Services Extension Project | $520,500 |
| Fraser Valley | Popkum/Bridal Falls - Electoral Area D Integrated Water System | $908,666 |
| Fraser Valley | Hope Arena Roof Replacement and Enhanced Dressing Room Project | $187,500 |
| Galiano Island | Galiano Island (South Gulf Islands) resurfacing | $675,000 |
| Gold River | Well redevelopment. rehabilitation & emergency power | $85,000 |
| Gold River | Arena Refrigeration Plant Upgrade | $150,000 |
| Gold River | Highway 28: Western Mine Road to Argonaut Road | $450,000 |
| Golden | Kicking Horse Canyon Brake Check to Yoho | $32,000,000 |
| Golden | Kicking Horse Canyon Golden Hill to West Portal | $32,000,000 |
| Golden | Yoho National Park - Repave section of Trans Canada Highway | $3,300,000 |
| Golden | Yoho National Park - Repave Stephen Creek Lane in Field Townsite | $330,000 |
| Grand Forks | Pathways and Bikelanes Construction | $356,000 |
| Harrison Hot Springs | Memorial Hall Renovations | $200,000 |
| Hazelton | Storm Sewer. Street and Sidewalk Renewal - Omineca. River and Government Streets | $200,000 |
| Highway 1 | Highway 1 - Sagebrush Overpass to Vicars Road & Orchards Walk to Kokanee Way | $630,000 |
| Highway 1 | Highway 1: Cedar Road to Nanaimo River Road centre median | $1,035,000 |
| Highway 1 | Highway 1 from Blaeberry bridge east to Golden West Approach | $1,800,000 |
| Highway 16 | Highway 16 - Lake Kathyn Rd to Smither | $1,575,000 |
| Highway 16 | Highway 16 - Carnaby Rd to New Hazelton Overpass | $900,000 |
| Highway 3 | Highway 3 - Curzon Overhead to Ryan Bridge | $1,049,000 |
| Highway 3A | Highway 3A - Jct Highway 3 Keremeous to Yellow Lake | $1,170,000 |
| Highway 5 | Highway 5 - Ottomite Bridge | $653,000 |
| Highway 97 | Highway 97 - 5th Avenue to North Kelly Road | $2,250,000 |
| Highway 97 | Highway 97 Skaha Lake Bridge to Fairway Avenue | $1,050,000 |
| Highway 97 | Highway 97 - Jct Highway 2 to Kiskatinaw Bridge | $1,550,000 |
| Hope | Kawkawa Lake Road Bridge Replacement | $3,345,833 |
| Hope | Highway 3: Cedar Creek Bridges 1 and 2 - Replace the two aged structures | $2,683,961 |
| Hope | Silverhope Creek Riprap Bank Protection | $50,716 |
| Hope | Kawkawa Lake Upgrades and Memorial park | $83,745 |
| Hope | Highway 1 - Lake of the Woods Left Turn Bay | $650,000 |
| Hope | Highway 5: Hope to Portia Bridge | * |
| Hope | Highway 1: Silverhope East and Silverhope West Overpasses | $616,500 |
| Hope/Bridal Falls | Highway 1: Hope to Bridal Falls | * |
| Horseshoe Bay | Berth 3 Ramp Coatings | $214,984 |
| Horseshoe Bay | Horseshoe Bay Terminal | $650,000 |
| Hosmer | Highway 3 Hosmer-Olsen Passing Lanes | $3,500,000 |
| Houston | Walking/Biking/Cycling Circle Network | $131,250 |
| Houston | Well Water No. 1 - Backup Power | $80,043 |
| Houston | Highway 16 - Hungry Hill and 6 Mile Truck Lanes | $250,000 |
| Hudson's Hope | Arena Heat Recovery | $108,755 |
| Hudsons Hope | Beryl Prairie Road (Oil & Gas) | * |
| Hwy 1 | Highway 1: 21st Street & Taylor Way Westbound Overpasses | * |
| Hwy 16 | Highway 16: Loos Road | * |
| Hwy 3A | Highway 3A: Grey Creek to Lockhart Ck Bridge | * |
| Hwy 5 | Highway 5: North Thompson Passing Lane | * |
| Hwy 97 | Highway 97: Wright Creek | * |
| Hwy 97 | Highway 97/6: 25th Avenue Intersection | * |
| Hwy 97 | Highway 97: Hinche Road to Borland Creek | * |
| Invermere | Westside Pathway System | $99,483 |
| Kamloops | Wastewater Treatment Plant Upgrade | $7,100,000 |
| Kamloops | Blue River Community Water System Upgrade | $388,625 |
| Kamloops | Spences Bridge Community Water System Upgrade | $229,666 |
| Kamloops | Highway 1 Monte Creek to Pritchard | $16,700,000 |
| Kamloops | Rayleigh Slo-Pitch Park - Phase 1 | $3,263,333 |
| Kamloops | Westsyde Riverbank Protection | $291,666 |
