| Location | Project | Federal Contribution |
|---|
| Addington Highlands | Reconstruction of Matawatchan Road | $513,165 |
| Addington Highlands | Denbigh Roads Garage Addition | $43,685 |
| Adelaide Metcalfe | Kerwood Fire Hall | $200,000 |
| Adelaide Metcalfe | Cuddy Drive Reconstruction | $265,000 |
| Adjala - Tosorontio | Repair Everett Reservoir | $30,525 |
| Adjala - Tosorontio | Pave Sideroad 30 Adjala | $45,672 |
| Adjala - Tosorontio | Resurface Concession Road 7 | $79,101 |
| Admaston/Bromley | Admaston/Bromley Expansion | $104,000 |
| Ajax | Reconstruction of Fairall Street | $1,106,517 |
| Ajax | St. Francis de Sales Rehabilitation and Retrofit | $852,473 |
| Alberton | Alberton Fire Hall | $62,585 |
| Alfred and Plantagenet | Wendover Water Pollution Control Plant Upgrade | $2,190,558 |
| Alfred and Plantagenet | Bolt Road Rehabilitation | $380,990 |
| Alfred and Plantagenet | Boundary Road Rehabilitation | $296,466 |
| Algoma | Agawa River Bridge | $1,250,000 |
| Algoma | Thessalon River Bridge - Coating | $350,000 |
| Algoma Mills | Improvements to the Serpent River Water Distribution System | $169,373 |
| Algonquin Highlands | Expansion to the Township of Algonquin Highlands Airport | $1,263,167 |
| Algonquin Highlands | McClintock Sewage Lagoon Rehabilitation | $50,000 |
| Algonquin Highlands | Disaster Mitigation Program Generators | $75,000 |
| Alliston | Replacement of Concession Rd 7 Bridge | $588,500 |
| Alliston | Restoration of the Monument Building | $67,266 |
| Almonte | Construction of a Mechanical Sewage Treatment Plant and Upgrade of Pump Station | $9,355,518 |
| Alnwick/Haldimand | Replacement of Benlock Road Overflow Bridge | $175,000 |
| Alnwick/Haldimand | Centreton Library | $182,900 |
| Alnwick/Haldimand | Shelter Valley Road Rehabilitation | $343,333 |
| Alnwick/Haldimand | Upgrades to Alternate 401 Detour Route | $2,009,680 |
| Alvinston | Upgrades to the Wastewater Treatment Facility | $322,456 |
| Amaranth | Sand Storage Building | $86,711 |
| Amherstburg | The Construction of the Amherstburg Inclusive Multi-Use Recreation Complex | $7,866,888 |
| Amherstburg | Dalhousie Street Reconstruction | $666,666 |
| Amherstburg | Victoria Street Sewer Separation | $310,000 |
| Amherstburg | Fort Malden National Historic Site -Conservation of cultural resources | $253,000 |
| Amherstburg | Fort Malden National Historic Site - Enhancement of exhibits and signage | $99,000 |
| Ancaster | Construction of a second ice surface within the Morgan Firestone Arena of the Ancaster Rotary Centre | $3,425,000 |
| Armour | Armour Office Modification & Renewal | $26,664 |
| Armour | Armour Commercial Drive intersection Modification and Renewal | $210,000 |
| Armour | TRI R Site Improvements | $50,000 |
| Armstrong | Improvements to Community Roads | $27,000 |
| Armstrong | Upgrade of Airport Building | $16,210 |
| Arnprior | Rehabilitation of Poole Street | $260,000 |
| Arnprior | Taxiway Reconstruction | $33,333 |
| Arnprior | Arnprior Library Expansion | $225,000 |
| Arnprior | Upgrade of the Water Pollution Control Centre | $5,330,000 |
| Arran-Elderslie | Ross Street Watermain. Paisley | $263,750 |
| Arran-Elderslie | Replacement of Existing Tara Water Standpipe | $526,740 |
| Ashfield - Colborne - Wawanosh | Lucknow & District Firehall | $375,000 |
| Asphodel-Norwood | Public Works Facility | $576,667 |
| Asphodel-Norwood | Reconstruction of King Street | $1,145,260 |
| Assiginack | Manitowaning Arena Community Centre Facelift | $342,000 |
| Athens | Athens Town Hall Rehabilitation | $65,000 |
| Atikokan | Rehabilitation of the Atikokan Municipal Airport | $815,562 |
| Atikokan | Municipal Civic Centre | $106,104 |
| Atikokan | Dunbar Heights Sidewalk Rehabilitation | $46,154 |
| Atikokan | Rehabilitation of Main Street in Atikokan | $904,374 |
| Augusta | Maynard Waste Disposal Site Rehabilitation | $200,000 |
| Augusta | Algonquin Maintenance Garage Revitalization | $150,000 |
| Augusta | Reconstruction of Concession #2 in Prescott | $814,815 |
| Aurora | Rehabilitation of the Sanitary Sewer Collection System | $1,580,000 |
| Aurora | Park Development | $83,333 |
| Aurora | Energy Management and Building System Retro-fits | $246,800 |
| Aurora | Construction of Trail Network | $108,333 |
| Aurora | Sheppard's Bush Residence Rehabilitation | $127,500 |
| Aylmer | Construction of the Malahide Comunity Place | $678,536 |
| Aylmer | Improvements to the Fourth Avenue Sewer | $274,500 |
| Aylmer | Town Hall Basement Retrofit | $78,000 |
| Aylmer | Sanitary Sewers Crossings Reconstruction | $166,665 |
| Baden | The Expansion of the Wilmot Recreation Complex | $3,016,110 |
| Baldwin | Hardwood Road Rehabilitation | $150,000 |
| Baldwin | Baldwin Landfill Closure | $70,667 |
| Baldwin | Construction of the Baldwin Recreation Building | $83,117 |
| Ballantyne and Part Laurier | Rehabilitation of Chemical Road in Trout Creek | $382,500 |
| Balmertown | Replacement of Airport Terminal Building | $1,437,233 |
| Bancroft | Construction of the Faraday Landfill Leachate Management System | $778,264 |
| Bancroft | Faraday Heights | $616,477 |
| Barrie | Barrie Fire and Emergency Services Station #1 and Headquarters | $4,260,000 |
| Barrie | Watermain construction on Salem Road from Veterans Drive to Saunders Road | $506,400 |
| Barrie | Watermain construction on Anne Street. Cundles Road. Kozlov Street and Heather Street | $992,700 |
| Barrie | Operations Centre Site Works and Stormwater Management Pond | $1,728,000 |
| Barrie | Infrstructure improvements on Boys Street and Donald Street. including Bunkers Creek and Kidd’s Creek culverts. | $1,166,700 |
| Barrie | Road. drainage and other infrastructure improvements on Toronto Street. Dunlop Street. and Mary Street | $3,281,400 |
| Barrie | Lake Simcoe Regional Airport Upgrades and Expansion | $4,596,000 |
| Barrie | New Path Foundation - Orillia Common Roof | $1,270,620 |
| Barrie | Highway 400 - St. Vincent Bridge | $1,500,000 |
| Barrie | Highway 400 - Innisville Creek Bridge | $250,000 |
| Barry's Bay | Upgrading the Barry's Bay Wastewater Treatment Plant | $1,338,333 |
| Bayham | Carson Line Bridge | $32,400 |
| Beamsville | Improvements to Prince William Street | $366,667 |
| Beauchamp | Airport Road | $19,800 |
| Beauchamp | McLean Road Upgrade | $13,200 |
| Beckwith | Lake Park Road Reconstruction | $300,178 |
| Beckwith | Beckwith Township and Carleton Place Joint Trail Development Project | $480,667 |
| Belle Vallee | Construction of a Multi-use Building | $128,333 |
| Belleville | Rehabilitation of the Sanitary and Storm Sewer | $1,543,967 |
| Belleville | Dundas Street West CPR Overpass Rehabilitation (Priority Three) | $666,667 |
| Belleville | Expansion of the Belleville Recreation & Community Centre | $11,666,667 |
| Belleville | Habitat for Humanity - Construction of a 13000 to 15000 Sq ft building to accommodate the centre. Charity's offices and prep space | $366,667 |
| Bigstone Bay | Hard Surfacing Bigstone Bay Road | $31,185 |
| Billings | Bridal Veil Falls and Kagawong River Valley Project | $7,177 |
| Billings | New Windows Old Mill | $29,150 |
| Billings | Renewal of the Park Centre in Kagawong | $69,015 |
| Black River - Matheson | Rehabilitation of Municipal Wells | $20,200 |
| Blind River | Replacement of Potomac River Bridge | $215,150 |
| Blind River | Public Works Complex | $743,333 |
| Blind River | Reconstruction of West Street & Improvements to Drainage | $345,817 |
| Bluewater | Renovation of the West Huron Community Centre | $345,923 |
| Bonfield | Trunk Road Reconstruction | $316,517 |
| Bonnechere Valley | Lake Clear Road Stabilization | $210,100 |
| Bonnechere Valley | Alice Street Rehabilitation | $275,000 |
| Bonnechere Valley | Upgrade of the Eganville Wastewater System | $356,500 |
| Bowmanville | Rehabilitation of Concession Road 7/8 | $1,590,000 |
| Bowmanville | Darlington Day Use Improvements | $175,000 |
| Bracebridge | Replacement of Port Carling Wastewater Treatment Plant | $4,401,667 |
| Bracebridge | Construction of the Bracebridge SkatePark | $136,667 |
| Bradford | Construction of the Bradford West Gwillimbury Sports and Leisure Centre | $8,241,666 |
| Bradford West Gwillimbury | 8th Line / Dissette Reconstruction | $1,972,000 |
| Bradford West Gwillimbury | Colborne Street Reconstruction | $540,334 |
| Bradford West Gwillimbury | Construction of the Bradford West Gwillimbury Library and Cultural Centre in Bradford | $3,675,000 |
| Bradford West Gwillimbury | Highway 400- Regional Road 88. Bradford | $200,000 |
| Brampton | Mount Pleasant Village Mobility Hub | $7,666,667 |
| Brampton | Chinguacousy Park | $8,164,000 |
| Brampton | St. Leonard's Place Intake and Assessment Wing | $833,000 |
| Brampton | Construction of a new social services centre | $5,000,000 |
| Brant | County Road 16 Rehabilitation | $2,100,000 |
| Brantford | Expansion of Wayne Gretzky Sports Centre | $3,000,000 |
| Brantford | Construction of Wayne Gretsky Centre Four-Pad Arena | $12,960,782 |
| Brechin | Rehabilitation of Airport Road | $255,683 |
| Brethour | Jacques Bridge Project | $126,667 |
| Bridgenorth | Construction of the Lakefield Elevated Storage Tank | $1,846,500 |
| Brighton | Reconstruction of Drewery Street | $376,742 |
| Brighton | Presqu'ile Picnic Shelter | $50,000 |
| Britt | Improvement Study for Wastewater Treatment | $22,500 |
| Britt | Klondyke Road | $16,667 |
| Brock | Culvert 340 Replacement | $116,667 |
| Brockville | Construction of the Maritime Discovery Centre of the 1000 Islands (MDC) | $5,694,492 |
| Brockville | Construction of Pinehill Road Roundabout | $200,417 |
| Brockville | Jessie St./George St. Sewer Seperation | $500,000 |
| Brockville | Rehabilitation of the Memorial Complex | $141,667 |
| Brooke-Alvinston | Churchill Line Rehabilitation | $75,000 |
| Brooke-Alvinston | Administration Community Centre Accessiblity | $86,167 |
| Bruce | West Road | $700,000 |
| Bruce | Bruce County Road 17 | $450,000 |
| Bruce | Forrester's Bridge | $164,000 |
| Bruce Mines | Rehabilitation of the Downtown Highway Corridor in Bruce Mines | $399,989 |
| Bruce Peninsula | Bruce Peninsula National Park & Fathom Five NMCA - Recapitalization of visitor day use and access facilities | $1,685,000 |
| Brudenell. Lyndoch and Raglan | Upgrade to Raglan Recreation Centre | $237,549 |
| Brudenell. Lyndoch and Raglan | Upgrade to Letterkenny Road | $120,000 |
| Brussels | Reconstruction of Lower Town Wingham Street | $247,900 |
| Bryce Township | Extension of RR2 in Englehart | $30,870 |
| Burford | Construction of a Community Centre | $7,124,894 |
| Burk's Falls | Replacement of Leggetts Bridge | $833,333 |
| Burlington | Burlington Performing Arts Centre | $1,500,000 |
| Burlington | Corporate-Wide Building Automation System | $500,000 |
| Burlington | Freeman Station Installation | $333,333 |
| Burlington | New Fire Station in NE Burlington | $750,000 |
| Burlington | Accessibility Bridge | $500,000 |
| Burlington | Centennial Bike Path Resurfacing | $833,333 |
| Burlington | Hydro Corridor Bike Path Resurfacing | $600,000 |
| Burlington | Transit Operations Centre Renewal/Expansion Project | $2,866,667 |
| Burlington | New City Park | $2,300,000 |
| Burpee and Mills | Municipal Complex Improvements | $8,791 |
| Caledon | Replacement of Heart Lake Road Bridge | $256,750 |
| Callander | Standyby Power Generation | $100,000 |
| Callander | Rehabilitation of the Hart Road Bridge | $114,333 |
| Calvin | Landfill Site Expansion Project | $26,400 |
| Cambridge | Rehabilitation of Shellard Road Bridge | $133,733 |
| Cambridge | Cambridge Performing Arts Complex | $6,000,000 |
| Cambridge | Municipal Buildings Rehabilitation | $5,000,000 |
| Cambridge | Preston Auditorium Rehabilitation | $800,000 |
| Cambridge | Public Works Building Rehabilitation | $1,400,000 |
| Cambridge | Cambridge Road Rehabilitation Program | $4,166,667 |
| Cambridge | Rehabilitation & Renewal of the Chaplin Family YMCA | $343,333 |
| Cannington | Reconstruction of Victoria Avenue. Beaverton | $372,322 |
| Carleton Place | Improvements to the Wastewater Pollution Control Plant | $446,990 |
| Carleton Place | Construction of an Outdoor Lit Artificial Turf | $429,733 |
| Carleton Place | Road Rehabilitation | $716,667 |
| Carleton Place | Upgrade of the Carleton Place Water Treatment Plant | $500,217 |
| Carleton Place | Lanark Community Programs - Bennett Street Site Development | $550,000 |
| Carling | East & West Carling Bay Road/Bayview Drive Improvements | $776,585 |
| Carlow/Mayo | Renovations to Community/Evacuation Centre | $100,000 |
| Carp | Diefenbunker. Canada's Cold War Museum - Building Capacity Project | $106,000 |
| Casey | Sand/Salt Storage Facility | $63,360 |
| Casselman | Constructing New Sewage Collection System for Forest Park Community | $978,508 |
| Casselman | Improvements to the Casselman Water Works | $180,333 |
| Cavan Monaghan | Construction of the Fraserville Water and Sewer Systems | $9,800,088 |
| Cayuga | Improvements to the Hagersville Wastewater Treatment Plant | $3,077,381 |
| Central Elgin | Port Stanley Watermain Project | $159,333 |
| Central Elgin | Elmwood Avenue Bailey Avenue Sanitary Servicing | $443,935 |
| Central Frontenac | Office Extension | $66,666 |
| Central Frontenac | Road Upgrade and Construction Project | $789,132 |
| Central Frontenac | Salt Storage Expansion Project | $116,667 |
| Central Frontenac | Revitalization of the Playground at Oso Beach | $16,950 |
| Central Huron | Fire Hall | $435,000 |
| Central Huron | Orchard Line Road Repaving Project | $420,000 |
| Central Manitoulin | Improvement to the Providence Bay Arena in Central Manitoulin | $85,813 |
| Centre Hastings | Reconstruction of Springbrook Road West of Highway 62 | $306,667 |
| Centre Hastings | Centre Hastings Municipal Office and Council Chambers | $315,000 |
| Centre Wellington | Reconstruction of Church Street (Elora) | $443,333 |
| Centre Wellington | Reconstruction of Sideroad 19. Burnett Court and Victoria Crescent | $1,800,000 |
| Centreville | Reconstruction of Frizzell Road | $1,044,163 |
| Chamberlain | Public Works Garage | $100,000 |
| Champlain | Pleasant Corner Road Reconstruction | $58,333 |
| Champlain | Vankleek Hill Arena Elevator Replacement | $66,667 |
| Champlain | Improvements to the Vankleek Hill Lagoon Sewage Treatment Plant | $269,167 |
| Chapleau | Reconstruction of Monk Street | $607,777 |
| Chapleau | Lisgar St. Bridge Improvements | $45,000 |
| Chatham | YMCA of Chatham-Kent Facility Renewal Project | $4,424,638 |
| Chatham | Chatham Kent Women's Centre Expansion Project | $322,475 |
| Chatham - Kent | Coutts Line Bridge over Baptiste Creek - 4681950N | $400,000 |
| Chatham - Kent | Coutts Line Bridge over Government Drain 1 - 4686559N | $750,000 |
| Chatham - Kent | Princess Street Bridge over McGregor Creek - 4695656N | $1,083,333 |
| Chatham - Kent | LP - Sixth Line Bridge over Raleigh Plains Drain - 4688184N | $1,200,000 |
| Chatham - Kent | Base Line Bridge over Little Bear Creek East - 4713726N | $1,000,000 |
| Chatham - Kent | Sydenham River Bridge on Langstaff Line - 4719274N | $800,000 |
| Chatham - Kent | King St Sanitary Sewer Relining Project | $1,666,667 |
| Chatham - Kent | Sanitary Sewer Rehabilitation - Community of Wallaceburg - T05-152 | $533,333 |
| Chatham - Kent | Sanitary Sewer Rehabilitation - Community of Wallaceburg - T07-153 | $1,166,667 |
| Chatham - Kent | Sanitary Sewer Rehabilitation - Community of Tilbury - T07-152 | $400,000 |
| Chatham - Kent | Sanitary Sewer Rehabilitation - Community of Chatham - T07-147 | $666,667 |
| Chatham - Kent | Sanitary Sewer Rehabilitation - Community of Chatham - T08-147 | $666,667 |
| Chatham - Kent | Van Allen Street Sanitary Sewer Separation Project | $1,666,667 |
| Chatham - Kent | Robertson Outfall Sanitary Sewer Separation Project | $3,833,333 |
| Chatham - Kent | Dresden Storm Sewers | $1,000,000 |
| Chatham-Kent | Hwy 401 - Essex Rd 42 IC 56 to Bloomfield Rd East Bound lanes | $2,450,000 |
| Chatsworth | Replacement of Gamble Bridge and Reconstruction of Sideroad 1 | $395,370 |
| Chatsworth | Concession 6 | $140,000 |
| Chatsworth | Williamsford Community Centre Rehabilitation | $250,000 |
| Chatsworth | Chatsworth Road 24 | $166,666 |
| Chiniguchi River | Chiniguchi River road re-surfacing project | $112,500 |
| Chisholm | Municipal Fire Hall Upgrade | $30,000 |
| Chisholm | Landfill Site Groundwater Monitoring Wells | $18,033 |
| Chute-a-Blondeau | Voyageur Park Infrastructure | $100,000 |
| Clarence-Rockland | Water Supply - Phase 2 | $8,912,563 |
| Clarence-Rockland | Sporting Event and Training Centre | $6,800,000 |
| Clarington | Concession Road 6 Pavement Rehabilitation – Old Scugog Road to Acres Road | $826,667 |
| Clarington | Energy Retrofit of the Garnet B. Rickard Complex | $425,000 |
| Clarington | Highway 35 - Wilmot Creek Bridge | $250,000 |
| Clearview | Stayner to Collingwood Trail Link | $66,667 |
| Clearwater Lake | Clearwater Lake Erosion Control | $9,900 |
| Clearwater Lake | Upgrading of Burditt Lake Road | $9,900 |
| Clinton | Extension of Wastewater and Road Services to Clinton area | $453,661 |
| Cloyne | Bon Echo Shelters | $45,000 |
| Cobalt | Teck-Cominco Prospect Park Upgrades | $25,000 |
| Cobalt | Energy Retrofit Municipal Buildings | $31,666 |
| Cobden | Cobden Combined Flow Reduction Program | $178,945 |
| Cobourg | Rehabilitation of Rice Lake Drive | $1,000,000 |
| Cobourg | Construction of a Teritary Filtration Unit at WPCP No. 1 | $483,333 |
| Cobourg | Rehabilitation of Factory Creek Bridge | $372,123 |
| Cobourg | Cobourg Multi-Use Community Centre (CCC) | $9,133,333 |
| Cobourg | D'Arcy Street Reconstruction | $1,050,000 |
| Cochrane | Replacement of Watermains and Storm Sewer Upgrades on Fifth Street West | $1,100,000 |
| Cochrane | Genier Road Resurfacing | $1,187,600 |
| Cochrane | Ferguson Subdivision | $150,000 |
| Cochrane | Rehabilitation of 8th Street & Chalmers Avenue in Cochrane | $1,845,040 |
| Colborne | Upgrade of the Colborne Wastewater Treatment Plant | $2,125,086 |
| Coleman | Replacement of the Coleman Township Water Distribution System | $1,812,025 |
| Coleman Township | Replacement of Watermains | $1,342,241 |
| Collingwood | Improvements to the Regional Airport | $441,000 |
| Collingwood | Downtown Collingwood Infrastructure Rehabilitation and Economic Revitalization | $2,000,000 |
| Collingwood | NEC Craigleith Park Visitor Infrastructure Renewal | $53,500 |
| Conmee | Handicapped Access | $50,000 |
| Corbeil | Improvements to the East Ferris Community Centre | $1,166,766 |
| Corkhill and Brewster | Liskeard Lumber Road (Unincorporated Townships of Corkhill and Brewster) | $140,000 |
| Cornwall | Constructing Salt Storage Facilities | $1,850,000 |
| Cornwall | Construction of a Watermain onTollgate Road | $285,000 |
| Cornwall | New Emergency Medical Services Headquarters Building | $1,700,000 |
| Cornwall | Brookdale Avenue Water Main | $700,000 |
| Cornwall | Construction of the Cornwall Multi Sport Facility | $9,221,465 |
| Cornwall | Upgrades to WastewaterTreatment | $18,500,000 |
| Cramahe | Durham St Reconstruction | $116,666 |
| Cramahe | Highway 401 - Herley Rd. Underpass. Colborne (Site #21-294) | $750,000 |
| Dawn - Euphemia | Lambton Line-Dawn Valley Watermain | $274,000 |
| Dawson | Pinewood Fire Hall Addition | $47,667 |
| Dawson | Atwood Road #2 Upgrade | $29,333 |
| Dawson | Upgrade of River Road | $33,000 |
| Dawson | Construction of Meldrum Bay Waterfront Exhibit Centre | $177,847 |
| Deep River | Ridge Road Reconstruction | $1,310,000 |
| Delta | Rehabilitation of Golf Club Road | $133,333 |
| Desbarats | Replacement of Gordon Lake Road Bridge | $120,000 |
| Desbarats | Improvements to Government Road and MacLennan Road | $119,093 |
| Deseronto | Improvements to the Deseronto Wastewater Treatment System | $1,500,000 |
| Deseronto | Renovation of the Deseronto Community Centre | $675,000 |
| Devon Landing | Rehabilitation of the Devon Road | $87,750 |
| Dorchester | Improvements to Wastewater Servicing in Thorndale | $2,951,666 |
| Douro - Dummer | Warsaw Community Centre | $50,000 |
| Douro - Dummer | Municipal Building Addition | $366,666 |
| Drayton | Upgrading Wastewater Treatment Plant | $558,466 |
| Dresden | Improvements to the Florence Community Centre | $559,333 |
| Drummond - North Elmsley | Drummond Conc 1A | $364,273 |
| Drummond - North Elmsley | Prestonvale Road Rehabilitation | $472,764 |
| Drummond - North Elmsley | Churchill Road Rehabilitation | $396,786 |
| Drummond-North Elmsley | Improvement to Ebb's Bay Road in Drummond-North Elmsley Township | $500,336 |
| Dryden | Upgrade of the Dryden Sewage Treatment Plant | $9,966,666 |
| Dryden | Water Meter Implementation | $600,000 |
| Dubreuilville | Re-Alignment of the Intersection of Rue De L'Eglise and Rue Des Pins | $85,000 |
| Dufferin | County Administration and Provincial Offences Court/Admin Addition | $2,700,000 |
| Dunchurch | Reconstruction of Bunny Trail Road | $463,061 |
| Dundalk | Rehabilitation of the Dundalk Water Supply System | $251,167 |
| Dundas | Dundas Valley School of Art | $2,450,000 |
| Dunnville | Rock Point Park Infrastructure | $255,000 |
| Durham | Rosebank Road Sanitary Sewerage Pumping Station | $1,833,333 |
| Durham | Road Rehabilitation of Highway 2 | $416,667 |
| Durham | Road Rehabilitation of Highway 47 | $1,666,667 |
| Durham | Road Rehabilitation of Road 5 (Ninth Concession) | $333,333 |
| Durham | Road Rehabilitation of Road 7 (Island Road) | $450,000 |
| Durham | Replacement of Polybutylene Service Connections (Love Crescent. Ajax. 45 houses) | $75,000 |
| Durham | Replacement of Polybutylene Service Connections (Garnett Drive. Ajax. 27 houses) | $45,000 |
| Durham | Replacement of Polybutylene Service Connections (Hawkins Crescent. Ajax. 75 houses) | $125,000 |
| Durham | Replacement of Polybutylene Service Connections (Hillings Drive. Ajax. 30 houses) | $50,000 |
| Durham | Replacement of Polybutylene Service Connections (Humphrey Drive. Ajax. 102 houses) | $170,000 |
| Durham | Replacement of Polybutylene Service Connections (Kipling Crescent. Ajax. 66 houses) | $110,000 |
| Durham | Replacement of Polybutylene Service Connections (Pittmann Crescent. Ajax. 105 houses) | $175,000 |
| Durham | Replacement of Polybutylene Service Connections (Danton Court. Ajax. 26 houses) | $43,333 |
| Durham | Replacement of Polybutylene Service Connections (Easton Court. Ajax. 30 houses) | $50,000 |
| Durham | Replacement of Polybutylene Service Connections (Cowan Crescent. Pickering. 59 houses) | $98,333 |
| Durham | Replacement of Polybutylene Service Connections (Greenfield Court. Whitby. 68 houses) | $113,333 |
| Durham | Replacement of Polybutylene Service Connections (Janedale Court. Whitby. 42 houses) | $70,000 |
| Durham | Replacement of Polybutylene Service Connections (Holden Court. Whitby. 12 houses) | $20,000 |
| Durham | Replacement of Polybutylene Service Connections (Kirby Court. Whitby. 99 houses) | $165,000 |
| Durham | Replacement of Polybutylene Service Connections (Winston Court. Whitby. 40 houses) | $66,667 |
| Durham | Replacement of Polybutylene Service Connections (Vanessa Place. Whitby. 57 houses) | $95,000 |
| Durham | Replacement of Polybutylene Service Connections (Mayflower Street. Whitby. 19 houses) | $31,667 |
| Durham | Replacement of Polybutylene Service Connections (Lowder Place. Whitby. 57 houses) | $95,000 |
| Durham | Replacement of Polybutylene Service Connections (Fieldview Crescent. Whitby. 35 houses) | $58,333 |
| Durham | Replacement of Polybutylene Service Connections (Elmeroy Court. Whitby. 30 houses) | $50,000 |
| Durham | Replacement of Polybutylene Service Connections (Sawdon Drive. Whitby. 21 houses) | $35,000 |
| Durham | Replacement of Polybutylene Service Connections (Bellwood Drive. Whitby. 20 houses) | $33,333 |
| Durham | Replacement of Polybutylene Service Connections (Roundelay Court. Oshawa. 97 houses) | $161,667 |
| Durham | Replacement of Polybutylene Service Connections (Sagebush Street. Oshawa. 44 houses) | $73,333 |
| Durham | Replacement of Polybutylene Service Connections (Overbank Drive. Oshawa. 137 houses) | $228,333 |
| Durham | Replacement of Polybutylene Service Connections (Lichen Crescent. Oshawa. 55 houses) | $91,667 |
| Durham | Replacement of Polybutylene Service Connections (Castlegrove Avenue. Oshawa. 23 houses) | $38,333 |
| Durham | Replacement of Polybutylene Service Connections (Adele Crescent. Oshawa. 42 houses) | $70,000 |
| Durham | Replacement of Polybutylene Service Connections (Homestead Court. Oshawa. 69 houses) | $115,000 |
| Durham | Replacement of Polybutylene Service Connections (Nevada Court. Oshawa. 9 houses) | $15,000 |
| Durham | Replacement of Polybutylene Service Connections (Elite Court. Oshawa. 28 houses) | $46,667 |
| Durham | Replacement of Polybutylene Service Connections (Barry Drive. Pickering. 21 houses) | $35,000 |
| Durham | Replacement of Polybutylene Service Connections (Edmund Drive. Pickering. 10 houses) | $16,667 |
| Durham | Replacement of Polybutylene Service Connections (Portland Court. Pickering. 41 houses) | $68,333 |
| Durham | Replacement of Polybutylene Service Connections (Sundown Crescent. Pickering. 52 houses) | $86,667 |
| Durham | Replacement of Polybutylene Service Connections (Cat Tail Court. Pickering. 26 houses) | $43,333 |
| Durham | Replacement of Polybutylene Service Connections (Steel Hill. Pickering. 37 houses) | $61,667 |
| Durham | Replacement of Polybutylene Service Connections (Lightfoot Place. Pickering. 48 houses) | $80,000 |
| Durham | Replacement of Polybutylene Service Connections (Sheppard Avenue. Pickering. 13 houses) | $21,667 |
| Durham | Replacement of Polybutylene Service Connections (Anthony Court. Pickering. 7 houses) | $11,667 |
| Durham | Replacement of Polybutylene Service Connections (Foster Court. Pickering. 14 houses) | $23,333 |
| Durham | Replacement of Polybutylene Service Connections (Houston Court. Pickering. 8 houses) | $15,000 |
| Durham | Replacement of Polybutylene Service Connections (Mooreland Court. Pickering. 77 houses) | $128,333 |
| Durham | Replacement of Polybutylene Service Connections (Rosebank Road. Pickering. 16 houses) | $26,667 |
| Durham | Replacement of Polybutylene Service Connections (Dalewood Drive. Pickering. 42 houses) | $70,000 |
| Durham | Replacement of Polybutylene Service Connections (Brookridge Gate. Pickering. 14 houses) | $23,333 |
| Durham | Road Rehabilitation of Church Street (Road 24) | $116,667 |
| Durham | Road Rehabilitation of Road 21 (Goodwood Road) | $166,667 |
| Durham | Road Rehabilitation of Road 60 (Wentworth Street) | $183,333 |
| Durham | Roadside Protection Improvements – Ajax (1 location) | $3,667 |
| Dutton | Replacement of Celtic Culvert | $164,000 |
| Dutton - Dunwich | Chalmers Line Culvert Replacement | $105,000 |
| Dutton - Dunwich | Improvements to Sewer System | $341,667 |
| Dysart et al | Blue Hawk Culvert Replacement Priority 2 | $266,666 |
| Dysart et al | West Guilford Community Centre Rehabilitation | $40,000 |
| Dysart et al | Haliburton Lake Road Rehabilitation | $124,492 |
| Ear Falls | Ear Falls Multiplex | $2,710,810 |
| Earlton | Resurface of Tenth Street | $219,775 |
| East Garafraxa | 10th Line Improvement Project | $224,586 |
| East Gwillimbury | Administration Building Renovation | $233,333 |
| East Gwillimbury | Boag Road Bridge | $250,000 |
| East Hawkesbury | New Community/Emergency Centre | $329,980 |
| East Hawkesbury | Concession 1 Road Reconstruction | $215,800 |
| East Zorra -Tavistock | 10th line road improvements | $221,778 |
| East Zorra -Tavistock | 16th line resurfacing | $697,968 |
| East Zorra -Tavistock | Rudy Subdivision reconstruction | $212,454 |
| East Zorra-Tavistock | Rehabilitation of Maplewood Sideroad & 15th Line in Tavistock | $510,866 |
| Eastern Ontario | Broadband network in Eastern Ontario | $55,000,000 |
| Eby-Grenfell | Beverly Street Improvement | $16,371 |
| Echo Bay | Restoration and Redirection of Disposal Site | $95,096 |
| Edwardsburgh/ Cardinal | Port of Prescott Grain Storage Expansion | $1,841,704 |
| Eganville | Upgrades to the Eganville Water Treatment Plant and Universal Water Meter Installation | $300,000 |
| Elgin | Calton Line Rehabilitation | $686,667 |
| Elizabethtown - Kitley | Kitley Line 2 Reconstruction | $66,666 |
| Elizabethtown-Kitley | Reconstruction of Second Concession in Elizabethtown-Kitley | $887,604 |
| Elk Lake | Replacement of the Makobe River Bridge | $191,000 |
| Elliot Lake | Hwy 108 Sanitary Sewer Line | $598,274 |
| Elliot Lake | Pearson Drive Water Main | $307,230 |
| Elmira | Replacement and Upgrading of the Water and Wastewater Services | $878,727 |
| Embrun | Expansion and Rehabilitation of the Russell Sewage System | $2,567,904 |
| Emo | Fisher Road Rebuild Project | $41,667 |
| Englehart | Rehabilitation of Wendigo Road | $184,840 |
| Englehart | Replacement of the Lagoon Lift Station Pump | $53,166 |
| Englehart | Improvements to Wawbewawa Road | $48,300 |
| Englehart | Englehart Trunk Sanitary Sewer & Watermain Improvements | $729,308 |
| Enniskillen | Shiloh Line Rehabilitation | $167,870 |
| Enniskillen | Marthaville Road Rehabilitation | $173,049 |
| Erin | Hillsburgh Street Rehabilitation | $286,667 |
| Erin | Deer Pit Storm Water Facility | $403,333 |
| Erin | Reconstruction of Sideroad 5 | $316,667 |
| Esher Como Healy | Esher Como Healy Road Upgrades | $67,500 |
| Espanola | Avery Drive Reconstruction and Forcemain Upgrade | $766,500 |
| Essa | Rehabilitation and repaving of various urban streets in Angus area | $114,322 |
| Essa | Replacement of the Angus Branch of the Essa Public Library in the Essa | $786,666 |
| Essex | Reconstruction of Dunn Road | $1,238,306 |
| Essex | CR 42 from CR 25 to CR 27 Pavement Rehabilitation | $409,172 |
| Essex | CR 25 from CR 42 to Hwy#401 Pavement Rehabilitation | $254,971 |
| Essex | CR 11 - CR 8 to Hwy # 3 Pavement Rehabilitation | $307,768 |
| Essex | CR 46 - CR 17 to 8th Conc. Pavement Rehabilitation | $288,207 |
| Essex | CR 23 from Hwy #3 to CR 27 and CR27 from Hwy#3 to CR23 Pavement Preservation | $396,177 |
| Essex | CR 43 Pavement Preservation | $62,500 |
| Essex | CR 42 Pavement Preservation | $793,097 |
| Essex | CR 2 Pavement Preservation | $410,213 |
| Essex | CR 8 Pavement Preservation | $185,850 |
| Essex | CR 14 Pavement Preservation | $340,507 |
| Essex | CR 18 Pavement Preservation | $206,717 |
| Essex | CR 21 Pavement Preservation | $111,653 |
| Essex | EMS Base - Leamington | $500,000 |
| Essex | CR 22 Improvement Program | $3,105,164 |
| Essex | CR 31/3rd Concession Intersection Improvement | $416,667 |
| Essex | CR 23 & CR 8 Intersection Improvement | $416,667 |
| Essex | East Side Arterial Road (Leamington) | $2,100,000 |
| Essex | McGregor Library and Community Centre | $600,000 |
| Essex | Construction of Harrrow Soccer Complex | $779,167 |
| Etobicoke | Renovations and retrofits at the Tibetan Canadian Cultural Centre’s main facility | $3,300,000 |
| Eton | Rehabilitation of Adam's Road in Eton | $51,165 |
| Evansville | Reconstruction of Campbell Road | $191,767 |
| Everett | Alliston District Humane Society New Shelter Project | $266,667 |
| Faraday | Faraday Landfill Capacity Reclamation including Leachate Collection System Extension | $123,837 |
| Fauquier - Strickland | Groundhog River Park | $42,376 |
| Fingal | Replacement of Oneida Bridge No. 6 | $81,333 |
| Flinton | Replacement of Wagers Bridge | $302,917 |
| Foleyet | Renovation to Office Building | $33,000 |
| Foleyet | Foleyet Community Hall Renovations | $16,417 |
| Foleyet | Rehabilitation of Finn Hill in Foleyet | $59,625 |
| Foleyet | Drinking Water System Improvements | $32,175 |
| Fonthill | Reconstruction of Pelham Street | $852,572 |
| Forest | Expansion and Upgrade of the Grand Bend Sewage Treatment Facility | $7,450,000 |
| Fort Erie | Construction of the North Crescent Park Storm Drainage System | $1,112,334 |
| Fort Erie | Ridge Road Infrastructure Improvements | $1,961,333 |
| Fort Frances | Replacement of Grit Removal Equipment at the Sewage Treatment Plant | $256,630 |
| Fort Frances | Rehabilitation & Resurfacing of the Kehl-Domanski Road Loop | $125,418 |
| Fort Frances | Upgrading of Japada Road | $27,061 |
| Fort Frances | Upgrading Highway 11 outside Fort Frances | $10,000 |
| Fort Frances | Biomass Road Reconstruction & Infrastructure Renewal ( Water & Sanitary Sewer) Project | $571,365 |
| Fort Frances | Construction of the Fort Frances Public Library and Technology Centre | $983,690 |
| Foster Truman #3254 | Improvements to Trufoster Road | $108,000 |
| Fowler | Upgrades to Gilbride Road | $112,500 |
| French River | Rehabilitation of Shaw Road | $500,000 |
| Front of Yonge | Reconstruction & Drainage Improvements – Ballycanoe & Escott-Yonge Townline Road | $134,466 |
| Front of Yonge | Road Resurfacing Program | $180,464 |
| Front of Yonge | Highway 401 - Donovan Creek Bridge | $250,000 |
| Frontenac | Ambulance Station - South Frontenac | $250,000 |
| Frontenac | Ambulance Accommodation - Frontenac Islands | $34,000 |
| Frontenac | Construction of a new Sydenham Library | $726,667 |
| Frontenac Islands | Wolfe Island Wind Plant Haul Roads Rehabilitation (Stage 2) | $158,666 |
| Frontenac Islands | Lower Side Road & Howe Island Drive Road Rehabilitation Project | $342,333 |
| Galway - Cavendish - Harvey | South Salmon Lake Road | $66,667 |
| Galway - Cavendish - Harvey | Buckhorn Welcome and Tourist Information Centre | $133,333 |
| Galway - Cavendish - Harvey | Kennedy Drive Rehabilitation | $133,333 |
| Galway-Cavendish and Harvey | Rehabilitation of the Lakehurst Hall | $200,000 |
| Gananoque | Sewage Lagoon Desludging Project | $200,000 |
| Gananoque (Separated) | Sanitary Sewer Infiltration Control Project | $150,000 |
| Gananoque (Separated) | Brock Street Reconstruction | $2,102,999 |
| Georgian Bay | Georgian Bay Islands National Park - Recapitalization of Cedar Springs Campground and installation of electrical power servicing | $2,318,000 |
| Georgian Bluffs | Big Bay Culvert Replacement | $55,000 |
| Georgian Bluffs | Park Head Culvert Replacement | $97,000 |
| Georgian Bluffs | 24th Street West Drainage Improvements | $163,170 |
| Georgian Bluffs | Construction of an Anaerobic Treatment and Electrical Power Plant in Georgian Bluffs | $833,333 |
| Georgina | Constructio of the Georgina Civic Centre Multi-Season Outdoor Recreation Campus | $4,736,458 |
| Geraldton | Rehabilitation of Airport Road | $1,862,553 |
| Gillies | PeeDee Park Enhancement | $3,000 |
| Gillies | Emergency Helipad Upgrade | $10,000 |
| Gilmour | Rehabilitation of Weslemkoon Lake Road | $250,000 |
| Glencoe | Expansion of the Glencoe Wastewater Treatment Facility | $1,829,166 |
| Glenora | Lake on the Mountain Vault Toilet/ Glenora Fisheries Roof | $150,000 |
| Goderich | Reconstruction of County Rd. 30 (Patrick Street) | $507,666 |
| Goderich | Construction of Ultraviolet Disinfection Facilities | $250,433 |
| Goderich | Replacement of River Mill Line Bridge | $102,300 |
| Goderich | Point Farms Parks Infrastructure | $322,500 |
| Goderich | Highway 21 - Goderich to Sheppardton. 9km | $4,900,000 |
| Gogama | Upgrades to Wastewater Treatment System | $28,725 |
| Gordon/Barrie Island | Gordon/Barrie Island Parks Rehabilitation | $62,490 |
| Gore Bay | Improvements to Gordon/Barrie Island Roads | $508,333 |
| Gore Bay | Replacement of Water Lines on Gore Street | $391,988 |
| Gore Bay | Renovations at Arena | $106,666 |
| Gore Bay | Construction of new Firehall | $113,333 |
| Gore Bay | Rehabilitation of the Gore Bay-Manitoulin Airport Runway | $1,680,000 |
| Gorham | Rehabilitation of Hazelwood Drive | $112,250 |
| Grand Bend | Pinery New & Enhanced Trails | $62,500 |
| Grand Bend | Pinery Road Rehabilitation | $350,000 |
| Grand Bend | Pinery Park Infrastructure | $4,000,000 |
| Grand Valley | Grand Valley Wastewater Servicing Program | $5,213,652 |
| Gravenhurst | Expansion of the Centennial Centre and Aquatic Facility in Gravenhurst | $6,175,716 |
| Greater Madawaska | Mill Street | $76,833 |
| Greater Madawaska | Pucker Street | $266,667 |
| Greater Napanee | Rehabilitation of Thomas Street | $463,791 |
| Greater Napanee | Rehabilitation of Camden Road | $179,608 |
| Greater Napanee | Rehabilitation of Roblin Road | $327,894 |
| Greater Napanee | Rehabilitation of South Shore Road in Napanee | $1,979,285 |
| Greater Sudbury | Municipal Road 80 (Paris Street). Kathleen Street to York Street | $3,833,333 |
| Greater Sudbury | Municipal Road 71 (LaSalle Boulevard) | $4,700,000 |
| Greater Sudbury | Municipal Road 86 (Falconbridge Highway). Kingsway to Skead Road | $4,333,333 |
| Greater Sudbury | Bell Park / Grace Hartman Amphitheatre | $1,665,000 |
| Greenstone | Upgrades to the Geraldton Sewage Works | $597,333 |
| Grey | Construction of Durham Maintenance Depot | $500,000 |
| Grey Highlands | Flesherton Arena & Community Hall Complex | $150,000 |
| Grey Highlands | Construction of the Grey Highlands Library - Flesherton Branch | $456,434 |
| Grimsby | Watermain Replacement Project | $441,660 |
| Grimsby | Book Road Reconstruction | $80,000 |
| Grimsby | Grimaby Town Redevelopment/Renovation | $2,187,660 |
| Gross & Burt | North Engelhard Management Unit (EMU) Road (Unincorporated Townships of Gross and Burt) | $50,000 |
| Guelph | Expansion of the Puslinch Multi - Use Recreational Facility | $716,328 |
| Guelph | Rea Bridge Replacement | $621,000 |
| Guelph | Wyndham Street: Carden to Wellington | $2,800,000 |
| Guelph | Norfolk: Norwich to Quebec | $1,800,000 |
| Guelph | Pavement Deficit - Woodlawn Road | $379,166 |
| Guelph | Sidewalk Rehabilitation Project #B | $1,000,000 |
| Guelph | Edinburgh Road: Speedvale to London | $833,300 |
| Guelph | Speedvale/Stevenson intersection | $833,300 |
| Guelph | Stevenson: York to Elizabeth | $1,500,000 |
| Guelph | Dawson Road Shelldale to Speedvale | $900,000 |
| Guelph | Victoria Road North Ferndale to City Limit | $800,000 |
| Guelph | Maltby Road Gordon to Hanlon | $933,300 |
| Guelph | Victoria Road South | $833,333 |
| Guelph | Victoria and Eastview Intersection Improvement | $500,000 |
| Guelph | Speedvale: Stevenon to East City Limit | $1,333,333 |
| Guelph | Eramosa & Delhi Intersection Improvement | $800,000 |
| Guelph | Westmount Road Speedvale to London | $1,000,000 |
| Guelph | Victoria/Woodlawn Intersection | $766,600 |
| Guelph | Stone Road Bicycle lanes | $750,000 |
| Guelph | Main Fire Station Rehabilitation | $397,833 |
| Guelph | River Run Performing Arts Centre Rehabilitation | $757,166 |
| Guelph | Transit Facility Rehabilitation | $592,166 |
| Guelph | Transit Terminal Infrastructure/Road. Sewer. Watermain Upgrades | $266,666 |
| Guelph | Renovations to the Family & Children's Services - 275 Eramosa Road | $1,433,333 |
| Haileybury | Construction of a new Sanitary Lift Station and Forcemain Upgrades | $1,182,900 |
| Haldimand County | Optimization and Upgrade of the Cayuga Wastewater Treatment Plant in Haldimand County | $1,539,000 |
| Haliburton | Replacement of Pine Lake Bridge | $287,383 |
| Haliburton | Road # 1 Rehabilitation | $300,000 |
| Haliburton | Road No. 503 Rehabilitation Priority #3 | $374,667 |
| Halton | Tremaine Road Widening | $5,333,333 |
| Halton | Oakville Southwest (Phase III) Wastewater Treatment Plant | $16,733,333 |
| Halton | Upgrade of the Skyway Wastewater Treatment Facility for the Region of Halton | $51,500,000 |
| Halton | Hwy 403 -QEW/Highway 403 to Hwy 6. Burlington | $4,150,000 |
| Halton Hills | Acton Branch Library Replacement | $1,166,667 |
| Halton Hills (Georgetown) | Replacement of the Stewarttown Road Bridge | $276,500 |
| Hamilton | Energy Retrofit - Lister District Energy Expansion | $400,000 |
| Hamilton | Lower Stoney Creek Recreation Centre - Phase One | $4,333,333 |
| Hamilton | Coronation Arean Public/Private Partnership | $1,000,000 |
| Hamilton | Westmount Recreation Centre | $7,000,000 |
| Hamilton | Sir Wilfrid Laurier Rehabilitation | $500,000 |
| Hamilton | Sir Allen MacNab Rehabilitation Project | $1,000,000 |
| Hamilton | Biogas/Digester (Energy Recovery) | $10,000,000 |
| Hamilton | Ferguson Pumping Station Upgrades | $6,666,667 |
| Hamilton | Woodward Water Treatment Plant Upgrades | $14,000,000 |
| Hamilton | Hillcreat Water Reservoir Upgrades | $2,866,667 |
| Hamilton | Kenilworth Water Reservoir and Pumping Station Upgrades | $2,266,667 |
| Hamilton | Stone Church Water Reservoir and Pumping Station Upgrades | $1,500,000 |
| Hamilton | Energy Retrofit - 700 Woodward Ave | $1,500,000 |
| Hamilton | Emergency Services Training Facility /Emergency Operations Centre | $8,333,333 |
| Hamilton | Ronald McDonald House Renovation and Expansion | $4,333,333 |
| Hamilton | Good Shepherd Venture Centre | $371,650 |
| Hamilton | YMCA Ottawa Street Renewal | $302,000 |
| Hamilton | Big Brothers Big Sisters of Hamilton and Burlington - Buidling Upgrades/Efficiency Upgrades | $416,250 |
| Hamilton | Upgrades to the Woodward Wastewater Treatment Plant | $100,000,000 |
| Hamilton | Morgan Firestone Arena Twinning | $3,425,000 |
| Hamilton/Niagara | Various Bridge Repairs - Hamilton/Halton and Peel | $1,100,000 |
| Hanover | The Construction of the Hanover Regional Recreation Complex | $3,500,000 |
| Hanover | Rehabilitation and Expansion of Water Treatment Plant | $1,200,000 |
| Hanover | 7th and 8th Avenue Sanitary Sewer Extension | $1,050,000 |
| Harley | Belle Vallee Rd Gravel Resurfacing | $86,000 |
| Harley | Development Rd East Rehabilitation | $140,000 |
| Harris | Vahey Road | $2,333 |
| Harris | Sale Barn Road | $4,333 |
| Harriston | Upgrade of the Sewage Collection and Treatment System | $637,666 |
| Hastings | Rehabilitation of Bayshore Road | $228,114 |
| Hastings | Hastings Heritage Trail Improvements | $42,000 |
| Hastings Highlands | Hastings Highlands Recreational/Cultural Facility | $1,522,667 |
| Hastings Highlands | Reconstruction of Peterson Road | $700,000 |
| Hastings Highlands | Reconstruction of Musclow Greenview Road | $1,000,000 |
| Havelock | Decommissioning of the Havelock Facultative Lagoons | $153,333 |
| Hawkesbury | Upgrade of the Hawkesbury Wastewater Treatment Plant | $11,882,988 |
| Hawkesbury | Dehumidifer Sports Complex | $53,333 |
| Head. Clara and Maria | Garage Energy Savings Retrofit | $12,833 |
| Head. Clara and Maria | Admin Building Lighting Upgrades | $5,833 |
| Head. Clara and Maria | Admin Building Insulation Upgrades | $4,167 |
| Hearst | Rehabilitation of the Hearst Water Treatment Plant | $390,700 |
| Hearst | Wastewater Lagoon and System Updgrade | $323,000 |
| Hearst | Construction of the Club Action Hearst Community Centre | $692,333 |