| Kamloops | Singh Street Multi-Use Pathway | $91,466 |
| Kamloops | Kamloops Transit Maintenance Facility | $4,000,000 |
| Kaslo | The Lakeview Trail Phase 1 | $9,975 |
| Kaslo | Kaslo City Hall Heating Retofit | $84,333 |
| Kelowna | Westside - Sewer Services Extension | $3,000,000 |
| Kelowna | Highway 97: Gordon and Highway 33 | * |
| Kelowna | Highway 33: Walker Hill - 2-km truck climbing lane | $2,000,000 |
| Kelowna | Active Transportation Network | $3,833,333 |
| Kelowna | Upgrade Gordon Drive and replace Mission Creek Bridge | $5,200,000 |
| Kelowna | Community Parks and Open Space Network | $1,047,000 |
| Kelowna | Gordon Drive Multi-Purpose Pathway Project | $350,000 |
| Kelowna | Highway 97A: Westside Interchange | $10,977,000 |
| Kelowna | Kelowna Transit Maintenance Facility | $2,300,000 |
| Kelowna | RapidBus service expansion | $15,500,000 |
| Kimberley | Marysville Watermain Replacement Upgrade | $667,000 |
| Kimberley | Highway 95A Sidewalk Project | $168,125 |
| Kimberley | Peak to Platzl Trail | $60,000 |
| Kimberley | Library - Environmental and Accessible Upgrades | $164,417 |
| Kimberley | Highway 95A: Fortier Street to Kuppenbender Road 2 | * |
| Kitimat | Walkway Rejuvenation Project | $174,333 |
| Kootenay Boundary | Living Arts Centre Wastewater Treatment | $133,333 |
| Ladysmith | Ball Field Project | $187,500 |
| Laidlaw | Highway 1: Laidlaw to Flood-Hope Road Resurfacing | $1,800,000 |
| Lake Country | Highway 97 Winfield to Oyama | $33,600,000 |
| Lake Country | Wood Lake Water Quality & Supply Improvements | $1,680,000 |
| Lake Cowichan | Domestic Water Metering - Stage 1 | $200,000 |
| Langdale | Langdale Terminal - Sewage Pump Ashore | $785,400 |
| Langdale | Langdale Ferry Terminal | $1,800,000 |
| Langford | City Centre park Sports Plex | $4,464,547 |
| Langford | City of Langford Stormwater Flood Hazard Protection | $614,075 |
| Langford | Improving Active Transportation along Goldstream Avenue | $122,146 |
| Langley | Fraser Highway/Nicomekl Bridge Replacement | $2,639,678 |
| Langley | Aldergrove Water Treatment Plant - Heat Recovery | $33,333 |
| Langley | 96 Avenue Widening and Intersection Improvements at 198 Street and Telegraph Trail | $839,460 |
| Langley | Highway 10: Asphalt Resurfacing East of Langley | $540,000 |
| Langley | West Langley Dyke Upgrade EMBC | $737,586 |
| Langley | Langley 202 Street Park and Ride | $19,159,000 |
| Langley | Upgrading 208th Avenue | $1,680,000 |
| Langley | Fort Langley & Gulf of Georgia National Historic Site - Replace exhibits with new interpretive media | $682,000 |
| Langley | Fort Langley National Historic Site - Rehabilitate palisade. including sill logs and gallery. Rehabilitate storehouse | $2,530,000 |
| Lillooet | Highway 99: Gott Creek Bridge - Replacement of 1-lane bridge with 2-lane bridge on improved alignment | $1,250,000 |
| Lillooet | Main Street Multi-Use Pathway - Phase 1 | $60,000 |
| Lillooet | Conservation and Reduction Project - Phase 1 | $166,667 |
| Lillooet | Siwhe Bridge | * |
| Lillooet | Highway 99: Regional Boundary to Long Cayoosh Bridge | $990,000 |
| Lillooet | Highway 99: Fountain Slide slope | $1,100,000 |
| Lions Bay | Lower Lions Bay Water Line Replacement | $291,666 |
| Lions Bay | Sewer Treatment Plant Kelvin Grove | $27,483 |
| Logan Lake | Wastewater Upgrade Project | $81,960 |
| Lone Butte | Highway 24: Highway 97 to Lorne Butte | * |
| Lumby | Water Supply - Stage 3 | $200,283 |
| Lumby | Shuswap Avenue Pathway | $57,533 |
| Mackenzie | Sewage Detention Lagoon | $342,470 |
| Mackenzie | Mackenzie Connector | $5,250,000 |
| Maple Ridge | Albion Dyke Upgrade. Kanaka Creek regional Park (stage 2) | $175,000 |
| Maple Ridge | Maple Ridge Downtown Core Road & Utility Rehabilitation | $1,868,488 |