| Hearst | St-Pie X Rehabilitation - Rouse St. | $230,500 |
| Hearst | St-Pie X Rehabilitation - Garnett St. | $55,500 |
| Hearst | St-Pie X Rehabilitation - Allen St. | $380,000 |
| Hearst | St-Pie X Rehabilitation - Fontaine Drive | $289,000 |
| Hearst | St-Pie X Rehabilitation - Tremblay St. | $95,000 |
| Hearst Community Curling Club | Improvements to the Hearst Community Curling Club | $487,988 |
| Hess Township | Improvements to Geneva Lake Road | $14,175 |
| Hickson | Improvements to Coleman and Burton Street | $246,069 |
| Highlands East | Hadlington Road | $250,200 |
| Highlands East | Silent Lake Shelters | $45,000 |
| Hilton | Hamilton Drive Rehabilitation | $81,932 |
| Hilton Beach | Hilton Beach Community Centre Rehabilitation | $51,057 |
| Horseshoe Bay | Improvement to Haviland Shore Drive | $45,000 |
| Howick | Gough Road Reconstruction | $104,000 |
| Howick | Municipal Public Works Garage Addition | $69,000 |
| Howick | Spencetown Road Reconstruction | $108,000 |
| Hudson | Community Hall Renewal | $61,920 |
| Hudson | Sawmill Rd Rehabilitation | $145,000 |
| Hudson | Road B - Rehabilitation | $60,000 |
| Huntsville | Revitalization of Hanes Road | $966,289 |
| Huntsville | Port Sydney Fire Hall | $400,000 |
| Huntsville | Construction of Brunel Road Sports Park | $766,775 |
| Huntsville | The Stone School House- West Road Development | $533,333 |
| Huntsville/Parry Sound | Highway Resurfacing. Huntsville & Parry Sound | $375,000 |
| Huron | County Rd. 14 Resurfacing | $302,866 |
| Huron | County Rd. 19 Resurfacing | $571,030 |
| Huron - Kinloss | Concession 4 Resurfacing | $333,333 |
| Huron East | Cranbrook McNabb Road Resurfacing and Bridge Deck Waterproofing | $466,666 |
| Huron Shores | Dayton Road Loop (Sections 9-11) | $133,333 |
| Huron Shores | Maple Ridge Road Rehabilitation | $28,667 |
| Huron-Kinloss | Replacement of Point Clark Area North West Watermain and Road Reconstruction | $336,348 |
| Ignace | West Street Rehabilitation | $490,955 |
| Ignace | Lakeshore Drive Rehabilitation | $513,333 |
| Ignace | Rehabilitation of Pine Street | $411,283 |
| Ingersoll | Improvements to Road 74 - London to Woodstock Link | $593,403 |
| Ingersoll | Wonham Street North Reconstruction | $575,803 |
| Ingersoll | King Street West Reconstruction | $1,422,830 |
| Ingersoll | Clark Road East Reconstruction | $1,515,124 |
| Ingleside | Installation of Watermains in Osnabruck Centre | $673,716 |
| Innisfil | Innisfil beach Park Improvements | $333,300 |
| Innisfil | Innisfil Beach Park Improvements | $675,000 |
| Iron Bridge | Upgrade of Ansonia/Hopper Loop | $362,083 |
| Iroquois Falls | Reconstruction of Union and Gauthier Roads | $560,846 |
| Jacques | Improvements to Howcum Lake Road | $100,800 |
| James | Grey Street Drainage Improvements | $73,885 |
| Jocelyn | All Season Trails | $101,000 |
| Johnson | Government Road Improvements | $58,000 |
| Johnson | Recreation Centre Safety/Energy Upgrades | $68,333 |
| Johnson | Rehabilitation of Gordon Lake Road | $155,000 |
| Joly | Airport Road Widening | $125,000 |
| Kapuskasing | Upgrades to the Kapuskasing Waste Water Treatment Plant | $2,504,666 |
| Kapuskasing | Brock Crescent Rehabilitation | $330,000 |
| Kapuskasing | Cedar Street Rehabilitation | $1,153,333 |
| Kapuskasing | Maple Drive Rehabilitation | $400,000 |
| Kawartha Lakes | North West Trunk | $1,666,666 |
| Kawartha Lakes | Rehabilitation of CKL Road 45 | $1,233,333 |
| Kearney | Rehabilitation of Arterial Road 518E | $1,394,334 |
| Keene | Reconstruction of Indian River Line Road/Bridge | $279,333 |
| Keewatin | Improvements to McKenzie Portage Road | $19,000 |
| Keewatin | Refurbishment of Inglis Lake Road Surface | $6,667 |
| Kenilworth | Upgrade of the Mount Forest Durham Sewage Pumping Station and Discharge Forcemain | $1,383,000 |
| Kenora | Enhancements to the City of Kenora Water Distribution System | $1,000,000 |
| Kenora | Upgrading of Ena Lake Road | $17,550 |
| Kenora | Highway 17 twinning | $50,000,000 |
| Kenora | Highway 17 Gateway Rehabilitation Project | $2,333,333 |
| Kenora | Creation of Lake of the Woods Discovery Centre | $1,038,503 |
| Kenora | Birchcliff Group Home | $733,333 |
| Kenora | Mather Walls House Rehabilitation | $150,000 |
| Kenora | Highway 17 - East and West. Kenora | $3,050,000 |
| Kerns | Sand/Salt Shed | $89,496 |
| Killaloe. Hagarty and Richards | Cameron Street Rehabilitation | $14,333 |
| Killaloe. Hagarty and Richards | Stone Church Road & Cardinal Road Rehabilitaion | $21,000 |
| Killarney | Expansion of the Killarney Waste Disposal Site | $153,000 |
| Killarney | Killarney Residential Ontario Ranger Camp Renewal | $550,000 |
| Killarney | Killarney New Trail | $45,000 |
| Kincardine | Extending of Water Distribution and Sanitary Sewage Collection Facilities (Inverhuron Urban Area) | $3,038,200 |
| Kincardine | Connaught Park Fair Grounds Accessibility Project | $100,000 |
| Kincardine | Restoration of the Kincardine Centre for the Arts | $331,100 |
| King | Schomberg Arena/Curling/Fitness Facility Construction Project | $4,720,000 |
| King City | Resurfacing Roads | $568,444 |
| Kingsford | Improvement of Off Lake Road in Emo | $31,500 |
| Kingston | Queen’s University Performing Arts Centre
| $15,000,000 |
| Kingston | Water Master Plan Implementation - O’Connor Drive Reservoir & Discharge Header | $4,500,000 |
| Kingston | Water Master Plan Implementation – Bayridge Drive | $2,950,000 |
| Kingston | Water Master Plan Implementation – Front Road | $3,333,333 |
| Kingston | Robert Meek Revitalization | $300,000 |
| Kingsville | Improvements to the Kingsville Sewer System | $3,735,366 |
| Kingsville | Project 1of 3 - Cull Drive Infrastructure Renewal | $669,500 |
| Kirkland Lake | Reconstruction of Taylor Avenue and Prospect Avenue | $526,767 |
| Kirkland Lake | Wastewater treatment facility | $16,000,000 |
| Kirkland Lake | Esker Lake Residential Ontario Ranger Camp Renewal | $250,000 |
| Kitchener | Centre in the Square Rehabilitation | $400,000 |
| Kitchener | City Hall Lighting | $333,000 |
| Kitchener | Consolidated Maintenance Facility Improvements | $4,666,667 |
| Kitchener | Consolidated Maintenance Facility Solar Roof | $1,366,667 |
| Kitchener | Accessibility Improvements | $334,000 |
| Kitchener | Energy Management Systems | $500,000 |
| Kitchener | McLennan Park Development | $1,000,000 |
| Kitchener | Sewer and Watermain Rehabilitation | $833,334 |
| Kitchener | Improvements to Highway 8 between Highway 7/8 (Conestoga Parkway) and Highway 401 | $29,908,500 |
| Kitchener | Woodside National Historic Site - Recapitalization of grounds facilities. parking lot and washrooms | $451,000 |
| Kleinburg | McMichael Grounds infrastructure | $2,100,000 |
| L'Orignal | Rehabilitation of the Riceville Bridge | $846,560 |
| La Vallee | Emo-LaVallee Community Centre Retrofit | $12,136 |
| La Vallee | Pyne Road Rehabilitation | $19,000 |
| La Vallee | Rehabilitation of Cain Road | $32,000 |
| Laird | Laird Hall Rehabilitation | $10,000 |
| Lake of Bays | Winter Sand Storage Building | $236,666 |
| Lake of the Woods | Frenchman's Rock Road Upgrade | $54,333 |
| Lake of the Woods | Moosebay Road Upgrade | $41,000 |
| Lake of the Woods | Lakewood Drive Upgrade | $38,000 |
| Lake of the Woods | Development of Phase 2 of Waterfront Park | $60,000 |
| Lambton | Lambton County Road 8 Rehabilitation | $633,333 |
| Lambton | Community Health Services Department Expansion | $558,000 |
| Lambton | Lambton County Communiciations Enhancement | $109,648 |
| Lambton Shores | Grand Bend Main Street Redevelopment | $870,830 |
| Lambton Shores | Thedford Bosanquet Community Centre Revitalization | $1,500,000 |
| Lambton Shores | Thedford Village Green | $167,899 |
| Lambton Shores | Forest Water Distribution System Upgrade | $2,327,895 |
| Lanark | Rehabilitation of Clydesville Bridge | $442,377 |
| Lanark Highlands | Galbraith Road Improvements | $501,890 |
| Lanark Highlands | Highland Line Construction Improvements | $484,232 |
| Lancaster | Rehabilitation of South Service Road/Trail | $1,302,108 |
| Lansdowne | Construction of Storm Water Management Facilities in Lyndhurst | $775,556 |
| Lansdowne | Charleston Lake Shleters | $45,000 |
| Lappe | Lappe Volunteer Fire Department Hall Expansion | $48,600 |
| Larder Lake | Renovation & Relocation of the Larder Lake Public Library | $86,333 |
| Larder Lake | Larder Lake Municipal Complex | $268,469 |
| Larder Lake | Renovation of a former public school to house a new municipal complex | $268,469 |
| Larder Lake | The relocation and renovation of the public library | $86,333 |
| LaSalle | Construction of Laurier Road Extension and the Hwy 3/Hwy 401/Windsor-Essex Parkway Interchange | $6,000,000 |
| LaSalle | Improvements to Malden Road | $3,416,633 |
| LaSalle | Front Road Infrastructure and Public Safety Renewal | $2,000,000 |
| Latchford | Replacement of the Roof at the Fred Keenan Centre | $20,000 |
| Latchford | Cosens Avenue - Murphy Mill Extension | $25,000 |
| Laurentian Hills | Corrective Measures to the Chalk River Water Treatment Plant | $130,000 |
| Laurentian Valley | Bruham Avenue Watermain Rehabilitation | $100,000 |
| Leamington | Upgrade of the Pollution Control Centre - Phases 4 and 5 | $6,000,000 |
| Leamington | Erie at Seacliff Intersection Improvements | $866,667 |
| Leamington | Development of Seacliff Park in Leamington | $1,057,696 |
| Leeds and Grenville | County Road 5 Resurfacing | $1,070,000 |
| Leeds and Grenville | Rehabilitation of County Road #2 from Mallorytown to Long Beach | $973,310 |
| Leeds and the Thousand Islands | Leeds and the Thousand Islands Lyndhurst Fire Hall and Combined Training Facility | $666,666 |
| Leeds and the Thousand Islands | Maple Grove Road | $280,000 |
| Leeds and the Thousand Islands | Improvements to the Lansdowne Drinking Water System | $320,834 |
| Lennox & Addington | County Road 41 Reconstruction (7.5km) | $2,681,534 |
| Levack | Windy Lake Shelters | $45,000 |
| Limerick | Pleasure Bay Road Rehabilitation | $179,064 |
| Lindsay | Construction of the Fenelon Falls Recreation Complex | $3,500,000 |
| Lindsay | Homeward Bound Structure Rehabilitation | $400,000 |
| Lion's Head | Construction of Sand/Salt Storage Facilities | $272,000 |
| Lisle | Rehabilitation of Mulmur Landfill Road | $602,850 |
| Listowel | Reconstruction of the Hilpert Bridge | $182,117 |
| Little Current | Rehabilitation of Limit Street Bridge | $86,417 |
| London | Replacement of the Dorchester Bridge | $2,270,400 |
| London | Huron Elgin London Project | $49,985,307 |
| London | Wellington Road Gateway | $900,000 |
| London | Oakridge Optimist Park - Improve Park Amenities | $487,000 |
| London | Thames Valley Parkway - North Branch | $500,000 |
| London | Transit Building Life Cycle Repairs | $2,360,000 |
| London | Lifecycle Repairs to Sewer System - South London | $400,000 |
| London | Lifecycle Repairs to Sewer System - Old North/Downtown | $866,667 |
| London | Lifecycle Repairs to Sewer System - Old South London | $666,667 |
| London | Lifecycle Repairs to Sewer System-Old East London | $733,333 |
| London | Skyway Industrial Park - Phase 2 | $2,116,666 |
| London | Innovation Industrial Park - Phase 3 | $4,700,000 |
| London | Dundas Street Gateway | $1,000,000 |
| London | Walnut/Kensington Area Sanitary and Storm Sewer Replacement | $366,667 |
| London | Bathurst Street Sanitary Sewer Replacement | $500,000 |
| London | Old South Storm Sewer Installation/Sanitary Sewer Replacement | $1,100,000 |
| London | Old South Combined Sewer Overflow Project-Wellington Road Area-Trevithen/Alexandra/Whetter | $1,333,333 |
| London | Old East London Storm Sewer Installation and Sanitary Sewer Replacement | $833,333 |
| London | South London - Eden Avenue Storm Sewer Installation | $533,333 |
| London | Boyle Community Centre - Rehabilitate Facility | $400,000 |
| London | Thames Valley Parkway - Main Branch | $450,000 |
| London | Oxford - New Operations Facility | $934,666 |
| London | City Hall Building Improvements | $1,566,667 |
| London | Carling Heights - Rehabilitate Facility | $566,666 |
| London | Ed Blake Park - New Park Features | $391,666 |
| London | Byron Community Centre - Rehabilitate Facility | $432,000 |
| London | Kiwanis Park - Improve Park Amenities | $683,333 |
| London | Hale & Trafalgar Street Overpass | $3,950,000 |
| London | Highbury Bride Rehabilitation | $666,667 |
| London | Quebec Street Overpass Rehabilitation | $666,667 |
| London | Veterans Memorial Parkway | $233,000 |
| London | Library Branch Rehabilitation | $133,333 |
| London | Farquharson Arena - Roof Replacement | $210,000 |
| London | Carling Arena - Replace Roof and Compressors | $240,000 |
| London | Basil Grover Park - Improve Park Amenities | $150,000 |
| London | Argyle Arena Lighting Upgrade | $33,333 |
| London | Kinsmen Arena - Replace Arena Lights | $33,333 |
| London | Stronach Arena - Replace Arena Lights | $33,333 |
| London | Piccadilly Park - Improve Park Amenities | $116,667 |
| London | AJ Tyler Operations Centre - Building Improvements | $239,666 |
| London | Fire Hall No. 10 - Building Improvements | $225,000 |
| London | Nichols Arena - Replace Arena Lights | $50,000 |
| London | Medway Park - Improve Park Amenities | $316,666 |
| London | Fire Hall No. 9 - Building Improvements | $183,333 |
| London | Renovation and Expansion The Royal Canadian Regiment Museum | $1,500,000 |
| London | Goodwill Social Enterprise Abilites Centre | $3,898,151 |
| London | Restoration and Redevelopment of The Cornerstone | $1,389,957 |
| London | Hutton House Main Building Expansion | $256,250 |
| London | The Grand Theatre Rehabilitation Project | $919,792 |
| London | Ronald McDonald of Southwestern Ontario Expansion | $2,600,000 |
| Loyalist Township | Amherst Island Culvert Replacement Project | $111,000 |
| Loyalist Township | Reconstruction of Factory Street in Odessa | $221,375 |
| Lucan Biddulph | George Street Watermain Replacement | $284,088 |
| Lucan Biddulph | Saintsbury Line Reconstruction | $319,416 |
| Lucan Biddulph | Facility Rehabilitation (Lucan Community Memorial Centre) | $156,667 |
| Lucan Biddulph | Renewal of the Lucan Waste Water Treatment Plant | $825,000 |
| Macdonald. Meredith and Aberdeen Add l | Milligan Gazebo | $19,498 |
| Macdonald. Meredith and Aberdeen Add l | Municipal Office Addition | $33,054 |
| Macdonald. Meredith and Aberdeen Add l | Sportsplex Upgrades | $41,625 |
| Machar | Eagle Lake Narrows Bridge | $181,125 |
| Machin | Creation of Pine Tree Park Centennial Pavilion | $32,500 |
| Madoc | Rehabilitation of Moira Road | $746,063 |
| Madoc | Accessibility Upgrade | $7,000 |
| Madoc | Rehabilitation of Barry Cooper Road in Madoc | $565,011 |
| Magnetawan | Reconstruction of South Sparks Street | $283,333 |
| Magnetawan | Rehabilitiation of Ahmick Lk Rd. | $210,000 |
| Magnetawan | New Municipal Complex | $667,000 |
| Malahide | Firehall/Multi Use Building | $566,666 |
| Manitouwadge | Improvements to the Manitouwadge Airport | $100,000 |
| Manitouwadge | Manitouwadge Waste Water Lagoon Project | $83,333 |
| Manitowaning | Diversion of Assiginack Landfill Waste and Capacity Retention | $173,633 |
| Manotick | Rideau Canal National Historic Site - Rehabilitation of a lock at Black Rapids | $1,100,000 |
| Mapleton | Construction of a Community Hall in Alma | $520,567 |
| Marathon | Development of a Regional Waste Management System | $2,495,360 |
| Marathon | Provide Potable Water to the Visitors Information Centre | $18,000 |
| Markdale | Replacement of Sewage Pumping Stations | $456,625 |
| Markham | Thornhill Community Centre & Library Expansion | $2,000,000 |
| Markham | Facility Accessibility. Energy Retrofit and Emergency Operations Centre Rehabilitation | $2,400,000 |
| Markstay - Warren | Salt Dome Warren Garage | $100,000 |
| Markstay-Warren | Upgrades to the Markstay-Warren Community Centre | $150,667 |
| Marmora | Replacement of the Station Bridge | $268,333 |
| Marmora and Lake | Rehabilitation of Centre Line Road | $98,333 |
| Marmora and Lake | Marmora and Lake SCADA Upgrades | $150,000 |
| Massey | Realignment and reconstruction of Birch Lake Road | $238,770 |
| Matachewan | Upgrades to the Water Distribution System | $677,766 |
| Matachewan | Municipal Building Improvements | $36,304 |
| Matheson | Rehabilitation of Monahan Road | $128,620 |
| Mattawa | Replacement of Pautois Bridge #5 | $302,500 |
| Mattawa | Construction of Sand Dome | $89,167 |
| Mattawa | Highway 17 Sewer and Water Replacement | $1,800,000 |
| Mattawa | Samuel de Champlain Museum & Information | $150,000 |
| Mattice - Val Cote | Community Parks 2009 | $16,666 |
| Mattice - Val Cote | Infrastructure 2009 | $44,000 |
| Maynooth | Construction of Salt/Sand Structure | $560,000 |
| McDougall | Public Works Building | $81,333 |
| McDougall | Replacement of McDougall Recreation Facility | $439,200 |
| McKellar | Improvements to the Community Centre | $383,500 |
| McKellar | Middle River Bridge Replacement | $766,667 |
| McMurrich/Monteith | Stisted Road Reconstruction Project | $63,333 |
| McMurrich/Monteith | Stisted Road Slurry Seal Project | $53,333 |
| Meaford | Replacement of the Harris Bridge | $464,333 |
| Meaford | 3rd Line Rehabilitation | $63,667 |
| Meaford | Boucher and Victoria Water Main | $67,667 |
| Meaford | Community Center/Arena Roof Replacement | $55,000 |
| Meaford | Construction of the St Vincent Street Water Booster Station | $562,000 |
| Merrickville | Replacement of the Village of Merrickville-Wolford Sewage Treatment Plant | $2,440,000 |
| Merrickville - Wolford | Collar Hill Road Construction | $91,667 |
| Merrickville - Wolford | Main Street Watermain Replacement | $319,333 |
| Merrickville - Wolford | Snowdons Corners Road Construction | $139,333 |
| Middlesex | County Road 81 (Grand Bend Road) Rehabilitation | $476,096 |
| Middlesex Centre | Denfield Operations Centre | $2,000,000 |
| Middlesex Centre | Middlesex Centre Community Wellness and Recreation Centre | $8,102,641 |
| Midland | Construction of the Midland Soccer Field | $250,000 |
| Midland | Municipal Office Expansion/Retrofit | $1,333,333 |
| Miller Lake | Cabot Head Provincial Nature Reserve: Greening the Research Centre and Bird Observatory | $12,500 |
| Milton | Milton Sports Centre Expansion Phase 1 | $6,678,425 |
| Milton | Construction of Arts & Cultural Centre | $8,114,920 |
| Milton | Community Living North Halton - 917 Nipissing Road | $400,000 |
| Milverton | Construction of Shakespeare Wastewater Servicing | $1,877,697 |
| Mindemoya | Improvements to the Mindemoya Arena | $95,975 |
| Minden | Reconstruction of County Rd. 21 and Rehabilitation of Allsaw Bridge | $876,666 |
| Minden | Construction of the Minden Elevated Storage Tank | $802,083 |
| Minden Hills | Riverview Walk | $521,820 |
| Mine Centre | Resurfacing of Mine Centre Road | $27,738 |
| Ministic Lake | Rehabilitation of Ministic Lake Road in Levack Onaping | $42,281 |
| Minto | Harriston Community Centre Upgrades | $62,333 |
| Minto | Rehabilitation of the Palmerston Lions Park Brownfield | $316,667 |
| Mississauga | City Centre Transit Priority - Mavis | $443,333 |
| Mississauga | City Centre Transit Priority - Rathburn | $1,390,000 |
| Mississauga | Burnhamthorpe Branch Library Redevelopment | $5,533,333 |
| Mississauga | Lorne Park Branch Library Redevelopment | $1,333,333 |
| Mississauga | Lakeview Branch Library Redevelopment | $833,333 |
| Mississauga | Civic Centre Building: Underground Parking Garage Repairs and Public Square Rehabilitation | $13,333,333 |
| Mississauga | Eglinton Avenue West-Road Rehabilitation | $702,000 |
| Mississauga | Admiral Boulevard-Road Rehabilitation | $364,422 |
| Mississauga | Aerowood Drive-Road Rehabilitation | $156,000 |
| Mississauga | Mavis Road Noise Attenuation Barrier Replacement | $45,333 |
| Mississauga | Argentia Road-Road Rehabilitation | $730,539 |
| Mississauga | Mavis Road Noise Attenuation Barrier Replacement | $176,000 |
| Mississauga | Burnhamthorpe Road East Noise Attenuation Barrier Replacement | $102,933 |
| Mississauga | Britannia Road East-Road Rehabilitation | $424,125 |
| Mississauga | Burnhamthorpe Road East Noise Attenuation Barrier Replacement | $9,866 |
| Mississauga | Burnamthorpe Road-Road Rehabilitation | $273,000 |
| Mississauga | Creditview Road-Road Rehabilitation | $487,500 |
| Mississauga | Winston Churchill Blvd - Road Rehabilitation | $2,643,333 |
| Mississauga | Eglinton Avenue West-Road Rehabilitation | $715,000 |
| Mississauga | Winston Churchill Blvd. - Road Rehabilitation | $900,000 |
| Mississauga | Burnhamthorpe Road East Noise Attenuation Barrier Replacement | $22,933 |
| Mississauga | Haultain Court - Road Rehabilitation | $45,500 |
| Mississauga | Burnhamthorpe Road East Noise Attenuation Barrier Replacement | $72,266 |
| Mississauga | Lakeshore Road West-Road Rehabilitation | $973,917 |
| Mississauga | Maingate Drive-Road Rehabilitation | $238,334 |
| Mississauga | Turner Valley Road - Road Rehabilitation | $91,000 |
| Mississauga | Burnhamthorpe Road East Noise Attenuation Barrier Replacement | $26,933 |
| Mississauga | Burnhamthorpe Road East Noise Attenuation Barrier Replacement | $92,266 |
| Mississauga | Burnhamthorpe Road East Noise Attenuation Barrier Replacement | $12,266 |
| Mississauga | Britannia Road West- New Sidewalk Construction | $38,653 |
| Mississauga | Britannia Road West- New Sidewalk Construction | $11,396 |