| Maple Ridge | North Alouette River Greenway Bridge Crossing | $24,750 |
| Maple Ridge | Maple Ridge Sewer Extension | $3,000,000 |
| Masset | Waterline Replacement | $517,965 |
| Masset | Northwest Drive Path | $16,325 |
| McBride | Eco-Sensitive Solution to Waste Water Treatment | $517,598 |
| McBride | Eco-Sensitive Solution to Waste Water Treatment - Phase 2 | $691,666 |
| McBride | Water Metering and Conservation Project | $125,000 |
| Merritt | South East Balancing Reservoir | $777,377 |
| Merritt | Structural Rehabilitation and Dehumidification Upgrade | $101,866 |
| Merritt | City Centre Enhancement | $133,333 |
| Merritt | Highway 97C - Coldwater Interchange to Brake Check (Hamilton Hill) | $985,000 |
| Merritt | Highway 5 Great Bear Snowshed | $825,000 |
| Metchosin | Resurfacing of Hwy 14 from Metchosin to Sooke | $2,700,000 |
| Metchosin | Highway 4: Tofino area resurfacing | $900,000 |
| Mission | Construction of Cedar St | $1,293,675 |
| Mission | Highway 11 - Mission Bridge Railing Improvement | $750,000 |
| Mission | Highway 7: Wren to Nelson | * |
| Mission | Florence Lake Forest Service Road | $510,000 |
| Mission | Highway 7: Chester Road to Nelson Road | $225,000 |
| Mount Waddington | Woss Community Infrastructure Project | $161,958 |
| Nanaimo | Cruise ship terminal facility | $8,500,000 |
| Nanaimo | Nanaimo Airport Improvement Project Phase 2 | $3,456,456 |
| Nanaimo | Meadow Drive Community Park Development | $18,495 |
| Nazko | Michelle-Baezaeko Forest Service Road Upgrade | $104,000 |
| Nazko | Michelle-Coglistiko Forest Service Road | $230,000 |
| Nazko | Snaking River Forest Service Road Upgrade | $180,000 |
| Nelson | Pedestrian Sidewalk/Pathway Extension and Bridge Improvements | $120,875 |
| Nelson | YRB Yard Sewer System Replacement | $187,500 |
| Nelson | Highway 3A - Nelson Westbound Passing Lane | $3,250,000 |
| New Denver | Municipal Officer/Works Building Upgrade | $139,994 |
| New Hazelton | Water Distribution System Improvements | $285,333 |
| New Westminster | Salter Street Access Road | $50,000 |
| New Westminster | Streets & Sidewalks Revitalization | $2,666,666 |
| New Westminster | Westminster Pier Park | $8,300,914 |
| North Arm | North Arm Marine Facilities Capital Improvements | $185,000 |
| North Kelly, Reid Lake, Ness Lake and Buckhorn and Pineview | Fort George Side Road Improvements | $900,000 |
| North Okanagan | Enderby & District Sports Complex Upgrade | $166,666 |
| North Okanagan | Water Treatment Upgrade | $200,000 |
| North Peace | Siphon Creek Road | $2,500,000 |
| North Saanich | Highway 17: McTavish Interchange - Grade separation of McTavish Rd (Airport Access) | $10,500,000 |
| North Vancouver | Capilano Road Improvements | $979,962 |
| North Vancouver | Highway 1: Iron Workers Memorial Bridge - Rehabilitation of structural members | $405,000 |
| North Vancouver | Bridge Rehabilitation and Seismic Upgrades | $482,666 |
| North Vancouver | District of North Vancouver Installation of Priority Sidewalks | $493,333 |
| North Vancouver | Lynnmour Dyke Flood Protection | $142,780 |
| North Vancouver | North Vancouver - Spirit Trail Harbourside West Pedestrian Overpass and Multi-Use Trail | $800,338 |
| North Vancouver | North Vancouver - Windsor Artificial Turf Sports Field | $1,079,666 |
| North/West Vancouver | Highway 99 - Old Capilano Bridge: Marine Drive/Lions Gate Transit - Transit priority measures including replacement of Blue Bridge | $18,000,000 |
| Northern Rockies | Fort Nelson Recreation Complex | $5,000,000 |
| Northern Rockies | Raw Water Supply Energy Efficiency Upgrades | $200,000 |
| Okanagan | Streamlined Water Use Pilot | $77,000 |
| Okanagan-Similkameen | Okanagan Falls Sewage Treatment Plant | $3,126,666 |
| Old Caribou Highway | Old Caribou Highway & Upper Fraser Road Rehabilitation | $1,125,000 |
| Osoyoos | 87th Street reconstruction and sidewalk | $196,666 |
| Osoyoos | Sewage Lagoon Aeration System - Energy Reduction Program | $134,333 |
| Osoyoos | Highway 97 - Deadman Passing Lanes | $4,000,000 |
| Parksville | Moilliet Street Upgrade | $872,771 |
| Parksville | Wright Road - Water Distribution Upgrade | $46,667 |
| Peace River | Harper and Imperial Subdivisions - Community Sewer System | $589,283 |
| Peace River | Buick Creek Arena | $200,000 |
| Peachland | Beach Avenue Roadway and Multi-Use Pathway Improvements | $1,130,000 |
| Peachland | Peachland Curling Club Facility | $1,305,118 |
| Pemberton | Water Main Looping | $214,620 |
| Pemberton | Pemberton Skate and Bike Skills Park | $122,618 |
| Pemberton | One Mile Lake Accessible Trail Improvements | $20,000 |
| Pemberton | Water Metering and leak detection | $166,667 |
| Penticton | West Bench Improvement District Treated Water Supply and Upgrade | $1,690,000 |
| Penticton | Faulder Water System Improvements | $305,117 |
| Penticton | Penticton Community Centre - Aquatics. Fitness. Sport. and Recreation | $7,674,983 |
| Pitt Meadows | Highway 7 Rapid Bus Lane | $8,000,000 |
| Pitt Meadows | Construction of an Artificial Turf Playing Field | $595,126 |
| Pleasant Valley | Highway 97A- Pleasant Valley to Landsdowne | $6,660,000 |
| Port Alberni | China Creek Watermain Replacement Phase 2 | $583,333 |
| Port Alberni | Resurfacing of Highway 4 west of Riverbend Bridge | $1,395,000 |
| Port Alberni | Nook Culvert | * |
| Port Alice | Port Alice Community Centre Upgrade | $345,500 |
| Port Alice | Community Centre Upgrade | $200,000 |
| Port Clements | Sewage Treatment Facility Upgrade | $41,142 |
| Port Coquitlam | Port Coquitlam - Broadway Street Reconstruction | $3,789,649 |
| Port Coquitlam/Coquitlam | Highway 7B/7 - Mary Hill Bypass/Port Coquitlam | $832,500 |
| Port Edward | Replacement of Aging and Failing Watermains - Phase I | $523,333 |
| Port Edward | Replacement of Water Mains | $200,000 |
| Port Edward | Port Edward Water Supply | $250,000 |
| Port Hardy | Rehabilitation of roads | $775,283 |
| Port Hardy | E-Friendly & Accessibility Retrofit: Port Hardy Curling Club | $64,667 |
| Port Hardy | Large Creek Box Culvert | * |
| Port McNeill | Water Line Renewal | $1,400,000 |
| Port Moody | Noons Creek Bridge Replacement | $501,891 |
| Port Renfrew | Fire and Community Centre Energy Refit and Construction Project | $173,333 |
| Port Renfrew | Highway 14 - Port Renfrew Area | $2,000,000 |
| Pouce Coupe | Lagoon Berm Stabilization | $87,083 |
| Pouce Coupe | Water Reservoir Project | $500,000 |
| Pouce Coupe | Pouce Coupe Fire Hall Project | $200,000 |
| Pouce Coupe | Highway 2: Tate Creek North/South & Blockline | * |
| Powell River | Pavement Management | $998,667 |
| Powell River | Drinking Water Disinfection Upgrade | $2,828,333 |
| Powell River | Powell River (Westview) Terminal - Sewage Pump Ashore | $433,125 |
| Prince George | Highway 97: Bentley to Okanagan (2007-2008) | * |
| Prince George | Highway 97: Prince George South Weigh Scale | * |
| Prince George | Highway 97: Simon Fraser Bridge to Stinch | * |
| Prince George | Highway 97: Stone Creek Bridge - New 4-lane structure | $13,000,000 |
| Prince George | Boundary Road Connector | $7,500,000 |
| Prince George | Audible Signal Retrofit Program | $56,894 |
| Prince George | 2009 Spring Freshet Damage Repair and Drainage Improvements | $1,200,000 |
| Prince George | Highway 16: Sunny Slope Road | * |
| Prince George | Highway 16: Domano/Tyner | * |
| Prince Rupert | Hays Creek Sewer Relocation | $1,332,108 |
| Prince Rupert | Community Pathways Enhancements & Development | $50,000 |