| Mississauga | Britannia Road East- New Sidewalk Construction | $17,680 |
| Mississauga | Kennedy Road- New Sidewalk Construction | $10,313 |
| Mississauga | Tomken Road Noise Attenuation Barrier Replacement | $88,000 |
| Mississauga | Derry Road West- New Sidewalk Construction | $59,193 |
| Mississauga | Derry Road East- New Sidewalk Construction | $339,256 |
| Mississauga | Bonhill Road- New Sidewalk Construction | $34,883 |
| Mississauga | Eglinton Avenue Noise Attenuation Barrier Replacement | $15,466 |
| Mississauga | Brunel Road- New Sidewalk Construction | $47,710 |
| Mississauga | Cardiff Boulevard- New Sidewalk Construction | $8,060 |
| Mississauga | Columbus Road- New Sidewalk Construction | $46,843 |
| Mississauga | Eglinton Avenue Noise Attenuation Barrier Replacement | $59,200 |
| Mississauga | Dixie Road- New Sidewalk Construction | $37,093 |
| Mississauga | Freemont Boulevard- New Sidewalk Construction | $21,493 |
| Mississauga | Hadwen Road- New Sidewalk Construction | $21,060 |
| Mississauga | Meyerside Drive- New Sidewalk Construction | $83,850 |
| Mississauga | Confederation Parkway Noise Attenuation Barrier Replacement | $58,666 |
| Mississauga | Mid-way Boulevard- New Sidewalk Construction | $22,966 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Bonnie Brea | $14,666 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Hawkins Glen | $24,800 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Sawmill Valley Trail | $275,966 |
| Mississauga | Pathway Paving and Lighting Rehabilitation @ Elmcreek Park | $31,466 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Brookmede Park | $51,833 |
| Mississauga | Pathway Paving and Lighting Rehabilitation-Kings Masting Park | $100,800 |
| Mississauga | Serson Park | $80,000 |
| Mississauga | Pathway Paving and Lighting Rehabilitation @ Woodgreen Park | $38,300 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Gordon Lummiss Park | $27,200 |
| Mississauga | Pathway Paving and Lighting Rehabilitation @ Richards Memorial Park | $18,033 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Lake Wabukayne | $135,166 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Stillmeadows Park | $21,433 |
| Mississauga | Pathway Paving and Lighting Rehabilitation @ Brandon Gate Park | $34,933 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Sandgate Park | $11,300 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Douglas Kennedy Park | $107,000 |
| Mississauga | Pathway Paving and Lighting Rehabilitation @ Bloor Athletic Field | $38,300 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Meadow Green | $62,900 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Springfield Park | $28,166 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Arbour Green | $38,300 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Lake Aquitaine | $150,933 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Huron Park | $187,233 |
| Mississauga | Pathway Paving and Lighting Rehabilitation McCauley Green | $41,700 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Stonebrook Park | $51,833 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Spruce Park | $31,466 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Fred Halliday Memorial Park | $22,900 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Lake Aquitaine Trail | $107,600 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Thornlodge Park | $117,133 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Northwood Park | $83,366 |
| Mississauga | Pathway Paving and Lighting Rehabilitation J.J. Plause Park | $139,900 |
| Mississauga | Stormwater Management Facility No. 3601. Dredging and Rehabilitation | $166,666 |
| Mississauga | Rathburn Road East- Noise Attenuation Barrier Replacement | $39,200 |
| Mississauga | Rathburn Road West- Noise Attenuation Barrier Replacement | $86,400 |
| Mississauga | Rathburn Road West- Noise Attenuation Barrier Replacement | $40,000 |
| Mississauga | Rathburn Road West- Noise Attenuation Barrier Replacement | $113,333 |
| Mississauga | Rathburn Road West- Noise Attenuation Barrier Replacement | $133,333 |
| Mississauga | Rathburn Road West- Noise Attenuation Barrier Replacement | $66,400 |
| Mississauga | Rathburn Road West- Noise Attenuation Barrier Replacement | $69,333 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Promenade Meadows | $41,700 |
| Mississauga | Pathway Paving and Lighting Rehabilitation J.C. Saddington Park | $80,000 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Kennedy Park | $24,800 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Hiawatha Park | $78,300 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Prinetree Grove Park | $11,300 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Derry Greenway | $48,300 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Rayfield Park | $38,300 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Millgrove Trail | $321,000 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Eden Woods | $76,600 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Trappers Green | $141,933 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Sheridan Creek Trail | $128,433 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Woodhurst Heights | $123,333 |
| Mississauga | Pathway Paving and Lighting Rehabilitation @ Shaver Trail | $90,133 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Windy Hollow | $86,733 |
| Mississauga | Pathway Paving and Lighting Rehabilitation @ Wildwood Park | $86,733 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Glen Eden Park | $82,033 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Edengrove Park | $73,233 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Woodington Green | $135,166 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Woodland Chase Park | $51,833 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Windwood Park | $103,066 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Woodeden Park | $50,933 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Turney Woods | $48,433 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Shelby Park | $48,433 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Rathwood District Park | $96,866 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Kogaydiwin Trail | $83,366 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Glendenning Park | $39,733 |
| Mississauga | Pathway Paving and Lighting Rehabilitation-Springbank Meadows | $34,933 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Millgrove park | $34,933 |
| Mississauga | Pathway Paving and Lighting Rehabilitation @ Golden Orchard Park | $29,333 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Plowmans Park | $29,333 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Wakefield Common Park | $56,966 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Settlers Green | $50,266 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Brentwood Park | $45,066 |
| Mississauga | Pathway Paving and Lighting Rehabilitation-Westwood Park | $45,066 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Beechwood Park | $21,433 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Kindree Gate | $18,033 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Taffey Park | $18,033 |
| Mississauga | Pathway Paving and Lighting Rehabilitation-Richard F.C. Mortenson Park | $31,566 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Burnhamthorpe Library Grounds | $31,566 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Pinecliff Park | $14,333 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Meadowvale Sports Park | $28,166 |
| Mississauga | Pathway Paving and Lighting Rehabilitation McKenzie Park | $28,166 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Shalebank Hollow | $28,166 |
| Mississauga | Pathway Paving and Lighting Rehabilitation Ben Machree Park | $19,266 |
| Mississauga | Port Credit Branch Library Redevelopment | $833,333 |
| Mississauga | Clarkson Community Centre & Library Expansion | $3,333,333 |
| Mississauga | Malton Community Centre & Library Expansion | $3,333,333 |
| Mississippi Mills | Reconstruct 4km of 8th Concession Ramsay | $160,000 |
| Mississippi Mills | Spring Street Reconstruction Including Water / Sewer Main Replacement | $147,000 |
| Mississippi Mills | Renovations to Almonte Community Centre | $651,740 |
| Mitchell | Development of Mitchell Domestic Landfill Site | $1,166,400 |
| Mono | Blind Line Reconstruction (County Rd. 10 to County Road 16) | $507,667 |
| Mono | NEC Mono Cliffs Provincial Park Signage | $12,500 |
| Montague | Rehabilitation of McCrea Road | $58,333 |
| Moonbeam | Upgrade of Walker Road | $218,907 |
| Moonbeam | Accessibilité à la Bibliothèque | $130,000 |
| Moonbeam | ISF-Fire Hall Expansion | $145,833 |
| Mooretown | Construction of the St. Clair Regional Wastewater Treatment Plant | $10,509,921 |
| Moose Factory | Improvements to the Water Distribution System | $668,151 |
| Moose Factory Island | Hudson's Bay Staff House Rehabilitation | $60,000 |
| Moosonee | Replacement of Butler Creek Bridge | $1,074,026 |
| Morley | Community Centre Complex Rehabilitation | $27,000 |
| Morpeth | Rondeau Road Rehabilitation | $350,000 |
| Morpeth | Rondeau Picnic Shelter | $50,000 |
| Morrsiburg | St. Lawrence Parks Commission - Road & Bridge Repair | $3,550,000 |
| Mount Elgin | Reconstruction of Dodge Line | $385,653 |
| Murillo | Improvements to Twin-City Crossroads and Arthur Street West | $799,835 |
| Muskoka | Muskoka Branch New Shelter Project | $596,667 |
| Muskoka | Highway 11 -Sedora Rd Underpass. south of Gravenhurst | $500,000 |
| Muskoka Lakes | Bala Fire Station Renovation/Expansion | $116,667 |
| Napanee | Rehabilitation of County Road 41 | $1,303,659 |
| Napanee | Reconstruction of Bridge Street West | $632,665 |
| Neebing | Construction of the Pine River Bridge | $443,000 |
| Neebing | Pardee Road Resurfacing Project | $143,820 |
| Neebing | Sand/Salt Storage Shed | $33,333 |
| New Liskeard | Construction of a Biofuel Pellet Plant | $1,458,750 |
| Newbury | Newbury Municipal Office Expansion and Renovation | $98,000 |
| Newmarket | Retrofitting the Old Town Hall into a Creative Centre | $1,698,621 |
| Newmarket | Parkview Crescent Road Reconstruction | $319,000 |
| Newmarket | Cultural Re-vitalization Historic Downtown | $2,035,000 |
| Niagara | Road 73 (Fly Road) Reconstruction & Upgrading | $900,000 |
| Niagara | Baker Road Wastewater Treatment Plant (WWTP) Upgrade | $8,333,333 |
| Niagara | Frenchman's Creek Sewage Servicing | $6,666,667 |
| Niagara | Seaway Wastewater Treatment Plant (WWTP) Expansion | $7,333,333 |
| Niagara | Road 101 (Mountain Road) Reconstruction & Storm Drainage Project | $1,166,000 |
| Niagara | Combined Sewer Overflow High Rate Treatment - Niagara Falls Wastewater Treatment Plant (WWTP) | $5,000,000 |
| Niagara | Highway 140 - Hwy 3 to Niagara Rd. 23. Port Colborne. 5.7km | $3,000,000 |
| Niagara Falls | Expansion of the Lundy's Lane Historical Museum | $3,237,666 |
| Niagara Falls | Drummond Road Reconstruction | $2,100,000 |
| Niagara Falls | Niagara People Mover Project
| $25,000,000 |
| Niagara Falls | Upgrades to the Queen Street streetscape | $889,033 |
| Niagara Falls | Boys and Girls Club Niagara Falls Center | $4,000,000 |
| Niagara Falls | The Children's Aid Society of the Niagara Region - Phase II | $836,667 |
| Niagara Falls | Downtown Infrastructure Revitalization | $889,033 |
| Niagara Falls | Niagara Parks Commission (War of 1812) | $4,470,000 |
| Niagara-on-the-Lake | Niagara District Airport Infrastructure Improvements | $3,869,334 |
| Niagara-on-the-Lake | Multi Purpose Trail | $50,000 |
| Niagara-on-the-Lake | Warner Road Reconstruction | $283,333 |
| Nipigon | Upgrades to Wastewater Treatment in Nipigon | $3,450,000 |
| Nipissing | Rehabilitation of Wolfe Lake Road | $68,933 |
| Nipissing | Nipissing Fire Station #1 Addition | $70,000 |
| Nipissing | Nipissing Public Works Garage Energy Retrofitting | $26,667 |
| Nipissing | Rehabilitation of Ski Hill Road and Mountainview Road in Nipissing | $34,167 |
| Nippissing Social Services Administration Board | DNSSAB Accommodation | $900,465 |
| Nobel | Reconstruction of Oakridge Road | $113,098 |
| Nobel | Improvements to Snug Harbour Rd. | $91,667 |
| Noelville | Expansion of the Noëlville Landfill Site | $347,600 |
| Norfolk County | County Road 42 Road Rehibiliation | $2,760,000 |
| Norfolk County | Langton Arena Upgrades | $250,000 |
| Norfolk County | Water Meter Replacement Program | $1,540,000 |
| North Algona Wilberforce | Golden Lake Municipal Building Rehabilitation | $18,000 |
| North Algona Wilberforce | B-Line Road Resurfacing Project | $115,000 |
| North Algona Wilberforce | Smiths Bay Road Resurfacing | $60,000 |
| North Bay | Installation of North Bay Water Meters | $2,320,483 |
| North Bay | Algonquin/Front Rehabiliation Program | $4,666,667 |
| North Bay | Construction of Multi-Use Outdoor Sports Complex | $3,000,000 |
| North Bay | Yes Employment Expansion & Renovations | $1,000,000 |
| North Dumfries | Development of Multi Use Recreation Facility | $4,391,333 |
| North Dundas | Winchester Water Transmission Main Project | $278,333 |
| North Dundas | Reconstruction of Belmeade Road | $833,133 |
| North Dundas | Reconstruction of Boyne Road in Winchester | $865,387 |
| North Frontenac | Rehabilitation of Ardoch Road | $250,000 |
| North Glengarry | Alexandria Water System Upgrade | $1,140,000 |
| North Glengarry | Park Street Sanitary Sewer Replacement | $250,000 |
| North Glengarry | Construction of the Glengarry Indoor Sports Complex in Alexandria | $400,000 |
| North Grenville | Boundary Road Gravel Rebuild | $600,000 |
| North Grenville | North Grenville Public Library | $1,333,870 |
| North Huron | Blyth Campground Event Venue with Washrooms. Showers & Laundry | $45,675 |
| North Kawartha | North Kawartha Library and Community Poice Building | $293,333 |
| North Kawartha | Public Works Garage | $316,667 |
| North Kawartha | Fire Station 1 Addition | $133,333 |
| North Kawartha | Reconstruction of Anstruther Lake Road in Apsley | $1,133,215 |
| North Middlesex | Renovation and Expansion of the North Middlesex Arena Addition | $1,667,780 |
| North Perth | Rehabilitation of North Perth Administration Building | $1,200,000 |
| North Perth | Listowel Wastewater and Water Infrastructure Renewal | $2,106,167 |
| North Stormont | Finch-Roxborough Boundary Road Reconstruction | $377,233 |
| North Stormont | Rehabilitation North Stormont Arena | $392,400 |
| Northeastern Manitoulin & The Islands | Recreation Centre Energy Conservation Upgrades | $136,967 |
| Northeastern Manitoulin and The Islands | Indian Mountain Road Upgrade | $74,583 |
| Northeastern Manitoulin and The Islands | Upgrade Membrane Cassettes at Little Current Water Plant | $166,603 |
| Northern Bruce Peninsula | Municipal building at Ferndale for Tourism and Public Washroom Facility at the Ferndale Park | $133,333 |
| Northern Bruce Peninsula | Highway 6 - Tobermory Southerly | $10,000,000 |
| Northumberland | Northumberland/United Way EMS Headquarters/ Food 4 All Warehouse | $458,333 |
| Norwich | Fire/EOC Station #1 | $366,666 |
| Norwood | Upgrades to the Water System and the Installation of Water Meters | $337,000 |
| O Connor | Bridge #1 Rehabilitation | $16,200 |
| O Connor | O''Connor Municipal Building & Council Chambers | $107,800 |
| Oakville | Priority #1 -Oakville Transit Facility Renewal and Expansion | $15,000,000 |
| Oakville | Bronte Creek Day Use Improvements | $150,000 |
| Oil Springs | Improvements to the Oil Springs Water System | $138,676 |
| Oil Springs | Waterline Replacement Project | $278,040 |
| Oliver Paipoonge | Kakabeka Fire Station | $104,000 |
| Oliver Paipoonge | Rosslyn Library Addition | $100,000 |
| Orangeville | Reconstruction of Roads and Services in the South Park Subdivision | $1,650,000 |
| Orangeville | Replacement of Mono Bridge 26 | $216,666 |
| Orangeville | William Street - Water Main and Sanitary Sewer Replacement | $600,000 |
| Orangeville | Renovations to the Tony Rose Memorial Sports Centre | $500,000 |
| Orangeville | County Administration and Provincial Offences Court/Administration Addition | $2,700,000 |
| Orillia | Construction of a Public Library and Market Square | $2,000,000 |
| Orillia | Improvements to the Coldwater Water Distribution System | $1,500,000 |
| Orillia | Albany Avenue Rehabilitation | $666,666 |
| Orleans | Development of a Community Services Centre Orleans-Cumberland | $250,000 |
| Oro-Medonte | Highway 11 - Oro Medonte Line 5 to Memorial Ave (Simcoe Rd 49 IC). 16 km. resurfacing | $8,000,000 |
| Orrville/Parry Sound | East of Hwy 400 easterly Towards Orrville | $2,050,000 |
| Orton | Improvements to A Line | $114,667 |
| Oshawa | Oshawa Civic Complex Renewal and Expansion | $6,483,333 |
| Oshawa | New Building to House the Humane Society of Durham Region | $697,000 |
| Oshawa | Highway 401 - Farewell Creek Bridge | $250,000 |
| Ottawa | Ottawa Convention Centre | $50,000,000 |
| Ottawa | Ottawa Public Transit | $600,000,000 |
| Ottawa | Ottawa Public Library - Alta Vista Branch Retrofit | $250,000 |
| Ottawa | Ottawa Public Library - Cumberland Branch Retrofit | $250,000 |
| Ottawa | Ottawa Public Library - Sunnyside Branch Renovation | $425,000 |
| Ottawa | Structures – Drainage Culverts (1m to 3m) – Prince of Wales Drive Culvert | $66,667 |
| Ottawa | A New Library for Greely | $400,000 |
| Ottawa | Centrepointe Theatre Expansion Project | $4,000,000 |
| Ottawa | Ottawa Chinatown Gateway Project | $125,000 |
| Ottawa | Ottawa Public Library - Vanier Branch Retrofit | $250,000 |
| Ottawa | Terry Fox Drive – Flamborough Rd to Kanata Ave | $15,900,000 |
| Ottawa | Rural Road Upgrades - March Valley Road - Riddell Drive and Klondike Road | $218,000 |
| Ottawa | Rural Road Upgrades - Wilhaven Road to Canaan Road | $80,000 |
| Ottawa | Rural Road Upgrades - Harnett Road (Paden Road to Donnelly Road) | $123,333 |
| Ottawa | Rural Road Upgrades - Paden Road from Settler's Way (West) to Harnett Road | $56,667 |
| Ottawa | Rural Road Upgrades - Third Line Road (South) from Garlock Road to Dilworth Road | $133,333 |
| Ottawa | Rural Road Upgrades - Stone School Road from Grey's Creek Road to West of Bank Street | $40,000 |
| Ottawa | Rural Road Upgrades - O'Toole Road from Innes Road to Wilhaven Road | $140,000 |
| Ottawa | Rural Road Operational Improvements - from Burnt Lands Road - north of March Road to Vaughan Side Road | $110,333 |
| Ottawa | Rural Road Operational Improvements - Cooper Hill Road east of Veena Way to 9th Line Road | $43,333 |
| Ottawa | Rural Road Operational Improvements - Third Line Road South from Prince of Wales Drive to Roger Stevens Drive | $137,333 |
| Ottawa | Rural Road Operational Improvements - Old Almonte Road from Corkery Road adn West of Corkery Road | $66,667 |
| Ottawa | Rural Road Operational Improvements - Northwoods Drive from Dead End to Buckhams Bay | $122,000 |
| Ottawa | Rural Road Operational Improvements - Tranquility Lane from Buckhams Bay Road to Dead End | $51,333 |
| Ottawa | Mer Bleue Road – 500 meters South of Innes to Hydro Corridor | $1,666,666 |
| Ottawa | Pedestrian – Urban Multi-Use Pathways – Industrial Road (OR 30) | $8,333 |
| Ottawa | Pedestrian – Urban Multi-Use Pathways – Woodroffe Pathway Extension | $33,333 |
| Ottawa | Pedestrian – Urban Multi-Use Pathways – Alta Vista Transportation Corridor Pathway | $83,333 |
| Ottawa | Pedestrian – Urban Multi-Use Pathways – Sawmill Creek Pathway Connections | $83,333 |
| Ottawa | Pedestrian – Urban Multi-Use Pathways – Ottawa River Capital Pathway #2 (City-owned section) Improvements | $116,667 |
| Ottawa | Pedestrian – Urban Multi-Use Pathways – Ottawa River Capital Pathway #1 (City-owned section) Improvements | $36,667 |
| Ottawa | Pedestrian - New Sidewalks - Canada Post Transit Link | $48,333 |
| Ottawa | Pedestrian – New Sidewalks – Belfast Road | $70,000 |
| Ottawa | Pedestrian - New Sidewalks - Bronson | $80,000 |
| Ottawa | Pedestrian - New Sidewalks - City Wide | $1,000,000 |
| Ottawa | Pedestrian - New Sidewalks - Coventry Road | $50,000 |
| Ottawa | Pedestrian - Sidewalks - Data Centre Road West | $120,000 |
| Ottawa | Pedestrian - New Sidewalks - Hunt Club - Billy Bishop | $60,000 |
| Ottawa | Pedestrian – Rural Pathways – Prescott Russell Pathway Linkage | $666,667 |
| Ottawa | Pedestrian – Rural Pathways – Prescott Subdivision pathway #1 | $466,667 |
| Ottawa | Pedestrian - New Sidewalks - Hunt Club - Bowesville | $156,667 |
| Ottawa | Pedestrian - New Sidewalks - Eagleson Road | $78,667 |
| Ottawa | Pedestrian - New Sidewalks - Shoreline-Tewsley Transit Link | $41,667 |
| Ottawa | Hazeldean Road Widening | $21,666,666 |
| Ottawa | Sidewalk and Curb Renewal | $172,667 |
| Ottawa | Earl Armstrong Road | $11,666,666 |
| Ottawa | Rural Road Upgrades - Moonstone Road from Cul-de-Sac to Rothbourne | $67,667 |
| Ottawa | Rural Road Upgrades - McCordick Road from Lockhead Road West to Mackey Road | $61,333 |
| Ottawa | Rural Road Upgrades - McCordick Road from Cowell Road to Dilworth Road | $66,000 |
| Ottawa | Rural Road Upgrades - McCordick Road from Dilworth Road to McMullen Road | $27,000 |
| Ottawa | Rural Road Upgrades - Tenth Line Road from South of Navan Road to Smith Road | $42,000 |
| Ottawa | Rural Road Upgrades - Smith Road from Tenth Line Road to Milton Road | $73,667 |