| Prince Rupert | Atlin Terminal Building | $1,000,000 |
| Prince Rupert | Oona River and Oona River Lower Bridges | * |
| Prince Rupert / Port Hardy | Sewage Pump Ashore | $748,440 |
| Princeton | Tulameen River Bridge Restoration | $63,000 |
| Princeton | Princeton Regional Library | $199,499 |
| Pritchard | Highway 1 - Pritchard to Hoffman's Bluff | $26,900,000 |
| Qualicum | Beach To Upgrade School Connector Trail | $50,000 |
| Qualicum | Qualicum Beach Roundabout | $187,500 |
| Qualicum Beach | Qualicum Beach - Berwick Water Supply Upgrade | $1,126,666 |
| Quesnel | Highway 97: Dale to Dragon | * |
| Quesnel | Highway 97: Hixon Bridge | * |
| Quesnel | Highway 97: Cody Rd to Australian - 4 laning 2.5 kms of highway | $4,500,000 |
| Quesnel | West Quesnel Land Stability | $1,577,000 |
| Quesnel | Dragon Hill/Valhalla Trail | $41,429 |
| Quesnel | Deserters Bridge | * |
| Radium Hot Springs | Columbia Avenue Sidewalk | $10,000 |
| Radium Hot Springs | Radium Fire Hall | $200,000 |
| Revelstoke | Highway 1 Clanwilliam Bridge | $14,000,000 |
| Revelstoke | Clearview Heights Sanitary Sewer Extension | $419,259 |
| Revelstoke | Downie Street Lift Station Upgrade | $745,566 |
| Revelstoke | Revelstoke Aquatic Centre Heat Recovery System | $176,333 |
| Revelstoke | Trans Canada Highway Water Reservoir Replacement | $322,000 |
| Revelstoke | River Trail - Top of Hill | $24,983 |
| Richmond | Forest Service Roads - Road upgrade/rehabilitation | $10,000,000 |
| Richmond | Highway 99: Sea Island Way to Westminster Highway - Southbound shoulder bus lane | $5,300,000 |
| Richmond | Grade separation of Nelson Road | $6,366,666 |
| Richmond | Extend Landsdowne Road to link #3 Road and Olympic Oval | $666,666 |
| Richmond | Richmond Properties No. 8/Blundell Traffic Signal and Rail Crossing Improvements Project | $341,500 |
| Richmond | Richmond Logistics Hub Offsite Waterloop Feeder Loop Project | $5,536,000 |
| Richmond | Richmond Office Seismic Upgrade | $325,000 |
| Richmond | Lulu Waterworks Program | $2,063,000 |
| Richmond | Sewer. Forcemain and Pump Station Essential Service Replacement Addition | $1,349,667 |
| Richmond | Knight Street Bridge Seismic Upgrade | $1,045,000 |
| Ridley Island | Ridley Island Culvert Replacement | $250,000 |
| Rossland | Centre Star Gulch Trail | $10,212 |
| Saanich | David Foster Arts Centre | $1,333,000 |
| Saanich | Boulders Climbing Gym Expansion | $684,000 |
| Saanich | Galloping Goose Regional Trail Section Upgrade | $137,693 |
| Saanich | Bowker Creek Greenway - Phase 1 | $117,500 |
| Saanichton | Central Saanich East Saanich Road Renewal | $2,333,333 |
| Salmo | Road Upgrading Project | $150,475 |
| Salmo | Carney Mill Bridge | * |
| Salmon Arm | Sorrento Water System Treatment Improvements | $714,666 |
| Salmon Arm | Falkland Water System Improvements - Phase 1 | $450,666 |
| Salmon Arm | Roadway Infrastructure Renewal | $833,333 |
| Salt Spring Island | New Library Building | $2,275,492 |
| Sayward | Highway 19 (Island Hwy): Sayward area Resurfacing - south and north of Sayward | $1,845,000 |
| Sayward | Kelsey Centre HVAC Rehabilitation and Emergency Generator | $102,787 |
| Sayward | Storm Water Management and Sewer System Rehabilitation | $76,667 |
| Sechelt | Sewer Trunk Line Expansion - Trail Avenue | $251,770 |
| Sechelt | Bio-Solids Treatment Facility | $1,600,000 |
| Sechelt | East Porpoise Bay Road Upgrade | $179,458 |
| Sechelt | Highway 101 - Sechelt Improvements | $1,250,000 |
| Sechelt | Meadow Creek Culvert | * |
| Sicamous | Sewer Collection | $3,045,433 |
| Sicamous | Mara Water System Extension to CPR Hill | $161,667 |
| Sidney | Fifth Street Sewer Lift Station Decommissioning | $88,333 |