| Ottawa | Rural Road Upgrades - O'Toole Road from Innes Road to French Hill Road | $96,333 |
| Ottawa | Rural Road Upgrades - French Hill Road from O-Toole Road to west of Pleasant View Court | $49,667 |
| Ottawa | Rural Road Upgrades - McCordick Road from Mackey Road to Cowell Road | $95,333 |
| Ottawa | Rural Road Operational Improvements - Armitage Avenue from Greenland to Sumac Hill | $28,333 |
| Ottawa | Rural Road Operational Improvements - Armitage Avenue from Sumac Hill Lane to 440 North of Gill Park Lane | $28,667 |
| Ottawa | Rural Road Operational Improvements - 9th Line Road from Marionville Road to Castor Drive | $100,000 |
| Ottawa | Rural Road Operational Improvements - Old Almonte Road to Northshire Road | $68,333 |
| Ottawa | Pedestrian – St Joseph Blvd Streetscaping | $833,333 |
| Ottawa | Bellevue Manor Community Centre | $26,666 |
| Ottawa | Goulbourn Municipal Office Septic System Reconstruction | $23,333 |
| Ottawa | Resurfacing - Transit Roads and Park & Ride Areas | $190,000 |
| Ottawa | Resurfacing - Transit Roads and Park & Ride Areas | $240,000 |
| Ottawa | Resurfacing - Transit Roads and Park & Ride Areas | $18,333 |
| Ottawa | Transitway Improvement Program - Blair Station | $33,333 |
| Ottawa | Structures – Transit Wall Preservation | $333,333 |
| Ottawa | O-Train Corridor Upgrades | $300,000 |
| Ottawa | Southwest Transitway Extension - Fallowfield to Barrhaven | $17,533,333 |
| Ottawa | Transitway Improvement Program - Core Area | $555,333 |
| Ottawa | Transitway Improvement Program - St Laurent Supervisors Office | $7,500 |
| Ottawa | Transitway Improvement Program - Upper Level of St Laurent Station | $58,333 |
| Ottawa | Transitway Improvement Program - Hurdman Station | $25,000 |
| Ottawa | Baseline Station Tunnel. College Ave Overpass | $12,666,667 |
| Ottawa | Pedestrian Overpass – Woodroffe Ave to Baseline Transit Station | $1,666,667 |
| Ottawa | Structures – Transitway Renew/Replace – Blair Road Ramp | $333,333 |
| Ottawa | Structures – Transitway Renew/Replace – Nicholas Street Ramp | $433,333 |
| Ottawa | Structures – Transitway Renew/Replace – Sackville Road Pedestrian Bridge | $66,667 |
| Ottawa | Transitway Improvement Program - Lighting Program | $25,000 |
| Ottawa | Integrated Road Water and Sewer – Tremblay Road | $1,500,000 |
| Ottawa | Integrated Road Water and Sewer – Stormont Street/Apeldoorn Avenue | $1,333,333 |
| Ottawa | Integrated Road Water and Sewer – Indian Road | $1,666,667 |
| Ottawa | Integrated Road Water and Sewer - 8th Line Road/Lloyd Graham Avenue | $833,333 |
| Ottawa | Integrated Road Water and Sewer – Sussex Drive | $2,000,000 |
| Ottawa | Integrated Road Water and Sewer – Pinewood Crescent | $1,166,667 |
| Ottawa | Integrated Road Water and Sewer – Churchill Avenue | $2,500,000 |
| Ottawa | Integrated Road Water and Sewer – Pleasant Park Road | $1,666,667 |
| Ottawa | Integrated Road Water and Sewer – Sandridge Road | $2,666,667 |
| Ottawa | Integrated Road Water and Sewer – Triole Street | $1,000,000 |
| Ottawa | Integrated Road Water and Sewer – Argyle Ave./Park Ave./Queen Elizabeth Way | $1,666,667 |
| Ottawa | Integrated Road Water and Sewer – Cambridge Street/Jackson Avenue/Frederick Place | $1,000,000 |
| Ottawa | Integrated Road Water and Sewer – Tweedsmuir Avenue | $2,000,000 |
| Ottawa | Hunt Club Road extension to Highway 417 – Phase I | $6,666,667 |
| Ottawa | Reduction of Sewer Overflow | $9,365,000 |
| Ottawa | Strandherd-Armstrong Bridge | $16,000,000 |
| Ottawa | Victoria Island Carbide Mill Masonry Rehabilitation | $1,500,000 |
| Ottawa | Wellspring Ottawa: Cancer Survivorship Centre | $850,000 |
| Ottawa | Construction of the Wabano Cultural and Community Centre | $2,333,333 |
| Ottawa | Ottawa Patro's Infrastructure and Space Modernisation | $405,667 |
| Ottawa | Youth Services Bureau of Ottawa - Investing in better futures for youth | $266,667 |
| Ottawa | Good Companions Centre Renovation at 670 Albert Street | $257,000 |
| Ottawa | The Western Ottawa Community Resource Centre -Expansion and renovation of 2 MacNeil Court | $1,200,000 |
| Ottawa | Rideau Canal Skateway - Replacement of the Existing Public Skateway Facilities | $3,750,000 |
| Ottawa | Vincent Massey Park Improvements | $3,000,000 |
| Ottawa | Hog's Back Park Washroom Pavilion Rehabilitation | $3,000,000 |
| Ottawa | Lady Grey Drive Retaining Wall Rehabilitation | $1,500,000 |
| Ottawa | MacDonald Cartier Bridge / Ottawa Belvedere Wall Rehabilitation | $225,000 |
| Ottawa | Aviation Parkway Rehabilitation | $6,000,000 |
| Ottawa | Rockcliffe Parkway North Retaining Wall Rehabilitation | $6,300,000 |
| Ottawa | Portage Bridge Slab Underside Repairs | $4,050,000 |
| Ottawa | Ottawa River Parkway Bridges Repairs | $1,500,000 |
| Ottawa | Ottawa River Parkway Rehabilitation - Carling to Britannia | $750,000 |
| Ottawa | Major's Hill Park Retaining Wall Stabilization | $450,000 |
| Ottawa | Greenbelt Recreational Pathway Construction - Pine Grove Sector | $1,500,000 |
| Ottawa | Confederation Boulevard Phase I Rehabilitation / St. Patrick. second segment | $1,125,000 |
| Ottawa | Sussex Drive Upgrades | $2,500,000 |
| Ottawa | Renovation of the Bruyère Centre for Immigrants | $375,000 |
| Ottawa | Renovations to the main Britannia clubhouse of the Boys and Girls Club | $410,000 |
| Ottawa | Ottawa Humane Society - construction of a new state-of-the-art shelter and animal hospital | $3,600,000 |
| Ottawa | Highway 417 - Hwy 7 to I/C 163. Ottawa 18.0km | $4,050,000 |
| Owen Sound | Replacement of 9th Street Bridge | $664,035 |
| Owen Sound | Construction of the Owen Sound Multi-Purpose Recreation Facility at Victoria Park | $10,871,860 |
| Owen Sound | Upgrades to Wastewater Treatment in the City of Owen Sound | $15,000,000 |
| Oxford | Old Registry Renovation | $366,666 |
| Oxford | County Road 9 | $562,558 |
| Oxford | County Road 55 Rehabilitation | $463,283 |
| Oxford | County Road 6 Rehabilitation | $397,100 |
| Oxford | Turnkey Renovation | $233,333 |
| Oxford | Ingersoll Water Shop | $233,333 |
| Oxford | County Road 13 Rehabilitation | $304,443 |
| Parry Sound | Improvements to the Bobby Orr Community Centre | $1,049,850 |
| Parry Sound | Reconstruction of Tally Ho - Swords Road | $770,780 |
| Parry Sound | Improvements to District Social Services Buildings | $759,602 |
| Parry Sound | Improvements to South Shore Road | $597,714 |
| Parry Sound | Reconstruction of Cascade Street | $933,333 |
| Parry Sound | Reconstruction of Watermains under James. Gibson and Mary Streets | $1,627,958 |
| Parry Sound District Social Services Administration | Esprit Place Family Centre Accessible Entranceway and Expansion | $82,482 |
| Peace Tree | Rehabilitation of the Peace Tree Sewage in Aweres | $76,230 |
| Peel | Clarkway Drive Trunk Sewer | $1,579,417 |
| Peel | Lionhead Pumping Station. Decommissioning and Gravity Sewer Connection | $500,000 |
| Peel | MEADOWVALE NORTH PUMPING STATION EXPANSION | $2,489,000 |
| Peel | SILVERTHORN PUMPING STATION IMPROVEMENTS AND UPGRADES | $1,090,333 |
| Peel | REPLACEMENT OF ROOF MEMBRANE AT BECKETT SPROULE RESERVOIR | $500,000 |
| Peel | RESERVOIR REHABILITATION PROJECT - EAST BRAMPTON CELLS 1 AND 2 | $333,333 |
| Peel | RESERVOIR REHABILITATION PROJECT - EAST BRAMPTON CELLS 3 AND 4 | $400,000 |
| Peel | RESERVOIR REHABILITATION PROJECT - SILVERTHORN RESERVOIR | $500,000 |
| Peel | Interconnection of Caledon East and Palgrave Water System | $1,394,863 |
| Peel | REPLACEMENT OF OLD WATERMAINS IN THE MISSISSAUGA | $12,262,016 |
| Peel | Replacement of Old Watermains in the Brampton | $8,376,587 |
| Peel | WATER SERVICING FOR THE COMMUNITES OF CAMPBELL'S CROSS AND VICTORIA IN CALEDON | $1,717,100 |
| Peel | Intermodal Sewage Pumping Station Enhancements | $183,334 |
| Peel | Peel Heritage Complex Expansion and Revitalization | $3,333,334 |
| Peel | Road Resurfacing – Airport Road from Steeles Avenue to Queen Street | $1,109,000 |
| Peel | Road Resurfacing - Dixie Road from Highway 401 to Derry Road | $2,241,000 |
| Peel | Road Resurfacing – Cawthra Road from Lakeshore Road to North Service Road | $1,010,334 |
| Peel | Road Resurfacing – Hwy. 50 from Countryside Dr. to Coleraine Dr. | $401,527 |
| Peel | Road Resurfacing – King Street from Creditview Road to Mississauga Road | $143,130 |
| Peel | Road Resurfacing – Mayfield Road from McLaughlin Road to Mississauga Road | $300,000 |
| Peel | Road Resurfacing – on the Forks of the Credit Road from Hurontario Street to approximately 6 km westerly | $1,300,000 |
| Peel | Malton Paramedic Satelite Station | $266,666 |
| Peel | Major Rehabilitation and Repair Works to Municipal Facilities at Copper Road | $425,600 |
| Peel | Police Fleet Garage and Inventory Stores | $3,000,000 |
| Peel | Port Credit Trunk Sewer and Forcemain | $2,944,267 |
| Peel | McVean Drive Trunk Sewer | $1,495,259 |
| Peel | Highway 9 - 2.4km W. of Peel Rd 50 to 1km W. of Peel Rd 7. 7.5 km. resurfacing | $2,000,000 |
| Pelham | Fire Station #2 Replacement (Fenwick) | $990,000 |
| Pelham | Reconstruction of Haist Street | $1,839,633 |
| Pelham | NEC Short Hills Park Visitor Infrastructure Renewal | $20,000 |
| Pembroke | Reconstruction of Barron Canyon Road | $1,000,000 |
| Pembroke | Reconstruction of Pembroke Street West | $899,220 |
| Pembroke | Winter Maintenance and Control Activities Facility | $500,000 |
| Pembroke | Reconstruction of the Downtown Connector in Pembroke | $1,031,062 |
| Penetanguishene | Upgrades to the Philip H Jones Pollution Control Plant | $6,510,703 |
| Penetanguishene | Elevated Water Tower Resurfacing | $125,000 |
| Penetanguishene | Awenda Park Enhanced Trail Viewing Platform and Staircase | $12,500 |
| Penetanguishene | Awenda Park Infrastructure Upgrade | $75,000 |
| Perkinsfield | Replacement of Georgian Sands Watermains | $1,088,817 |
| Perry | Public Works Shop and Office Roof | $14,000 |
| Perth | Replacement of Ennis Road Bridge | $316,667 |
| Perth | Rehabilitation of MacLan Bridge | $201,236 |
| Perth | Renewal of the Last Duel Park | $93,167 |
| Perth | Mitchell EMS Base | $310,000 |
| Perth | Perth Road 135 Rehabilitation | $295,600 |
| Perth | Wilson Street Corridor Rehabilitation | $3,033,333 |
| Perth | Drummond Street West Corridor Rehabilitation | $130,000 |
| Perth | Ontario Heritage Trust - McMartin House - Perth | $250,000 |
| Perth | Ontario Heritage Trust - Inge-Va - Perth | $150,000 |
| Perth | Hwy 23 - Newry to Perth Line 84 | $350,000 |
| Perth East | Library Building Project | $400,000 |
| Perth East | Replacement of Sanitary Sewers | $424,461 |
| Perth South | Rehabilition of Line 29 | $215,600 |
| Perth South | Rehabilitation of Line 6 | $210,000 |
| Perth South | Rehabilitation of Line 26 | $316,050 |
| Petawawa | Russell Street Rehabilitation | $516,063 |
| Petawawa | Gutzman Road Rehabilitation | $93,060 |
| Peterborough | Rehabilitation of Hunter Street Bridge | $4,447,666 |
| Peterborough | Replacement of Deer Bay Bridge | $788,113 |
| Peterborough | Market Hall Restoration Project | $3,228,667 |
| Peterborough | Taylors Bridge Replacement | $366,666 |
| Peterborough | Reconstruction of County Road 20 | $725,295 |
| Peterborough | Peterborough Airport | $7,000,000 |
| Peterborough | Highway 115 - Peterborough Rd. 10 to Hwy 7A | $1,250,000 |
| Petrolia | Rehabilitation of Oil Springs Line | $80,000 |
| Petrolia | West Street Reconstruction | $274,667 |
| Petrolia | Queen/Nelson Street Reconstruction | $713,333 |
| Phelps | Improvements to Songis Road | $99,000 |
| Pickering | Restoration and Upgrades to the Pickering Museum Village | $295,000 |
| Pickering | Reconstruction of Toy Avenue in Pickering | $350,000 |
| Pickering | Fully enclosed pedestrian bridge across Highway 401 between the Pickering GO station and a new transit hub | $5,000,000 |
| Pickering | Downtown Pickering Pedestrian Bridge and Transit Hub | $5,000,000 |
| Pickle Lake | Court House/Town Office/Community Hall/Library Complex | $1,684,097 |
| Picton | Replacement of the Wellington & District Community Centre | $3,949,000 |
| Picton | Sandbanks New Trail | $62,500 |
| Picton | Sandbanks Road Rehabilitation | $350,000 |
| Picton | Sandbanks Picnic Shelter | $50,000 |
| Plummer Additional | Bruce Station Hall Rehabilitation | $11,500 |
| Plummer Additional | Copper Bay Road Hard Surfacing | $29,000 |
| Plummer Additional | Rehabilition of Old Soo Road in Plummer Additional | $198,000 |
| Point Edward | Rehabilitation and Reconstruction of Michigan Avenue | $799,796 |
| Point Edward | Bayview Storm Station Upgrades | $267,400 |
| Point Edward | Alfred Street (from Michigan Ave. to Village of Point Edward/City of Sarnia boundary) | $110,000 |
| Point Pelee | Point Pelee National Park - Enhancement of exhibits and signage | $349,000 |
| Point Pelee | Point Pelee National Park - Replacement of the visitor transit system (truck and passenger units) | $825,000 |
| Point Pelee | Point Pelee National Park - Recapitalization of the main access road and construction of a new bike lane | $1,188,000 |
| Point Pelee | Point Pelee National Park - Recapitalization of the sewage system at the visitor centre | $682,000 |
| Port Burwell | Port Burwell Park Infrastructure | $300,000 |
| Port Carling | Improvements to Port Carling Streetscape | $258,265 |
| Port Colborne | Construction of a Multi-Use Health and Wellness Recreation Centre | $6,866,667 |
| Port Colborne | Soccer Complex Restoration and Rehabilitation | $100,000 |
| Port Colborne | Catharine Street Watermain | $216,667 |
| Port Colbourne | Port Cares Reach Out Centre Renovations | $335,000 |
| Port Elgin | Construction of an Inlet Works Building and Septage Receiving Station | $770,000 |
| Port Elgin | MacGregor Point Shleters | $45,000 |
| Port Elgin | MacGregor Point Park Infrastructure | $322,500 |
| Port Hope | Rehabilitation of the Peter Street Watermain and Improvements to the Road | $729,881 |
| Port Hope | Joint Operations Centre | $1,672,448 |
| Port Hope | Reconstruction of Dorset Street in the Port Hope | $545,000 |
| Port Loring | Improvements to Birchwood Trail | $14,000 |
| Port Perry | Revitalization of the Port Perry Downtown Waterfront | $3,500,000 |
| Powassan | Reconstruction of Memorial Park Drive | $228,899 |
| Powassan | Rehabilitation of Maplehill Bridge | $175,850 |
| Prescott | Fort Wellington National Historic Site - Enhancement and relocation of the gun boat display | $1,100,000 |
| Prescott (Separated) | Sludge Drying Tanks | $260,000 |
| Prescott (Separated) | Prince Street Rehabilitation Program | $400,000 |
| Prescott and Russell | Brisson Bridge Rehabilitation | $528,000 |
| Prescott and Russell | Riverflow Cycling Trail | $1,453,333 |
| Prescott and Russell | Casselman Storm Sewers | $128,333 |
| Prince | Community Centre | $50,000 |
| Prince Edward | Rehabilitation of County Road #25 | $256,666 |
| Prince Edward | Rehabilitation of County Road # 15 | $1,166,666 |
| Prince Edward | Replacing the watermains and sanitary sewers on Queen & Centre Streets | $1,606,667 |
| Puslinch | Township Storage Building | $165,333 |
| Quinte West | Batawa-Frankford Water and Wastewater Development | $1,666,667 |
| Quinte West | Highway 401 - Stockdale Road Overpass | $300,000 |
| Rainy River | Rehabilitation of Atwood Ave. Water and Waste Water Lines | $666,667 |
| Rainy River | Refurbish Public Works Garage/Fire Hall | $140,000 |
| Rainy River | Municipal Office Renewal | $15,000 |
| Ramara | Water Meters | $280,000 |
| Ramara | Improvements to Sideroad 15 & Concession B in Ramara | $323,333 |
| Ramara | Fire Hall #2 Expansion | $400,000 |
| Red Lake | Renewal of the Fifth Street Water Main and Road in Balmertown | $706,640 |
| Red Rock | Installation of Water Meters | $117,333 |
| Red Rock | Lighting Retrofit | $11,667 |
| Red Rock | Boiler Replacement | $26,667 |
| Red Rock | Improvements to the Red Rock Recreation Center | $280,577 |
| Red Rock | Local Road Rehabilitation | $92,503 |
| Red Rock | Upgrades to Wastewater Treatment in Red Rock | $4,500,000 |
| Redditt | Installation of Ultraviolet Treatment Units | $127,710 |
| Redditt | Redditt Waterline - Membrane Filtration | $121,050 |
| Renfrew | Reconstruction Garden of Eden Road | $651,667 |
| Renfrew | Improvements to the Water Distribution System | $320,833 |
| Renfrew | Rehabilitation of the Douglas Community Road Infrastructure | $100,480 |
| Renfrew | Rehabilitation of County Road 515. Palmer Road from Palmer Rapids to Combermere | $366,666 |
| Renfrew | June Street Rehabilitation | $126,666 |
| Renfrew | Road Re-surfacing Project | $160,000 |
| Renfrew | Rehabilitation of County Road 58 in the Renfrew | $533,333 |
| Richards Landing | Fort St Joseph National Historic Site - Recapitalization of the access road | $880,000 |
| Richmond Hill | Eyer Homestead Historical House Restoration | $1,020,000 |
| Richmond Hill | George Forster Historical House and Barn Restoration | $758,666 |
| Richmond Hill | Town-wide Cycling Infrastructure Project | $343,811 |
| Richmond Hill | Elgin Barrow Arena Rehabilitation | $1,356,000 |
| Richmond Hill | Axminster Drive Road Reconstruction | $424,000 |
| Richmond Hill | Leisure Lane Road Reconstruction | $933,000 |
| Richmond Hill | Clairage Drive Road Reconstruction | $1,545,000 |
| Rideau Lakes | South Elmsley Hall Renovation/Addition | $96,500 |
| Rideau Lakes | Rehabilitation of William Street and Mathew Street | $70,564 |
| Rideau Lakes | Rideau Canal National Historic Site - Rehabilitation of a weir (dam) at Jones Falls | $1,100,000 |
| Ripley | Reconstruction of Huron Road | $976,666 |
| Rockland | Improvements to the Hamlet of Bourget Watermain and Roadworks | $602,871 |
| Rockwood | Construction of the Marden Park Recreation Facility | $2,066,517 |
| Rugby | Improvements to Rugby Lake Road | $43,719 |
| Russell | Rebuilt and Surface Treatment Rte 200 | $366,650 |
| Russell | Construction of Russell public library | $600,000 |
| Sables - Spanish Rivers | Hugh Cummings Street Water Main | $85,000 |
| Sables - Spanish Rivers | Public Works Building Rehab & Addition | $131,000 |
| Sables - Spanish Rivers | Replacement of Four Large Culverts | $250,000 |
| Saint-Eugene | Rehabilitation of Bridge Structure No. 5 | $178,907 |
| Sarnia | Wellington Street Reconstruction [Murphy Road to Research Park Drive] | $3,900,000 |
| Sarnia | Pathways Community Therapeutic Pool and Recreation Facility Expansion Project | $593,333 |
| Sarnia | Sarnia YMCA | $425,187 |
| Saugeen Shores | Sanitary Sewer Expansion N/S Saugeen River | $5,893,333 |
| Saugeen Shores | 10th Concession Drainage and Storm Sewer Installation | $403,333 |
| Saugeen Shores | Northshore and Miramichi Bay Road Rehabilitation | $357,500 |
| Sault Ste Marie | Sault Ste Marie National Historic Site - Rehabilitation of lock walls and powerhouse | $2,615,000 |
| Sault Ste. Marie | Reconstructing and Upgrading 3rd Line | $3,558,468 |
| Sault Ste. Marie | New Municipal Building for Algoma Public Health | $7,333,333 |
| Sault Ste. Marie | Hub Trail & Waterfront Walkway Expansion | $1,666,667 |
| Sault Ste. Marie | Community Centre | $50,000 |
| Sault Ste. Marie | Hwy Resurfacing. Algoma Area | $500,000 |
| Scarborough | Construction of the Scarborough Aboriginal Family-Life Centre | $845,180 |
| Schreiber | New Municipal Public Works Garage | $288,733 |
| Schreiber | Resurfacing of Sunset Drive | $40,000 |
| Scugog | Old Simcoe Road Reconstruction Project | $1,353,333 |
| Severn | Fairgrounds Road Upgrade | $200,000 |
| Severn | Highway 400 -Resurfacing of North Bound Lanes from North Junction of Hwy 12 to the Severn River Bridge | $1,100,000 |
| Shannonville | Resurfacing of Callaghan Road | $53,467 |
| Sharon | Sharon Temple Foundation Repair | $284,000 |
| Shelburne | Construction of a Water Treatment Facility and Installation of Water Meters | $1,389,000 |
| Shelburne | CDRC Community Centre Upgrades | $1,000,000 |
| Sherwood Lake | Upgrades to Sherwood Lake Road | $9,000 |
| Shuniah | Grandview Beach Rehabilitation and Asphalt Paving | $325,592 |
| Shuniah | Highway 11/17/61 Safety Initiatives | $1,768,000 |
| Silver Water | Upgrading of Sheshegwaning Access Road | $131,954 |
| Simcoe | Upgrade of the Water Pollution Control Plant | $2,511,655 |
| Simcoe | Rehabilitation of Avening Bridge | $500,000 |
| Simcoe | Improvements to Highway 400 Detour Route -Cty rd 19 | $1,603,333 |
| Simcoe | Archives Expansion | $1,377,833 |
| Simcoe | Improvements to Highway 400 Detour Routes | $333,333 |
| Simcoe | Improvements to Highway 400 Detour Routes - Wilson Dr | $816,666 |
| Simcoe | County Road 44 Improvements - Rama Rd. | $1,666,666 |
| Sioux Lookout | Improvements to the Seventh Avenue Sewer and Road System | $1,235,322 |
| Sioux Lookout | Development of the Sioux Lookout Cultural Centre for Youth and the Arts | $1,300,000 |
| Sioux Narrows | Resurfacing Nestor Falls Airstrip | $830,640 |
| Sioux Narrows - Nestor Falls | Municipal Multi-Use Facility | $165,000 |
| Sioux Narrows Nestor Falls | Construction of the Harbourfront & Interpretive Centre Development in Sioux Narrows | $748,127 |
| Smith - Ennismore - Lakefield | Charles Street Reconstruction | $167,325 |
| Smiths Falls | Preservation of Rideau River Road | $85,333 |
| Smiths Falls (Separated) | Replacement of Streetlighting | $290,000 |
| Smiths Falls (Separated) | Upgrades to the Water Pollution Control Plant | $1,416,667 |