| Sidney | Iroquois Community Park Improvement Project | $752,802 |
| Sidney | Sidney - Lochside Waterfront Trail | $375,000 |
| Skeena Queen Charlotte | Sandspit Recreation / Community Hall | $186,667 |
| Skidegate | Sewage Pump Ashore | $453,337 |
| Smithers | Smithers South Trunk Storm Sewer Project | $800,000 |
| Smithers | Toronto Street to Queen Street Perimeter Trail Connector | $18,000 |
| Smithers | Riverside Campground and Ranger Park Trail Improvements | $166,667 |
| Sooke | District of Sooke Waterfront Recreation Area | $302,884 |
| Sooke | Arena Upgrade and Addition | $400,000 |
| South Shore | South Shore Water and Sewer Improvements | $387,500 |
| Spallumcheen | Otter Lake Cross Road Upgrade | $961,930 |
| Sparwood | Link Trail and CPR Overpass to Elk River Pedestrian Bridge | $50,970 |
| Sparwood | Highway 3: Loop Bridge & CPR Overhead | * |
| Squamish | Boulevard Pump Station | $475,000 |
| Squamish | Government Road Trunk Sewer Main | $676,983 |
| Squamish | Squamish Dyke Riprap | $141,666 |
| Squamish | O'Siem Community Pavilion | $166,667 |
| Summerland | Prairie Valley Road / Rosedale Avenue Improvement | $1,500,000 |
| Summerland/Osoyoos | Highway 97: Lakeshore Drive to Bentley Road and from U.S. border to Highway 3 south of Osoyoos | $1,350,000 |
| Sunshine Coast | South Pender Harbour Water Treatment Plant | $2,030,000 |
| Sunshine Coast | Granthams Landing Water System Upgrade | $168,667 |
| Surrey | Construct cycling/pedestrian overpass and bicycle paths | $3,583,333 |
| Surrey | Replacement of the Sewer System in the Bridgeview area | $2,833,333 |
| Surrey | City Centre Library | $10,000,000 |
| Surrey | Surrey Maintenance Facility | $2,500,000 |
| Surrey | Highway 99 South Surrey Cable Barrier | $1,250,000 |
| Surrey | Improvements to a section of 96th Avenue between 152nd to160th Streets. and 168th to 176th Streets | $8,000,000 |
| Surrey/Delta | Highway 99 Rapid Bus Northbound King George Highway to Highway 91 | $6,500,000 |
| Swartz Bay | Waste Water Treatment | $1,800,000 |
| Tahsis | Road Re-Construction | $176,000 |
| Taylor | Local Roads Rehabilitation | $1,185,333 |
| Taylor | Sewage Treatment Plant Upgrade | $183,333 |
| Telkwa | Highway 16 Watermain Replacement Phase 1 | $200,000 |
| Terrace | Skeena Industrial Development Park Intersection and Access Road | $668,587 |
| Terrace | South Hazelton - Water Treatment Component | $567,767 |
| Terrace | Grand Trunk Pathway: Downtown Gateway Project - Phase 2 | $47,112 |
| Terrace | Frank Street Well Emergency Generator | $149,143 |
| Thompson Nicola | Water System Improvements | $181,462 |
| Thompson-Nicola | Pritchard (Laveau Rd) Community Water System Upgrade | $172,364 |
| Thompson-Nicola | Rural & Small Municipality Eco-Depot Waste Disposal Project | $4,736,339 |
| Thompson-Nicola | Walhachin Community Water System Upgrade | $241,666 |
| Tofino | Lynn Road and Osprey Lane Proposed Roundabout | $102,000 |
| Tofino and Port Alberni | Highway 4: Tofino to Port Alberni | * |
| Tsawwassen | Tsawwassen Industrial Lands Site Servicing Project - Phase 1 | $3,012,333 |
| Tsawwassen | Tsawwassen - Berth 3/4 Transfer Deck - Full Seismic Upgrade | $1,400,000 |
| Tsawwassen | Tsawwassen - Terminal Maintenance & Test Kitchen Roof Replacements | $36,500 |
| Tsawwassen | Tsawwassen Terminal - Sewage Pump Ashore | $2,480,988 |
| Tumbler Ridge | Community Centre Building Envelope Upgrade | $200,000 |
| Ucluelet | Kennedy Lake area - Correction to surface deformation and resurfacing | $1,100,000 |
| Ucluelet | Trail Expansion | $31,667 |
| Valemount | Sewer Lift Station Enhancements | $55,000 |
| Valemount | Water Main Upgrades | $87,267 |
| Vancouver | Main Street Station upgrade | $8,300,000 |
| Vancouver | Evergreen Transit Line | $350,000,000 |
| Vancouver | Expo Line Station Expansion | $18,300,000 |
| Vancouver | West Coast Express Commuter Rail Improvements | $9,019,000 |
| Vancouver | Scott Road Station upgrade | $1,700,000 |
| Vancouver | Science World British Columbia | $10,500,000 |
| Vancouver | Advanced Light Rail Transit (ALRT) Network Upgrade | $400,000 |
| Vancouver | Sidewalk replacement Pedestrian collector routes | $1,666,700 |
| Vancouver | Upgrades to the Police Property Office and Forensic Storage Facility | $10,000,000 |
| Vancouver | Lynn Creek Rail Bridge Addition Port Metro Vancouver. North Vancouver. North Shore Trade Area | $10,500,000 |
| Vancouver | North shore Lynnterm Seismic Upgrade | $263,000 |
| Vancouver | Port Metro Vancouver Fusion Centre | $1,356,993 |
| Vancouver | North shore Access road to Vancouver Drydock | $60,000 |
| Vancouver | Green Necklace Greenway: Keith Road Connections | $350,000 |
| Vancouver | Marine Drive Corridor Improvement | $443,334 |
| Vancouver | Ambleside Sewer Rehabilitation Project | $825,600 |
| Vancouver | Fibre Optic Upgrade (Expo Line) | $1,900,000 |
| Vancouver | Metrotown Station (Expo Line) | $11,600,000 |
| Vancouver | ALRT Security (Faregates) | $30,000,000 |
| Vancouver | ALRT Rolling Stock | $24,800,000 |
| Vancouver | Renovations to Lubavitchs community centre | $633,333 |
| Vancouver | Upgrades to the Multicultural Helping House Society building | $500,000 |
| Vancouver | Development of the Vancouver Healing Lodge and Aboriginal Artist Shelter | $3,500,000 |
| Vancouver | Canada Place Roof Replacement | $21,000,000 |
| Vancouver | Klemtu Ferry Terminal | $12,500,000 |
| Vancouver | New Visitors Centre at VanDusen Botanical Garden | $6,400,000 |
| Vancouver | Arterial street rehabilitation 41st Avenue. Cambie to Kingsway | $2,000,000 |
| Vancouver | Road repaving - Queen Elizabeth Park | $333,333 |
| Vancouver | Grandview Viaduct Rehabilitation Phase I (Bearing & Joints) | $666,700 |
| Vancouver | Disability Access to streets & sidewalks: Curb ramps | $666,700 |
| Vancouver | Contracted Distribution Main Replacement - #1 (Kerrisdale & Fraserview) | $833,300 |
| Vancouver | Contracted Distribution Main Replacement - #2 (Kerrisdale & Fraserview) | $1,666,700 |
| Vancouver | Upper Trout Lake West Sewer Separation | $3,333,300 |
| Vancouver | Pressure Reducing Valve Station Replacement | $666,700 |
| Vancouver | Sewers upgrading: Greening of the English Bay Interceptor | $1,666,700 |
| Vancouver | Neighbourhood Energy Utility ("NEU") - Distribution System Extension | $700,000 |
| Vancouver | Roundhouse Community Centre Turntable Plaza | $600,000 |
| Vancouver | Carnegie Centre: Facility Rehabilitation and Upgrading Program | $1,333,300 |
| Vancouver | Vancouver City Hall: Heritage Exterior Rehabilitation Project | $966,700 |
| Vancouver | Orpheum Theatre: Renovation and Interface with New Amenity Space | $1,000,000 |
| Vancouver | Queen Elizabeth Theatre Plaza Improvements | $1,686,700 |
| Vancouver | Vancouver Landfill: Pump Station Upgrades | $466,700 |
| Vancouver | Vancouver Landfill: Water Line Extension | $333,300 |
| Vancouver | English Bay Seawall Improvements: English Bay to Sunset Beach | $1,000,000 |
| Vancouver | Parks Lighting Infrastructure/ Field Houses | $700,000 |
| Vancouver | Stanley Park Road Repaving: Sections of Park Drive and Pipeline Road | $1,500,000 |
| Vancouver | Stanley Park Seawall / Brockton Point Light House Rehabilitation | $2,000,000 |
| Vancouver | Stanley Park: Sewer Pump Station Upgrades | $500,000 |
| Vancouver | Stanley Park: Malkin Bowl Performance Centre Upgrade | $300,000 |
| Vancouver | Stanley Park: Pavilion and Fieldhouse Upgrade | $250,000 |
| Vancouver | Relocation of the City of Vancouver's Main Street Police Station | $5,000,000 |