| Smithville | Replacement of South Grimsby Road #18 Bridge | $291,666 |
| Smooth Rock Falls | Wastewater Treatment Plant Upgrades | $112,500 |
| South Algonquin | Madawaska Multi-Purpose Building | $500,000 |
| South Algonquin | Reconstruction of Lake Street in the South Algonquin | $166,667 |
| South Bruce | TEESWATER LIBRARY RENOVATION & ACCESSIBILITY PROJECT | $115,000 |
| South Bruce | Highway 9 - Clifford to Mildmay | $1,000,000 |
| South Bruce Peninsula | Bluewater Park Rehabilitation | $473,549 |
| South Bruce Peninsula | Howdenvale Road & Sunset Drive Roadway Reconstruction & Drainage Improvements | $559,825 |
| South Bruce Peninsula | Side Road 15 Bridge Replacement | $700,000 |
| South Dundas | Wastewater treatment improvements | $9,000,000 |
| South Frontenac | BATTERSEA ROAD | $325,000 |
| South Frontenac | Desert Lake Road | $300,000 |
| South Frontenac | Loughborough Lake Bridge Rehabilitation | $561,733 |
| South Huron | Huron Park Industrial Area Reconstruction | $2,266,666 |
| South Huron | Implementation of a Municipal Flood Diversion System in Exeter | $462,550 |
| South River | Rehabilitation of the South River Library | $166,891 |
| South River | Reconstruction of Boundary Road | $149,997 |
| South River | South River Watermain Replacement and Road Reconstruction | $291,750 |
| South Stormont | Wales Village Water Main Extension | $306,667 |
| South Stormont | South Stormont Town Hall | $904,739 |
| South-West Oxford | Dereham Line (South) | $37,809 |
| South-West Oxford | Foldens Line | $74,710 |
| Southgate | Library & OPP Emergency Services Office | $340,000 |
| Southgate | Renovations to the Dundalk Memorial Park | $167,000 |
| Southwest Middlesex | Ekfrid Community Centre Renovation | $83,333 |
| Southwest Middlesex | Glencoe Fire Hall Replacement | $333,333 |
| Southwest Middlesex | Glencoe Standpipe Replacement | $1,926,833 |
| Southwold | Extension of the Southwold Water Distribution System | $797,167 |
| Southwold | Renovation & Addition to Municipal Office | $168,000 |
| Spanish | Reconstruction of Garnier Road | $386,438 |
| Spanish | DECLERK ROAD | $128,068 |
| Spanish | Shedden Backline | $172,580 |
| Spanish | Rehabilitation of Spanish Public Road in Spanish | $531,020 |
| Spencerville | Development of the Port of Prescott | $10,875,504 |
| Spohn | Rehabilitation of Local Roads in Spohn Township | $42,515 |
| Springwater | Culvert 203 - Rainbow Valley Rd. West | $60,000 |
| Springwater | Culvert 201 - Wilson Drive | $120,000 |
| Springwater | Queen Street East | $533,333 |
| Springwater | Development of Nursery Park in Minesing | $500,000 |
| Sprucedale | Construction of the McMurrich/Monteith Recreation Centre | $150,000 |
| St. Agatha | Construction of a Day Treatment Program Building | $375,000 |
| St. Catharines | Carlisle Street Garage Replacement | $9,333,333 |
| St. Catharines | West Niagara YMCA | $6,000,000 |
| St. Catharines | Emergency Animal Shelter - Veterinary Facility Renovation | $450,000 |
| St. Catherines | Niagara Centre for the Arts and the Recital Hall | $18,000,000 |
| St. Charles | Reclamation of the St.-Charles Landfill | $187,370 |
| St. Charles | Musky Bay Road Re-alignment | $237,009 |
| St. Clements | Improvements to Steffler Road | $332,267 |
| St. Joseph | Parks Rehabilitation Project | $50,000 |
| St. Marys | Construction of a Sludge Treatment and Management Facility | $1,773,333 |
| St. Marys (Separated) | St. Marys Water Tower Re-lining | $66,667 |
| St. Pauls | Rehabilitation of Bridge Structure 67 (Rd. 134) | $115,283 |
| St. Thomas | Rehabilitation of Calton Line | $1,896,957 |
| St. Thomas | Wellington Street Reconstruction | $1,200,000 |
| St. Thomas | St. Thomas Municipal Airport Corporate Hangar | $500,000 |
| St. Thomas | Canada Southern Railway Station Restoration Project | $546,400 |
| Star Lake | Rehabilitation of Star Lake Road in Timmins | $202,772 |
| Stayner | Upgrading Creemore Sewage Plant | $181,333 |
| Stirling | Rehabilitation of Front Street Sanitary Sewer System | $665,373 |
| Stirling - Rawdon | Police/Fire Facility | $1,000,000 |
| Stirling - Rawdon | Water Treatment Plant - Standy Power System | $40,000 |
| Stirling-Rawdon | Reconstruction of Hoards Road (Formerly County Road 8) in Stirling | $830,102 |
| Stone Mills | Municipal Garage | $833,550 |
| Stone Mills | Dewey Road Reconstruction | $633,210 |
| Storm Bay | Improvements to Road | $45,000 |
| Stormont. Dundas & Glengarry | Glengarry Registry Office | $95,780 |
| Stormont. Dundas & Glengarry | Historic Jail Kitchen/Courtyard | $90,000 |
| Straffordville | Rehabilitation of the Bayham Water Distribution System | $720,948 |
| Stratford | Replacement of the Trout Creek Bridge #009013 | $430,667 |
| Stratford | Southside Storm System Downie Pon | $2,722,500 |
| Strathroy | Connection of the Mount Brydges and Area Water System to the Lake Huron System | $873,700 |
| Strathroy - Caradoc | Mount Brydges Sanitary Sewer Servicing | $2,812,794 |
| Strong | Parks/Beaches Beautification Project | $33,333 |
| Strong | Municipal Office Expansion | $116,666 |
| Sudbury | Highway 69 Improvements
| $35,800,000 |
| Sudbury | Science North - Building Interior | $275,000 |
| Sudbury | Science North - Building Exterior | $500,000 |
| Sudbury | Science Centre Infrastructure Renewal | $2,876,140 |
| Sudbury | Nat River Bridge. East of Foleyet | $200,000 |
| Sudbury | Hwy Resurfacing. Sudbury and North Bay Areas | $500,000 |
| Sundridge | Upgrades to Sundridge Wastewater Collection and Treatment | $2,289,700 |
| Sundridge | Replacement and Accommodation of Bailer Unit | $96,164 |
| Sydenham | Improvements to the Water Treatment Facility | $473,333 |
| Tarbutt & Tarbutt Additional | Johnson & Tarbutt Landfill Expansion | $78,650 |
| Tarbutt & Tarbutt Additional | Lakeshore Drive Upgrades | $239,750 |
| Tay | Hogg Valley Road Reconstruction | $834,572 |
| Tay | Improvements to the Port McNicoll WWTP Capacity | $2,708,000 |
| Tay Valley | Upgrade Menzies Munro Side Road | $106,600 |
| Tay Valley | Stanleyville Road Rehabilitation and Improvement | $91,600 |
| Tay Valley | South Sherbrooke Fire Hall | $400,000 |
| Tecumseh | Construction of the Oldcastle Hamlet Wastewater Servicing System | $1,583,333 |
| Tecumseh | St. Alphonse Avenue Reconstruction | $1,255,000 |
| Teeswater | Construction of the Teeswater-Formosa Sanitary Sewer Collection and Treatment System | $6,533,333 |
| Tehkummah | Replacement of Government Road Bridge | $300,000 |
| Tehkummah | Municipal Fire Hall | $110,000 |
| Temagami | Renewal of the Storm Water Management System and Lagoon in Temagami | $333,333 |
| Temiskaming Shores | Haileybury Water Reservoir 1 Replacement | $340,000 |
| Temiskaming Shores | Albert Street Reconstruction | $333,333 |
| Temiskaming Shores | Hwy Resurfacing. New Liskeard and Cochrane Areas | $500,000 |
| Terrace Bay | Retrofitting the St. Martin Catholic School into the Terrace Bay Public Library | $622,520 |
| Terrace Bay | Neys Visitor Centre | $100,000 |
| Thames Centre | Recreation Facilities Expansion Project | $3,223,579 |
| The Archipelago | Waste Management Efficiency Improvements | $227,666 |
| The Archipelago | Healey Lake Road Reconstruction | $1,666,667 |
| The Archipelago | Blackstone/Crane Lake Road Reconstruction | $1,000,000 |
| The Blue Mountains | Beaver River Trail | $166,500 |
| The Blue Mountains | New Town Hall | $2,300,000 |
| The Blue Mountains | Reconstruction to the Plan 915 Water and Sanitary System at Blue Mountain | $1,363,849 |
| The North Shore | Renovations to Municipal Building & New Fire Station | $72,000 |
| Thessalon | Rehabilitation of Government Road Bridge | $350,000 |
| Thornloe | Construction of a Sand & Salt Shed | $57,456 |
| Thorold | Seburn Road Bridge Replacement | $150,000 |
| Thorold | Ormond Street Water & Sewer Improvements Project | $693,000 |
| Thunder Bay | Remediation of Trout Lake Waste Transfer and Recycling Facility | $217,529 |
| Thunder Bay | Rehabilitation of Silver Harbour Road and Drive | $111,213 |
| Thunder Bay | Improvements to Hicks Lake Road Safety | $70,000 |
| Thunder Bay | Prince Arthur’s Landing at Marina Park – Phase 1 | $14,650,000 |
| Thunder Bay | Mary J.L. Black Library Renewal | $1,370,000 |
| Thunder Bay | Spruce River Bridge on Black Sturgeon Road | $250,000 |
| Thunder Bay | South Trout Creek Bridge. West of Nipigon | $2,000,000 |
| Thunder Bay | McGraw Falls Bridge on Shabaqua Road | $300,000 |
| Thunder Bay | Pukaskwa National Park - Recapitalization of visitor day use and access facilities | $485,000 |
| Tillsonburg | Reconstruction of Concession Street - Quarterline Road | $515,824 |
| Tillsonburg | Lisgar Ave and Fourth Street Reconstruction | $675,000 |
| Timmins | Replacement of Barbers Bay Bridge | $1,873,333 |
| Timmins | Upgrades to Wastewater Treatment in Timmins | $19,833,333 |
| Tiny | Blam Beach Road Improvements | $113,646 |
| Tiny | Redevelopment of the Lafontaine Pavilion in Perkinsfield | $220,000 |
| Tobermory | Bruce Peninsula NP & Fathom Five NMCA - Recapitalization of the visitor centre roof | $220,000 |
| Toronto | GO Transit | $250,000,000 |
| Toronto | Toronto York Spadina Subway Extension | $622,000,000 |
| Toronto | Sheppard East Light Rail Transit Line | $333,000,000 |
| Toronto | Revitalization of Union Station | $133,000,000 |
| Toronto | Yonge-Dundas Square Permanent Storage Facility | $66,667 |
| Toronto | Todmorden Mills Heritage Museum and Arts Centre | $423,000 |
| Toronto | Sidewalks | $2,666,667 |
| Toronto | Don Valley Parkway Resurfacing | $333,333 |
| Toronto | Lakeshore Resurfacing | $103,635 |
| Toronto | Gardiner Resurfacing | $563,032 |
| Toronto | Deanewood Pedestrian Bridge Rehabilitation | $206,897 |
| Toronto | Bloor-Islington Bridge Rehabilitation | $344,828 |
| Toronto | Mount Pleasant Bridge Rehabilitation | $413,793 |
| Toronto | Gardiner Road Bridge Rehabilitation | $206,897 |
| Toronto | Gardiner-Bathurst/Strachan Bridge Rehabilitation | $827,586 |
| Toronto | Steeles Avenue Resurfacing | $5,000,000 |
| Toronto | Major Road Reconstruction/ Resurfacing Finch Ave E | $168,667 |
| Toronto | Major Road Reconstruction / Resurfacing - Eglinton Ave E | $38,000 |
| Toronto | Major Road Reconstruction / Resurfacing - Leslie St | $177,667 |
| Toronto | Major Road Reconstruction/ Resurfacing - Don Mills Rd | $19,333 |
| Toronto | Major Road Reconstruction / Resurfacing Finch Ave 2 | $321,333 |
| Toronto | Major Road Reconstruction / Resurfacing - Yonge St | $557,000 |
| Toronto | Major Road Reconstruction / Resurfacing - Empress Ave | $19,000 |
| Toronto | Major Road Reconstruction / Resurfacing - Lawrence Ave | $556,333 |
| Toronto | Major Road Reconstruction / Resurfacing - Millwood Rd | $142,667 |
| Toronto | Major Road Reconstruction / Resurfacing - Victoria Park Ave | $3,000,000 |
| Toronto | Laneways Projects - Bellevue | $26,667 |
| Toronto | Laneways Projects - Weston | $23,667 |
| Toronto | Laneways Projects - Corbet | $116,667 |
| Toronto | Laneways Projects - Humber | $14,333 |
| Toronto | Laneways Projects - Jane | $6,333 |
| Toronto | Laneways Projects - Ascott | $14,333 |
| Toronto | Laneways Projects - Miller | $46,000 |
| Toronto | Laneways Projects - Dufferin | $46,000 |
| Toronto | Laneways Projects - Lindner | $11,333 |
| Toronto | Laneways Projects - Hepbourne | $5,200 |
| Toronto | Laneways Projects - Dovercourt A | $25,667 |
| Toronto | Laneways Projects - Dovercourt B | $5,000 |
| Toronto | Laneways Projects - Argyle | $18,667 |
| Toronto | Laneways Projects - Chesley | $17,667 |
| Toronto | Laneways Projects - Brock | $15,667 |
| Toronto | Laneways Projects - Argyle (2) | $14,333 |
| Toronto | Laneways Projects - College | $10,000 |
| Toronto | Laneways Projects - College B | $41,333 |
| Toronto | Laneways Projects - College C | $5,667 |
| Toronto | Laneways Projects - Delaware | $9,333 |
| Toronto | Laneways Projects - Bloor A | $16,667 |
| Toronto | Laneways Projects - Bloor B | $7,667 |
| Toronto | Laneways Projects - Tichester | $24,333 |
| Toronto | Laneways Projects - Spadina | $16,667 |
| Toronto | Laneways Projects - Eglinton | $33,000 |
| Toronto | Laneways Projects - Scrivener | $23,333 |
| Toronto | Laneways Projects - Price | $18,333 |
| Toronto | Local Road Resurfacing - Abigail Place | $11,104 |
| Toronto | Laneways Projects - Yonge | $7,000 |
| Toronto | Local Road Resurfacing - Allanhurst Drive | $285,656 |
| Toronto | Laneways Projects - Gerrard | $14,000 |
| Toronto | Local Road Resurfacing - Ardell Avenue | $20,839 |
| Toronto | Laneways Projects - Hastings | $20,333 |
| Toronto | Laneways Projects - Harriet | $6,667 |
| Toronto | Local Road Resurfacing - Ashdean Drive | $48,978 |
| Toronto | Laneways Projects - Gerrard A | $8,667 |
| Toronto | Local Road Resurfacing - Attwell Drive South | $106,564 |
| Toronto | Laneways Projects - Gerrard B | $8,667 |
| Toronto | Local Road Resurfacing - Bannatyne Drive | $266,813 |
| Toronto | Local Road Resurfacing - Batterswood Drive | $57,953 |
| Toronto | Local Road Resurfacing - Bellechasse Street | $30,117 |
| Toronto | Local Road Resurfacing - Bethridge Road | $327,199 |
| Toronto | Local Road Resurfacing - Blackburn Street | $22,897 |
| Toronto | Local Road Resurfacing - Blythwood Road | $121,989 |
| Toronto | Local Road Resurfacing - Bowater Drive | $55,671 |
| Toronto | Local Road Resurfacing - Brazil Gate | $6,388 |
| Toronto | Local Road Resurfacing - Buttercup Court | $136,519 |
| Toronto | Local Road Resurfacing - Cabana Drive | $137,657 |
| Toronto | Local Road Resurfacing - Calora Court | $38,278 |
| Toronto | Local Road Resurfacing - Cardwell Avenue | $50,289 |
| Toronto | Local Road Resurfacing - Castledene Crescent | $57,953 |
| Toronto | Local Road Resurfacing - Cheatham Place | $66,951 |
| Toronto | Local Road Resurfacing - Clarion Road | $67,509 |
| Toronto | Local Road Resurfacing - Cliffcrest Crescent | $78,272 |
| Toronto | Local Road Resurfacing - Cliffcrest Drive | $90,199 |
| Toronto | Local Road Resurfacing - Cliffcrest Drive (2) | $48,310 |
| Toronto | Local Road Resurfacing - Coxworth Crescent | $55,671 |
| Toronto | Local Road Resurfacing - Cranston Road | $20,063 |
| Toronto | Local Road Resurfacing - Cushendun Road | $50,535 |
| Toronto | Local Road Resurfacing - Dimplefield Place | $50,956 |
| Toronto | Local Road Resurfacing - Dowry Street | $90,510 |
| Toronto | Local Road Resurfacing - Duncanwoods Drive | $48,649 |
| Toronto | Local Road Resurfacing - Dunlace Drive | $63,206 |
| Toronto | Local Road Resurfacing - Dunsany Crescent | $63,733 |
| Toronto | Local Road Resurfacing - Ealing Drive | $57,801 |
| Toronto | Local Road Resurfacing - Earlscourt Avenue | $69,556 |
| Toronto | Local Road Resurfacing - Elliotwood Court | $22,816 |
| Toronto | Local Road Resurfacing - Evansway Street | $40,277 |
| Toronto | Local Road Resurfacing - Firestone Road | $40,612 |
| Toronto | Local Road Resurfacing - Forestbrook Crescent | $46,393 |
| Toronto | Local Road Reconstruction - Arnold | $36,667 |
| Toronto | Local Road Resurfacing - Geary Avenue | $124,312 |
| Toronto | Local Road Reconstruction - Berwick | $83,333 |
| Toronto | Local Road Resurfacing - Givendale Road | $44,111 |
| Toronto | Local Road Reconstruction - Eastwood | $317,000 |
| Toronto | Local Road Resurfacing - Glenridge Road | $48,674 |
| Toronto | Local Road Reconstruction - Jeanette | $104,667 |
| Toronto | Local Road Resurfacing - Goodless Court | $27,836 |
| Toronto | Local Road Reconstruction - Ontario | $191,333 |
| Toronto | Local Road Reconstruction - Primrose | $20,333 |
| Toronto | Local Road Reconstruction - Superior | $26,333 |
| Toronto | Local Road Reconstruction - Towns | $34,667 |
| Toronto | Local Road Reconstruction - Verwood | $185,667 |
| Toronto | Local Road Resurfacing - Gordon Park Drive | $24,820 |
| Toronto | Local Road Resurfacing - Goskin Court | $42,238 |
| Toronto | Local Road Resurfacing - Hollingworth Drive | $48,674 |
| Toronto | Local Road Resurfacing - Humber Summit Lane | $54,758 |
| Toronto | Local Road Resurfacing - Husband Drive | $8,918 |
| Toronto | Local Road Resurfacing - Ingleport Place | $8,992 |
| Toronto | Local Road Resurfacing - Kelsonia Avenue | $131,465 |
| Toronto | Local Road Resurfacing - La Peer Boulevard | $97,348 |
| Toronto | Local Road Resurfacing - Landry Avenue | $23,120 |
| Toronto | Local Road Resurfacing - Larchmere Avenue | $36,784 |
| Toronto | Local Road Resurfacing - Latton Road | $15,085 |
| Toronto | Local Road Resurfacing - Littledean Court | $42,238 |
| Toronto | Local Road Resurfacing - Lofthouse Square | $70,296 |
| Toronto | Local Road Resurfacing - Lyndford Drive | $70,882 |
| Toronto | Local Road Resurfacing - MacDuff Crescent | $53,389 |
| Toronto | Local Road Resurfacing - Maitland Street | $128,681 |
| Toronto | Local Road Resurfacing - Marilyn Avenue | $52,496 |
| Toronto | Local Road Resurfacing - Merrygale Crescent | $52,933 |
| Toronto | Local Road Resurfacing - Midcroft Drive | $37,221 |
| Toronto | Local Road Resurfacing - Millport Drive | $5,551 |
| Toronto | Local Road Resurfacing - Mountstephen Street | $36,810 |
| Toronto | Local Road Resurfacing - Munro Street | $128,588 |
| Toronto | Local Road Resurfacing - Navenby Crescent | $28,115 |
| Toronto | Local Road Resurfacing - Osterhout Place | $32,399 |
| Toronto | Local Road Resurfacing - Palmer Avenue | $178,460 |
| Toronto | Local Road Resurfacing - Penn Drive | $37,863 |
| Toronto | Local Road Resurfacing - Zealand | $24,489 |
| Toronto | Local Road Resurfacing - Peterlee Avenue | $38,179 |
| Toronto | Local Road Resurfacing - Yorkshire | $46,393 |
| Toronto | Local Road Resurfacing - Woodsworth | $74,532 |
| Toronto | Local Road Resurfacing - Prairie Drive | $27,259 |
| Toronto | Local Road Resurfacing - Wicklow | $88,070 |
| Toronto | Local Road Resurfacing - Westwater | $76,424 |
| Toronto | Local Road Resurfacing - Primrose Avenue | $73,011 |
| Toronto | Local Road Resurfacing - Waterbury | $99,326 |
| Toronto | Local Road Resurfacing - Vickson | $98,505 |
| Toronto | Local Road Resurfacing - Primula Crescent | $23,231 |
| Toronto | Local Road Resurfacing - Randall Crescent | $201,427 |
| Toronto | Local Road Resurfacing - Vanderbrent | $55,519 |
| Toronto | Local Road Resurfacing - VanCamp | $55,060 |
| Toronto | Local Road Resurfacing - Ranstone Gardens | $146,028 |
| Toronto | Local Road Resurfacing - Tremont | $46,520 |
| Toronto | Local Road Resurfacing - Ravencliff Crescent | $67,231 |
| Toronto | Local Road Resurfacing - Redcar Avenue | $85,437 |
| Toronto | Local Road Resurfacing - Redcastle Crescent | $100,315 |
| Toronto | Local Road Resurfacing - Reidmount Avenue | $171,962 |
| Toronto | Local Road Resurfacing - Richbourne Court | $70,352 |
| Toronto | Local Road Resurfacing - Robinson Avenue | $81,073 |
| Toronto | Local Road Resurfacing - Robintide Crescent | $34,695 |
| Toronto | Local Road Resurfacing - Rubydale Gardens | $46,462 |
| Toronto | Local Road Resurfacing - Sanctbury Place | $46,849 |
| Toronto | Local Road Resurfacing - Sombrero Court | $47,973 |
| Toronto | Local Road Resurfacing - Stubbs Drive | $53,998 |
| Toronto | Local Road Resurfacing - Superior Avenue | $41,824 |
| Toronto | Local Road Resurfacing - Swansdown Drive | $41,829 |
| Toronto | Local Road Resurfacing - Tayrow Road | $8,620 |
| Toronto | Local Road Resurfacing - Tinbury Place | $46,135 |
| Toronto | 157 King St. E Roof Replacement | $120,000 |
| Toronto | 40 College St. Recaulk Exterior Cladding Panels | $111,667 |
| Toronto | 150 Disco Road Asphalt Pavement | $666,667 |
| Toronto | 2222 Eglinton Ave. E. Asphalt Re-pavement | $178,333 |
| Toronto | DeepLake Water Cooling - Front Street | $588,333 |
| Toronto | Salt Management Facilities | $666,667 |
| Toronto | Salt Management Facilities | $666,667 |
| Toronto | Toronto Police 11 Division - Central Lockup | $9,693,000 |
| Toronto | Fairview Library Project | $300,000 |
| Toronto | North York Central Reference Library Project | $366,667 |
| Toronto | Northern District Library Project | $316,667 |
| Toronto | Agincourt Library Project | $270,000 |
| Toronto | Richview Library Project | $166,667 |
| Toronto | EMS - Station Refurbishment - Northeast District Office. | $190,000 |
| Toronto | EMS Station Refurbishment - Station -11 | $283,333 |
| Toronto | EMS Station Refurbishment - Station 28 | $366,667 |
| Toronto | EMS Station Refurbishment - Station 38 | $366,667 |
| Toronto | EMS Station 41 - Replacement | $756,333 |
| Toronto | EMS Station #44 Expansion | $153,333 |
| Toronto | EMS Station 19 -Rebuild | $701,333 |
| Toronto | EMS Station 40 - Rebuild and Expansion | $1,033,333 |
| Toronto | EMS Station 1 - Demolish and Rebuild | $766,667 |
| Toronto | Exhibition Place - Automotive Building Restoration | $1,105,000 |
| Toronto | Exhibition Place - Princes' Gates Restoration | $2,166,000 |
| Toronto | Exhibition Place - Better Living Centre Upgrades | $1,768,000 |
| Toronto | Exhibition Place - Coliseum Complex - Partial Roof Replacement | $1,943,333 |
| Toronto | Exhibition Place - Horse Palace Roof Replacement | $700,000 |
| Toronto | Exhibition Place - Coliseum Complex - Industry Building - Window & Roof | $955,000 |
| Toronto | Exhibition Place - Direct Energy Centre - Interior Infrastructure & Bus Duct at Halls | $401,667 |
| Toronto | Transportation Facility Improvements - North York | $412,698 |
| Toronto | Transportation Facilities Improvements - Ellesmere Yard | $924,641 |
| Toronto | Transportation Facilities Improvements - Etobicoke York District | $19,652 |
| Toronto | Transportation Facilities Improvements - Toronto District | $809,675 |
| Toronto | Exhibition Place - Press Building | $85,000 |
| Toronto | Stephen Leacock Community Centre - Redevelopment | $1,066,500 |
| Toronto | Toronto Police Services - 14 Division - Central Lockup | $8,680,000 |
| Toronto | Lynngate Park - Trails & Pathways | $28,333 |
| Toronto | Habitant Park - Trails & Pathways | $26,667 |
| Toronto | Etobicoke Valley Park - Trails & Pathways | $38,333 |
| Toronto | Berry Road Park - Trails & Pathways | $30,000 |
| Toronto | Maryvale Park & Fieldhouse - Trails & Pathways | $40,000 |
| Toronto | Port Royal Park - Trails & Pathways | $30,000 |
| Toronto | Morningside Park -Trails & Pathways | $116,667 |
| Toronto | Wedgewood Park - Trails & Pathways | $13,333 |
| Toronto | Scarbourough Heights Park - Trails & Pathways | $13,333 |
| Toronto | Inglewood Heights Park - Trails & Pathways | $26,667 |
| Toronto | Rouge Beach Park - Trails & Pathways | $100,000 |
| Toronto | Driftwood Park - Trails & Pathways | $30,000 |
| Toronto | Harvest Moon Park - Trails & Pathways | $31,667 |
| Toronto | Rennie Park - Trails & Pathways | $38,333 |
| Toronto | Clanton Park - Trails & Pathways | $38,333 |
| Toronto | Manhattan Park - Trails & Pathways | $18,333 |
| Toronto | L'Amoureaux Community Centre North - Trails & Pathways | $46,667 |
| Toronto | Confederation Park - Trails & Pathways | $30,000 |
| Toronto | Chalkfarm Park - Trails & Pathways | $76,667 |
| Toronto | Anewan Greenbelt - Trails & Pathways | $18,333 |
| Toronto | Woodford Park - Trails & Pathways | $18,333 |
| Toronto | West Deane Park North - Trails & Pathways | $116,667 |
| Toronto | Bloordale Park North - Trails & Pathways | $41,667 |
| Toronto | Albion Gardens Park - Trails & Pathways | $41,667 |
| Toronto | Rouge Valley Park / Glen Rouge Campground - Trails & Pathways | $35,000 |
| Toronto | Guildwood Park / Guild Inn - Trails & Pathways | $116,667 |
| Toronto | Birchmount Stadium Park - Trail & Pathways | $53,333 |
| Toronto | Lavery Trail Park - Trails & Pathways | $13,333 |
| Toronto | Fundy Bay Park - Trails & Pathways | $46,667 |
| Toronto | Toronto Island - Main Road Resurfacing | $100,000 |
| Toronto | East Don Trail | $715,000 |
| Toronto | Leaside Park | $66,667 |
| Toronto | R.V. Burgess Park | $26,667 |
| Toronto | Nesbitt Park | $33,333 |
| Toronto | Wheel Trans Facility Renewal | $1,597,333 |
| Toronto | Subway Escalator/Elevator Overhaul | $2,266,583 |
| Toronto | Warden Subway Station Redevelopment - Phase 1 | $4,000,000 |
| Toronto | Birchmount Bus Garage Repair Bay Modifications | $2,400,333 |
| Toronto | Subway Track Renewal | $1,590,667 |
| Toronto | Station modernization program | $7,139,000 |
| Toronto | Bus Garage / Shops Facility Renewal Program | $1,621,333 |
| Toronto | Carhouse Modifications | $1,275,000 |
| Toronto | Subway Carhouse /Shop/SRT* Facility Renewal Program | $3,520,000 |
| Toronto | TTC - On-Grade Paving Rehabilitation Program | $3,968,333 |
| Toronto | TTC - Easier Access Phase III | $7,376,917 |
| Toronto | TTC - Structural Paving Rehabilitation | $1,157,667 |
| Toronto | TTC - Bridges/Structures Maintenance Program | $1,418,000 |
| Toronto | TTC - Bridge and Tunnels | $4,459,833 |
| Toronto | TTC - Facilities Roofing Rehabilitation Program | $3,922,667 |
| Toronto | TTC - Streetcar Overhead Distribution System Upgrade | $2,545,167 |
| Toronto | TTC - Victoria Park Bus Terminal Replacement | $7,582,333 |
| Toronto | TTC - Kipling Station Improvements - East Entrance and Passenger Pick-up and Drop-Off (PPUDO) | $2,683,333 |
| Toronto | TTC - Streetcar Supporting Infrastructure Upgrade | $534,667 |
| Toronto | Bermondsey Yard | $400,000 |
| Toronto | Ingram Yard | $400,000 |
| Toronto | Yonge Yard | $333,333 |
| Toronto | Expansion of Landfill Gas Collection System at Green Lane Landfill | $337,000 |
| Toronto | Expansion of Leachate Control System at Green Lane Landfill | $1,528,000 |
| Toronto | Installation of Stormwater Management Pond 6 and Upgrade Pond 3 Pump Station at Green Lane Landfill | $201,000 |
| Toronto | Covered Bunkers - Bermondsey Transfer Station - One for Leaf and Yard Waste and one for a Reuse Centre | $483,333 |
| Toronto | Spadina-Wellington Trunk Watermain Improvements | $2,000,000 |
| Toronto | Emergency Repair of Coxwell Sanitary Sewer | $13,000,000 |
| Toronto | Coatsworth Cut Water Quality Improvements | $2,333,333 |
| Toronto | Eastern Beaches Water Quality Improvements | $2,500,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Aldergrove | $29,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Aldridge | $31,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Barker | $9,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Bastedo | $100,833 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Broadview | $87,500 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Browning | $70,833 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Butternut | $9,167 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Alexdon Rd | $138,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Cambridge Ave | $64,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Canning Ave | $6,000 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Allanford Rd | $366,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Carlaw Ave | $85,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Cedar Ave | $10,833 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Armitage Dr | $101,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Chester Ave | $53,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Chester Hill Rd | $38,333 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Ashbourne Dr | $351,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Copeland Ave | $14,167 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Bathurst St | $1,716,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement -Coxwell Ave | $47,500 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Bayview Ave | $866,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Crown Park | $6,667 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Bayview Ridge | $102,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement -Cruikshank | $5,833 |
| Toronto | Downtown Toronto Lead Water Service Replacement -Currie Ave | $10,833 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Botfield Ave | $366,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Danforth | $104,167 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Budea Cres | $108,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Dartford | $5,833 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Charleston Rd | $185,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Dilworth | $12,500 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Charlotte St | $125,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Doncrest | $5,800 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Christina Cres | $223,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Drayton | $86,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Duart Park | $12,500 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Colville Rd | $211,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Earl Haig | $20,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Ellerbeck | $45,833 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Ferrier | $65,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Fulton | $75,833 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Glebemount | $30,833 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Gough | $56,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Hammersmith | $25,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Hanson | $65,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Hillingdon | $55,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Isleworth | $19,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Jackman | $29,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Logan | $112,500 |
| Toronto | Downtown Toronto Lead Water Service Replacement | $15,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Mendel | $12,500 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Merrill | $37,500 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Milverton | $129,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Moberley | $47,500 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Mortimer | $117,500 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Coxwell Ave | $623,333 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Crocus Dr | $315,000 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Crouse Rd | $83,333 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Densley Ave | $210,000 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Edenbridge Rd | $273,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Murdock | $19,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Nealon | $34,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Ozark | $8,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Pape | $135,833 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Playter | $44,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Pretoria | $20,833 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Queensdale | $120,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Roseheath | $61,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Sammon | $132,500 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Springdale | $123,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Spruce Hill | $49,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Thorncliffe | $26,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - West Lynn | $48,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Wineva | $45,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Woodbine | $151,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Woodington | $39,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Woodmount | $33,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Woodrow | $50,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Admiral | $26,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Albany | $55,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Alexdon | $18,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Armitage | $39,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Ashbourne | $115,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Avenue Rd | $11,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Aylesworth | $28,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Bartlett | $38,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Bathurst | $224,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Bayview | $12,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Bayview Ridge | $10,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Beaumont | $17,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Bloor St W | $293,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Botfield | $82,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Boultbee | $46,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Bowden | $32,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Brian Cliff | $23,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Briar Hill | $61,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Budea | $21,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Burnhamthorpe | $38,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Byron | $15,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Carthage | $19,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Charles | $10,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Charleston | $39,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Charleston Rd | $25,000 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Finch Ave | $838,333 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Finch Ave E | $166,667 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Haliburton Ave | $233,333 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Keele St | $863,333 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Lawrence Ave | $195,000 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Milford Ave | $125,000 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Modern Rd | $83,000 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Norfinch St | $742,000 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Oxley St | $93,333 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Prennan Ave | $158,333 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Ridgemount Rd | $184,000 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Signet Dr | $240,000 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Underwriters Rd | $306,667 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Valley Rd | $185,667 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Victoria Park Ave | $700,000 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Victoria St | $1,000,000 |
| Toronto | Replacement of Vintage Cast Iron Watermains - Yonge St | $850,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Charlotte | $12,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Chine | $52,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Claremore | $113,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Colville | $24,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Condor | $74,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Connaught | $34,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Coxwell | $137,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Crocus | $85,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Daystrom | $26,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Densley | $28,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Dufferin | $32,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Dundas | $90,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Earl Grey | $52,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Eastern | $13,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Edenbridge | $40,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Finch | $19,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Finch Ave | $46,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Foxbar | $32,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Front | $42,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Gemini | $39,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Gibson | $44,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Glen Rd | $37,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Grange | $12,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Haliburton | $22,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Howland | $36,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Jasmine | $13,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Jeanette | $23,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Keele | $100,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - King | $52,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Kingston Rd | $37,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Kirkhams | $127,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Langley | $22,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Lanyard | $110,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Arlington | $170,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Atlas | $133,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Balliol | $40,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Balsam | $5,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Beaufort | $45,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Belsize | $25,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Benson | $48,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Braemore | $21,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Brownlow | $21,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Burnside | $23,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Cavendish | $23,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Cherrywood | $37,500 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Christie | $45,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Constance | $55,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Eglinton | $100,000 |
| Toronto | North York Community Basement Flooding Relief - Cactus Ave | $233,333 |
| Toronto | North York Community Basement Flooding Relief - Caines Ave | $633,333 |
| Toronto | North York Community Basement Flooding Relief - Commons Dr | $66,667 |
| Toronto | North York Community Basement Flooding Relief - Connaught Ave | $833,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Ellsworth | $65,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Falcon | $35,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Garden | $48,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Geoffrey | $51,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Glen Ames | $33,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Glen Manor | $28,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Glen Manor W | $15,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Glen Stewart | $40,833 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Glendale | $45,833 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Greensides | $48,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Grenadier | $51,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Helena | $55,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Hendrick | $25,833 |
| Toronto | Downtown Toronto Lead Water Service Replacement - High Park | $32,500 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Hillsdale E | $109,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Hillsdale | $43,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Hocken | $40,833 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Indian A | $30,833 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Indian B | $36,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Kenwood | $91,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement -Leonard | $8,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Long | $31,500 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Manor | $87,500 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Marmot | $29,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Merton | $60,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement -Parkdale | $27,500 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Petman | $35,833 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Pine | $47,833 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Pinewood | $59,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Rushton | $145,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Lawrence | $19,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Soudan | $274,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Lindylou | $91,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Southwood | $66,500 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Milford | $21,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Sunnyside | $29,167 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Milner | $11,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Taunton | $36,667 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Norfinch | $61,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Vaughan | $133,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Ossington | $66,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Prennan | $32,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Westminister | $47,500 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Pricefield | $45,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Williamson | $26,833 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Ridgemount | $63,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Winona | $53,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Roxborough | $24,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Winthorpe | $13,333 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Shamrock | $11,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Wright | $50,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Signet | $28,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Wychwood | $25,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Strathcona | $14,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Underwriters Rd | $11,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Victoria Park | $62,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Victoria St | $30,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Wilson | $278,000 |
| Toronto | Downtown Toronto Lead Water Service Replacement - Yonge | $144,000 |
| Toronto | North York Community Basement Flooding Relief - Demaris Ave | $166,667 |
| Toronto | North York Community Basement Flooding Relief - Driftwood Ave | $166,667 |
| Toronto | North York Community Basement Flooding Relief - Farmcrest Dr | $133,333 |
| Toronto | North York Community Basement Flooding Relief - Finch Ave | $833,333 |
| Toronto | North York Community Basement Flooding Relief - Fontainebleu Dr | $666,667 |
| Toronto | North York Community Basement Flooding Relief - Gustav Cr | $33,333 |
| Toronto | North York Community Basement Flooding Relief - Homewood Ave | $2,083,333 |