| Vancouver | Heatley Street link to Centerm Shed | $500,000 |
| Vancouver | Annacis Island Parkway Pavement Renewal | $615,000 |
| Vancouver | Upgrades and expansion of the Vancouver Aquarium | $15,000,000 |
| Vancouver Island | Pacific Rim National Park - Replace sewer and water systems at Long Beach Day Use Area and Greenpoint Campground | $1,870,000 |
| Vancouver Island | Pacific Rim National Park - Replace entry ramp and recapitalize roof at Wickaninnish Visitor Centre | $792,000 |
| Vancouver Island | Pacific Rim National Park - Replace bridges and boardwalk along a section of West Coast Trail | $660,000 |
| Vanderhoof | 4th Street Improvement Program | $1,759,933 |
| Vanderhoof | Ice Arena Energy Efficiency Retrofit | $133,333 |
| Vanderhoof | Highway 16 - Holy Cross Hill Climbing Lane | $1,500,000 |
| Various | Flood mitigation initiatives | * |
| Various | Spirit of 2010 Trail | $1,000,000 |
| Vernon | 34 Street Improvements | $1,048,915 |
| Vernon | Sidewalks and Pathway Project | $266,906 |
| Vernon | Vernon Transit Maintenance Facility | $3,300,000 |
| Vernon | Highway 97 - 15th Ave to 43rd Ave and 27th Ave to Pleasant Valley Rd | $1,150,000 |
| Victoria | North Pender Island - Magic Lake Estates Water System Upgrade | $2,625,000 |
| Victoria | BC - HVAC Upgrade to First peoples Gallery Royal BC Museum | $1,350,000 |
| Victoria | Steel Watermain Rehabilitation - Stage 2 | $1,673,000 |
| Victoria | Replacement of the Johnson Street Bridge | $21,000,000 |
| Victoria | Ogden Point Deep Sea Terminal pier expansion (Victoria) | $900,000 |
| Victoria | CPR Steamship Terminal Upgrades | $1,500,000 |
| Victoria | Fisgard Lighthouse National Historical Site - Improve visitor experience and green park facilities | $500,000 |
| Wasa | Highway 93 - Jct. Highway 3 to Wasa | $1,575,000 |
| West Kelowna | Gellatly Bay Recreation Corridor Improvements | $85,000 |
| West Kelowna | Sewer Services Extension Phase 2 | $2,550,000 |
| West Kootenay | West Kootenay Arrow Zone Base | $914,000 |
| West Vancouver | Montizambert Creek Water Treatment Project | $871,700 |
| West Vancouver | West Vancouver Artificial Turf Field | $1,500,000 |
| West Vancouver | Spirit Trail Greenway | $245,251 |
| West Vancouver | Highway 1: Eagle Ridge underpass | $157,500 |
| West Vancouver | Highway 1: Horseshoe Bay underpass | $450,000 |
| West Vancouver | Highway 1: Squamish underpass | $275,000 |
| Westbridge | Westbridge Tower Access | $57,994 |
| Whistler | Valley Trail - Function Junction to Spring Creek | $187,500 |
| Whistler | Highway 99: Function Junction to Lorimer Road | $1,700,000 |
| White Rock | Construct Centre for Active Living | $1,080,530 |
| White Rock | White Rock Museum & Archives Revitalization Project | $458,667 |
| White Rock | White Rock - Pedestrian Improvements Initiative | $493,600 |
| White Rock | Sidewalk Improvement - Vine Avenue at Oxford Street | $24,591 |
| White Rock | Sidewalk Improvement - Vine Avenue at Hospital Street | $19,169 |
| Wihipsaw Creek | Highway 3 - Whipsaw Creek to Regional Boundary | $1,395,000 |
| Williams Lake | Horse Lake Water System | $359,182 |
| Williams Lake | Canim Lake Water System | $172,543 |
| Williams Lake | Williams Lake - Mackenzie Avenue Rehabilitation | $3,500,000 |
| Williams Lake | BC - Williams Lake Air Tanker Base | $704,500 |
| Williams Lake | Kiwanis Park Accessibile Playground Project | $70,000 |
| Williams Lake | Tourism Discovery Conference Centre Basement Renovation | $66,667 |
| Yahk and Cranbrook | Highway 3: Fort Steele and Yahk Bridges | * |
| Yale | Highway 1 (Trans Canada Highway). North of Yale Resurfacing | $1,710,000 |
| Yellow Lake | Highway 3A - Yellow Lake Safety Improvements | $3,000,000 |
| Zeballos | Answer Creek Culvert | * |