| Toronto | North York Community Basement Flooding Relief - Hoover Cres | $270,000 |
| Toronto | North York Community Basement Flooding Relief - Leith Hill Rd | $250,000 |
| Toronto | North York Community Basement Flooding Relief - Meadowacres Dr | $300,000 |
| Toronto | North York Community Basement Flooding Relief - Northwood Dr. | $200,000 |
| Toronto | North York Community Basement Flooding Relief - Patricia Ave | $833,333 |
| Toronto | North York Community Basement Flooding Relief - Rockford Rd | $100,000 |
| Toronto | North York Community Basement Flooding Relief - St. Paschat Ct | $30,000 |
| Toronto | North York Community Basement Flooding Relief - Steeles Ave E | $600,000 |
| Toronto | North York Community Basement Flooding Relief - Sunnycrest Rd | $150,000 |
| Toronto | North York Community Basement Flooding Relief - Tanner Ct | $66,667 |
| Toronto | North York Community Basement Flooding Relief - Tobruk Cr | $33,333 |
| Toronto | North York Community Basement Flooding Relief - Topcliff Ave | $250,000 |
| Toronto | North York Community Basement Flooding Relief - Godstone Rd | $1,066,667 |
| Toronto | Redevelopment of Maple Leaf Gardens | $20,000,000 |
| Toronto | Construction of a new arts and cultural centre in Regent Park | $12,000,000 |
| Toronto | Toronto's Ronald McDonald House | $8,680,139 |
| Toronto | Bathurst-Finch Community Hub: A United Way Toronto Initiative | $1,000,000 |
| Toronto | Renovations to Interval House | $250,000 |
| Toronto | Multi-Sport/Activity Indoor Centre | $1,325,263 |
| Toronto | Moorelands Camp 100 Anniversary Build | $255,546 |
| Toronto | Construction of the Braeburn Active Living Centre | $250,000 |
| Toronto | Native Men's Residence - 14 Vaughan Road Renovation | $450,000 |
| Toronto | Woodgreen Seniors Community Facility Renovation | $700,000 |
| Toronto | COSTI Immigrant Services - Reception Centre Improvement | $1,000,000 |
| Toronto | YMCA Camp Pine Crest Building Renewal | $1,400,000 |
| Toronto | Children's Aid Society of Toronto - Renovation to the Children's Visitation Centre | $633,333 |
| Toronto | Fred Victor Community Services Centre Renovation | $1,100,599 |
| Toronto | Three new galleries at the Royal Ontario Museum (ROM) | $2,750,000 |
| Toronto | Widening of the Bloor Street Bridge | $1,250,000 |
| Toronto | Renovations of a building owned and operated by Covenant House | $627,500 |
| Toronto | Renovations of a building owned and operated by the Yonge Street Mission | $465,000 |
| Toronto | Toronto Reference Library Revitalization Project | $3,000,000 |
| Toronto | Weston Family Learning Centre | $7,500,000 |
| Toronto | Canada Initiative at the ROM | $2,750,000 |
| Toronto | Canadian Film Centre | $3,250,000 |
| Toronto | Capital Restoration | $627,500 |
| Toronto | Regent Park Arts & Cultural Centre | $12,000,000 |
| Toronto | Renovation of existing YSM infrastructure | $465,000 |
| Toronto | Allandale Station Tunnel and Stairway | $700,000 |
| Toronto | Highway 401 - Dixie Road Bridge | $300,000 |
| Toronto | Hwy 401 - Renforth Road | $325,000 |
| Toronto | Widening of the Brock Street Bridge | $1,100,000 |
| Toronto | Widening of the Dufferin Street Bridge | $1,700,000 |
| Toronto | Widening of the Dupont Street Bridge | $1,250,000 |
| Toronto | Widening of the Lansdowne Avenue Bridge | $1,500,000 |
| Toronto | Widening of the Queen Street Bridge | $1,500,000 |
| Toronto | Subway Tunnel Rehabilitation | $3,363,000 |
| Toronto | Art Gallery of Ontario – Weston Family Learning Centre | $7,500,000 |
| Trent Hills | Sewer Separation and Infrastructure Improvements at Oliver/Isabella/Major | $476,667 |
| Trent Hills | Watermain Replacement-Hastings | $603,751 |
| Trent Hills | Sewer Separation and Infrastructure Renewal | $650,098 |
| Trenton | Replacement of the Smithfield Overhead Bridge | $2,365,833 |
| Tweed | Replacement of the Paul Clement's Bridge | $366,667 |
| Tweed | New Tweed Public Library Initiative | $300,000 |
| Tweed | Rehabilitation of Marlbank Road | $469,983 |
| Tweed | River Street Reconstruction | $1,051,521 |
| Tyendinaga | Melrose Sand Dome Roof Rehabilitation | $28,750 |
| Upsala | Rehabilitation of the Upsala Community Center | $47,250 |
| Uxbridge | Replacement of the Glasgow Bridge | $275,000 |
| Uxbridge | Downtown Revitalization | $200,000 |
| Val Rita | Hydrological Evaluation and Cleaning of Clear Well | $23,467 |
| Val Rita - Harty | Municipal Chalet | $30,145 |
| Vankleek Hill | Improvements to the King Street Sewage Pumping Station | $192,269 |
| Vaughan | Ansley Grove Road | $494,433 |
| Vaughan | Rainbow Creek Park Renewal and Redevelopment | $434,000 |
| Vaughan | Street Lighting Conversion to Energy Efficient | $500,000 |
| Vaughan | Martin Grove Road | $888,100 |
| Vaughan | Construct Park Washroom Facilities at Doctor McLean's Park | $466,667 |
| Vaughan | Elmbank Road | $378,133 |
| Vaughan | Erica Road | $389,267 |
| Vaughan | Oakbank Road | $388,600 |
| Vaughan | Thornbank Road | $1,324,800 |
| Vaughan | Chancellor Community Centre - Replace Roof Over the First Construction Phase of the Facility | $133,333 |
| Vaughan | Garnet A. Williams Community Centre Ice Rink Retrofit | $83,334 |
| Vaughan | Maple Community Centre- Replace Wood Siding with Metal Siding at Lower and Upper Portions of the Building | $100,000 |
| Vaughan | Al Palladini Community Centre Ice Rink Retrofit | $91,667 |
| Vaughan | Nort Johnson Park – Addition of Walkway Lighting | $83,334 |
| Vaughan | Maple Nature Reserve – Trail System Connections | $30,000 |
| Vaughan | The Woodbridge Memorial Tower and Park Site Rehabilitation – Landscaping | $56,667 |
| Vaughan | Don and Humber Trail System | $100,000 |
| Vaughan | Maple Nature Reserve – Quonset Hut Site Regeneration | $192,834 |
| Vaughan | Al Palladini Community Centre New Elevator Installation | $100,000 |
| Vaughan | Bathurst Clark Library Retrofit | $133,334 |
| Vaughan | Kleinburg Library Building Retrofit | $58,334 |
| Vaughan | Chancellor Drive & Weston Road | $35,000 |
| Vaughan | Viceroy Road & Dufferin Street | $46,667 |
| Vaughan | Highway 7 + Edgeley Boulevard | $50,000 |
| Vaughan | Cradoock Street | $5,767 |
| Vaughan | Cartwright Boulevard | $9,767 |
| Vaughan | York Hill Boulevard | $20,234 |
| Vaughan | Woodview Road | $1,967 |
| Vaughan | Via Canala Way | $2,167 |
| Vaughan | Muzzo Court | $1,833 |
| Vaughan | Via Lanciano Crescent | $2,433 |
| Vaughan | Domenica Way | $2,733 |
| Vaughan | Cooper Creek Court | $6,467 |
| Vaughan | Ed Quigg Way | $6,867 |
| Vaughan | Oberdan Way | $7,067 |
| Vaughan | Silverado Trail | $7,067 |
| Vaughan | Jenna Court | $3,633 |
| Vaughan | Longview Crescent | $7,767 |
| Vaughan | Blossom Court | $4,233 |
| Vaughan | Via Cristina Way | $8,467 |
| Vaughan | Marco Sgotto Avenue | $9,067 |
| Vaughan | Leyton Road | $9,167 |
| Vaughan | Pierina Court | $4,833 |
| Vaughan | Leith Court | $9,867 |
| Vaughan | Thistle Ridge Drive | $10,667 |
| Vaughan | Marevan Place | $5,533 |
| Vaughan | Vespucci Drive | $5,833 |
| Vaughan | Lio Avenue | $12,567 |
| Vaughan | Norwood Avenue | $13,067 |
| Vaughan | Laura Sabrina Drive | $8,133 |
| Vaughan | San Vito Drive | $8,267 |
| Vaughan | Giovanni Way | $8,433 |
| Vaughan | Tavio Way | $8,533 |
| Vaughan | Theodore Place | $18,067 |
| Vaughan | Riverside Drive | $9,133 |
| Vaughan | Sgotto Boulevard | $9,267 |
| Vaughan | Colombo Crescent | $9,467 |
| Vaughan | Eddington Place | $10,133 |
| Vaughan | York Hill Boulevard | $10,267 |
| Vaughan | Sherbourne Drive | $22,933 |
| Vaughan | Noah Crescent | $11,767 |
| Vaughan | Fonteselva Avenue | $12,133 |
| Vaughan | Siderno Crescent | $26,133 |
| Vaughan | Guery Crescent | $13,833 |
| Vaughan | Lucky Court | $13,833 |
| Vaughan | Clarmount Lane | $14,433 |
| Vaughan | Robinwood Trail | $32,133 |
| Vaughan | Dundurn Crescent | $32,267 |
| Vaughan | Chilmar Crescent | $32,367 |
| Vaughan | Julia Valentina Avenue | $33,667 |
| Vaughan | Goldpark Court | $17,933 |
| Vaughan | Riverside Drive | $18,067 |
| Vaughan | Oakdale Road | $36,367 |
| Vaughan | Amaretto Court | $19,233 |
| Vaughan | Edgeley Boulevard | $19,433 |
| Vaughan | Courtland Avenue | $19,633 |
| Vaughan | Woodcroft Lane | $44,433 |
| Vaughan | Antonella Crescent | $46,167 |
| Vaughan | Bachman Drive | $23,533 |
| Vaughan | Lamar Street | $47,633 |
| Vaughan | Melville Road | $49,667 |
| Vaughan | Oliver Lane | $54,733 |
| Vaughan | Huntingwood Court | $31,633 |
| Vaughan | Sterling Crescent | $33,033 |
| Vaughan | Binscarth Crescent | $34,033 |
| Vaughan | Blaine Court | $34,933 |
| Vaughan | Amy Court | $35,333 |
| Vaughan | Millway Avenue | $35,633 |
| Vaughan | Creditstone Road | $44,833 |
| Vaughan | Courtland Avenue | $49,833 |
| Vaughan | Marwood Place | $50,933 |
| Vaughan | Martin Grove Road | $129,033 |
| Vaughan | Beatrice Way | $72,933 |
| Vaughan | Marlott Road | $90,567 |
| Vaughan | Art Drive | $8,833 |
| Vaughan | Asquith Place | $59,200 |
| Vaughan | Athena Court | $1,700 |
| Vaughan | Beechnut Road | $7,200 |
| Vaughan | Birch Meadow Outlook | $12,600 |
| Vaughan | Casa Vista Drive | $5,600 |
| Vaughan | Castle Park Boulevard | $12,600 |
| Vaughan | Corrine Court | $5,900 |
| Vaughan | Criscione Drive | $9,100 |
| Vaughan | David Todd Avenue | $14,900 |
| Vaughan | Emmitt Road | $9,500 |
| Vaughan | Huntington Road | $11,667 |
| Vaughan | Jacob Keffer Parkway | $16,000 |
| Vaughan | Kayla Cresent | $24,100 |
| Vaughan | Killian Road | $182,167 |
| Vaughan | King Vaughan Road | $5,567 |
| Vaughan | Kipling Avenue | $10,267 |
| Vaughan | Kipling Avenue | $87,700 |
| Vaughan | Kirkbride Crescent | $14,133 |
| Vaughan | Kortright Place | $21,167 |
| Vaughan | Lucena Crescent | $12,400 |
| Vaughan | Marisa Court | $9,100 |
| Vaughan | Maxwell Court | $17,500 |
| Vaughan | Mc Quarrie Lane | $18,000 |
| Vaughan | McNaughton Road | $65,800 |
| Vaughan | Medley Court | $4,000 |
| Vaughan | Mill Arbour Lane | $35,600 |
| Vaughan | Millbank Court | $18,600 |
| Vaughan | Mortimer Crescent | $6,300 |
| Vaughan | Mount Charles Crescent | $17,500 |
| Vaughan | Muirside Road | $8,500 |
| Vaughan | Mustang Road | $4,400 |
| Vaughan | Nicola Court | $6,167 |
| Vaughan | Parsons Court | $5,000 |
| Vaughan | Payson Avenue | $9,167 |
| Vaughan | Pine Hollow Crescent | $15,600 |
| Vaughan | Piper Court | $3,400 |
| Vaughan | Porter Avenue | $7,500 |
| Vaughan | Ridgeway Court | $13,100 |
| Vaughan | Rimmington Drive | $53,200 |
| Vaughan | Romina Drive | $5,500 |
| Vaughan | Ridgefield Crescent | $81,067 |
| Vaughan | Rose Green Drive | $107,733 |
| Vaughan | Roselawn Drive | $99,700 |
| Vaughan | Sequoia Road | $5,600 |
| Vaughan | Sicilia Street | $4,600 |
| Vaughan | Sklwood Crescent | $25,900 |
| Vaughan | Springfield Way | $30,100 |
| Vaughan | St. Mark Drive | $17,867 |
| Vaughan | Stephanie Boulevard | $119,400 |
| Vaughan | Sterling Court | $4,300 |
| Vaughan | Stonemill Gate | $13,400 |
| Vaughan | Summeridge Drive | $46,700 |
| Vaughan | Swanage Drive | $26,500 |
| Vaughan | Sylvester Court | $6,900 |
| Vaughan | Tandian Court | $14,100 |
| Vaughan | Terra Road | $35,767 |
| Vaughan | Thomas Henry Road | $16,400 |
| Vaughan | Thornhill Woods Drive | $15,000 |
| Vaughan | Timber Lane | $28,100 |
| Vaughan | Townsgate Drive | $42,100 |
| Vaughan | Vera Street | $29,500 |
| Vaughan | Via Carmine Way | $24,300 |
| Vaughan | Villa Antica Drive | $7,900 |
| Vaughan | Villandry Crescent | $18,000 |
| Vaughan | Willow Tree Street | $7,200 |
| Vaughan | Woodgreen Drive | $27,467 |
| Vaughan | Thomson Creek Boulevard | $63,467 |
| Vaughan | Rosegreen Drive | $55,733 |
| Vaughan | Lockheed Avenue | $20,167 |
| Vaughan | Ashton Drive | $17,333 |
| Vaughan | Pine Meadow Drive | $15,267 |
| Vaughan | Millcreek Crescent | $28,167 |
| Vaughan | Muzich Place | $8,767 |
| Vaughan | Adriana Louise Drive | $15,233 |
| Vaughan | Lookout Point Court | $8,733 |
| Vaughan | Klamath Court | $8,167 |
| Vaughan | Monterey Road | $6,333 |
| Vaughan | Alanno Way | $5,767 |
| Vaughan | Monica Court | $5,233 |
| Vaughan | Construction of the Humanity First Community Centre | $1,100,000 |
| Vermilion | Cedarbough Residential Ontario Ranger Camp Renewal | $250,000 |
| Vermilion Bay | Renovation of the Cascade Road Bridge | $151,416 |
| Victoria Harbour | Construction of a new building to the existing Enaahtig Healing Lodge and Learning Centre. | $252,000 |
| Virgil | Construction of a Community Centre | $2,031,000 |
| Virginiatown | Replacement of Virginiatown Pumping Station | $778,750 |
| Wainfleet | Rehabilitation of Feeder Road | $250,000 |
| Wainfleet | Buliung Road Bridge | $100,000 |
| Wainfleet | Misener Road Bridge | $100,000 |
| Walkerton | Replacement of the Huron-Terrace Bridge | $635,566 |
| Warsaw | Rehabilitation of University Road | $400,979 |
| Wasaga Beach | Improvements to 57th Street and Shore Lane Drainage | $900,073 |
| Wasaga Beach | McIntyre Creek Trail Rehabilitation | $180,000 |
| Wasaga Beach | 45th Street Reconstruction | $520,908 |
| Waterloo | Improvements to the Davenport Road Multi-Use Corridor | $966,413 |
| Waterloo | Main Scales and Scalehouse Replacement | $500,000 |
| Waterloo | Landfill Gas Pipeline Twinning | $550,000 |
| Waterloo | Operations Center Photovoltaic System | $500,000 |
| Waterloo | Upgrade of The Galt Wastewater Treatment Plant Digester | $2,000,000 |
| Waterloo | Replacement of The Hespeler Wastewater Treatment Plant Raw Sewage Pumping Station | $3,333,300 |
| Waterloo | Upgrade of The Galt & Preston Wastewater Treatment Plants SCADA System | $3,333,300 |
| Waterloo | Reg. Rd. 22 (Northfield Drive) from Waterloo/Woolwich Bdry. to Scotch Line Rd. | $670,000 |
| Waterloo | Reg. Rd. 22 (Northfield Drive) from Line 86 to Waterloo/Wellington Bdry. | $780,000 |
| Waterloo | Reg. Rd. 23 (Katherine Street) from Cox Creek to Line 86 | $355,000 |
| Waterloo | Reg. Rd. 55 (Victoria Street) from 0.73 Km’s east of Ebycrest Rd. to Frederick St. | $1,400,000 |
| Waterloo | Reg. Rd. 86 (Line 86) from Waterloo/Wellington Bdry. to Cox Creek Bridge | $525,000 |
| Waterloo | Reg. Rd. 97 (Cedar Creek Road) from Edworthy Side Road to Waterloo/Oxford Bdry. | $1,150,000 |
| Waterloo | Reg. Rd. 97 (Main Street) from Shellard Side Rd. to 200 metres east of Franklin Blvd. | $370,000 |
| Waterloo | Pinewood Place Reconstruction | $287,533 |
| Waterloo | Bearinger Road Corridor Improvements | $683,333 |
| Waterloo | Columbia Street Corridor Improvements | $403,333 |
| Waterloo | Construction of the RIM Park Premium Outdoor Sports Field Facility in Waterloo | $1,631,190 |
| Waterloo | Centre of Excellence for Children and Families | $2,000,000 |
| Waterloo | Renewal and Rehabilitation of the Family Centre ( Family and Children's Services of Waterloo Region) | $2,667,000 |
| Waterloo | Combined Airport/Fleet Maintenance and Fire Hall Facility | $2,366,667 |
| Waterloo | Highway 7&8 - Courtland Ave to Hwy 7 IC. Kitchener | $1,200,000 |
| Waterloo | Kitchener-Waterloo-Cambridge rapid transit | $265,000,000 |
| Watford | Replacement of the Wall Street Waterline | $69,190 |
| Wawa | Rehabilitation of the Municipality of Wawa Air Terminal | $26,667 |
| Wawa | Wawa Airside Pavement Rehabilitation | $267,140 |
| Wawa | Michipicoten Memorial Community Centre - Upgrades | $58,333 |
| Wawa | Reconstruction of Klondike Street and Centennial Avenue | $682,696 |
| Welland | Construction of the Rose City Community Wellness & Abilities Centre | $3,000,000 |
| Welland | Thorold Road Intersection & Roadway Improvements | $2,000,000 |
| Welland | Welland Multiservice Cente Renovation | $900,000 |
| Wellesley | Hessen Strasse Resurfacing. Moser Young Rd. to Hutchinson Rd. | $421,500 |
| Wellesley | Weimar Line Resurfacing. Greenwood Hill Rd. to Hutchison Rd. | $123,000 |
| Wellesley | Siegner Bridge Handrail Upgrades | $95,000 |
| Wellesly | Replacing the existing deteriorating handrails. barrier and end walls on Siegner Bridge | $639,500 |
| Wellington | Additions to the Wellington County Museum and Archives | $1,522,800 |
| Wellington North | Cork Street Sewage Pumping Station | $600,000 |
| Wellington North | Upgrades to Egremont Street Water System and Sanitary Sewer in Mount Forest | $1,041,667 |
| West Elgin | WEST ELGIN ARENA REHABILITATION | $200,000 |
| West Elgin | Highway 401 - Orford Rd to Furnival Rd EB lanes | $2,000,000 |
| West Grey | Police/Fire Station Building Rehabilitation | $33,333 |
| West Grey | Neustadt Arena Rehabilitation | $66,667 |
| West Grey | Normanby Arena Rehabilitation | $66,667 |
| West Lincoln | Port Davidson Road Realignment | $66,666 |
| West Lincoln | Townline Road Reconstruction | $770,009 |
| West Lorne | Construction of the West Lorne Heritage Community Centre | $256,954 |
| West Nipissing | Municipal Buildings Restoration Project | $170,000 |
| West Nipissing | Minnehaha Bay Community Waterfront Park | $2,077,667 |
| West Perth | St. Andrew Street Reconstruction | $466,666 |
| West Perth | Reconstruction of Wellington Street North | $635,000 |
| Westport | Upgrades to the Westport Waterworks | $66,667 |
| Westport | Sewage Pumping Station Upgrades | $75,000 |
| Westport | Closure of the Westport Waste Disposal Site | $69,259 |
| Whitby | Anne Ottenbrite Pool - Accessibility Improvements | $1,166,666 |
| Whitby | Brooklin Community Centre and Library | $4,853,333 |
| Whitchurch - Stouffville | McCowan Road Reconstruction | $650,000 |
| Whitchurch - Stouffville | McCowan Road Reconstruction | $650,000 |
| Whitchurch-Stouffville | Expansion of the Whitchurch-Stouffville Museum Visitor / Community Centre | $1,085,518 |
| Whitestone | Hagerman Community Centre Renovations | $16,667 |
| Whitewater | Morris Street & Anderson Drive Watermain Extension | $124,070 |
| Whitewater | Haley Township Water Distribution System Upgrades | $195,856 |
| Whitney | Reconstruction of Post Street | $186,226 |
| Whitney | Algonquin Park Portage Store Trail | $250,000 |
| Whitney | Algonquin Road Rehabilitation | $350,000 |
| Wiarton | Construction of the Sauble Beach Sewage Treatment Plant | $3,120,000 |
| Wilmot | Shade Street Bridge Rehabilitation | $247,500 |
| Winchester | Construction of the Winchester Feedermain. Pumping Station and Water Meters | $2,245,733 |
| Windsor | Parallel Taxiway Construction | $2,333,333 |
| Windsor | Tecumseh Road East Improvements | $2,800,000 |
| Windsor | Bikeways Development | $133,333 |
| Windsor | Jackson Park Renewal | $266,667 |
| Windsor | Central Riverfront Festival Plaza | $666,667 |
| Windsor | Ganatchio Trail Reconstruction | $200,000 |
| Windsor | Retention Treatment Basin (RTB) | $20,000,000 |
| Windsor | Walker/Wyandotte Intersection Improvements | $832,889 |
| Windsor | Airport Operations Building Rehabilitation | $750,000 |
| Windsor | Walker Road Reconstruction | $3,955,555 |
| Windsor | Sandwich South Employment Lands Servicing | $10,133,333 |
| Windsor | City Centre Streetscape | $2,404,666 |
| Windsor | Humane Society Shelter Expansion Phases 2 and 3 | $266,667 |
| Windsor | New Facility for the Windsor-Essex Therapeutic Riding Association | $724,640 |
| Windsor | Windsor Port Authority Marine Facility | $10,123,750 |
| Wingham | Improvements to Josephine Street Servicing and Streetscape | $1,846,185 |
| Wollaston | Rehabilitation of Ridge Road | $92,000 |
| Wollaston | Rehabilitation of Former King's Highway NO. 620 Phase 3 | $652,252 |
| Woodstock | Construction of the Cowan Park Fieldhouse and Multi-purpose Hall | $1,700,000 |
| Woodstock | Public Works Building Expansion | $150,000 |
| Woodstock | Modification of the Woodstock Art Gallery and Community Arts Centre | $1,683,333 |
| Woodstock | Alzheimer Society of Oxford Office Building | $500,000 |
| Woodstock | Woodstock Agricultural Society Rehabilitate/Re-energize | $280,000 |
| Woolwich | Snyder Avenue Reconstruction | $866,667 |
| Woolwich | Samuel Street and Area Reconstruction | $866,667 |
| Woolwich | Floradale Road Resurfacing and Floradale Bridge Rehabilitation | $400,000 |
| Woolwich | Construction of Breslau Community Centre | $838,679 |
| Wyoming | Improvements to the Queen Street Forcemain | $305,000 |
| York | Dufferin Street Resurfacing | $700,000 |
| York | Bathurst Street Microsurfacing | $450,000 |
| York | Highway 27 Resurfacing | $3,033,333 |
| York | Keele Street Resurfacing | $416,667 |
| York | Old Homestead Road Resurfacing | $520,000 |
| York | Warden Avenue Resurfacing | $658,333 |
| York | Bathurst Street Resurfacing | $600,000 |
| York | Weston Road Resurfacing | $450,000 |
| York | Davis Drive Resurfacing | $766,667 |
| York | Richmond Hill Community Environmental Centre | $3,250,000 |
| York | Georgina Water Treatment Plant Upgrade | $2,400,000 |
| York | Water & Wastewater - Instrumentation and Control Replacement | $366,666 |
| York | Rehabilitation of Concrete Bus Stops | $966,666 |
| York | Rehabilitation of Bus Loops | $666,666 |
| York | Gamble Road from Bathurst Street to Yonge Street | $1,233,333 |
| York | EMS Central Support Facility and Health Connection/Contact Centre | $7,333,333 |
| York | Garfield Material Recovery Facility Upgrades | $2,533,333 |
| York and Durham regions | Duffin Creek Water Pollution Control Plant | $46,666,667 |
| York/Durham | Various Bridge Repairs - York/Simcoe/ Toronto/ Durham Area | $1,100,000 |
| Zorra | Cobble Hills Road Rehabilitation | $230,000 |
| Zurich | Installation of a Water Distribution System in Bayfield | $2,318,391 |