* $175 million has been committed to date to the province of Quebec for initiatives funded under Provincial/Territorial Base Funding.
* * Federal funding to be announced following signature of contribution agreement.
| Location | Project | Federal Contribution |
|---|---|---|
| Abitibi-Est | Highway 113, kms 98 to 112 | $2,175,000 |
| Abitibi-Ouest | Highway 111, Taschereau to Villemontel | $2,310,000 |
| Acton Vale | Renovation of Acton Vale arena | $2,111,156 |
| Adstock | Construction of a Multipurpose Centre | $1,016,308 |
| Albertville | Wastewater Treatement | $366,848 |
| Alma | Repairs to Bridge P-03709 on Boudreault Avenue | $1,400,000 |
| Alma | Renovation of Langage Plus artists' centre, Alma | $368,300 |
| Amqui | Redevelopment of D'Auteuil Street | $1,800,000 |
| Amqui | Correction of the vertical profile, Highway 132, Gulf coast sector | $3,250,000 |
| Ange-Gardien | Enlargement of Water Reservoir | $299,902 |
| Anjou | Reconstruction of Highway 25/Yves Prévost overpass | * |
| Anse à Jobin | Correction of a substandard curve | $1,592,500 |
| Audet | Extension of the sanitary sewer on Route 204 | $200,355 |
| Austin and Eastman | Repairs to Highway 112 | $782,500 |
| Baie James | Rebuilding of Bridge P-0034A on Highway 113 | $2,200,000 |
| Baie-Comeau | Expansion of the Alcoa art centre | $3,031,700 |
| Baie-Comeau | Upgrade two drinking water treatment centres | $19,900,000 |
| Baie-Comeau, | Water and Wastewater Pipeline Renewal Program (PRECO) | $4,343,990 |
| Baie-d'Urfé | Construction of a Pedestrian/Bicycle Pathway in the Industrial Park | $214,510 |
| Baie-du-Febvre | Upgrade and expansion of the Belcourt Theatre | $1,083,000 |
| Baie-d’Urfé, Beaconsfield, Sainte-Anne-de-Bellevue | Autoroute 20 eastbound – Asphalting (between chemin McDonald and Woodland Avenue) | $2,850,000 |
| Baie-Sainte-Catherine | Highway 138 – Sector du Traversier | $2,750,000 |
| Baie-Trinité | Upgrading of drinking water | * |
| Bas-Richelieu | Bringing filtration plant up to standard | $3,625,000 |
| Bas-Richelieu | Bringing filtration plant up to standard | $3,625,000 |
| Batiscan | Reconstruction of P-1 Wells | $66,990 |
| Beaconsfield | 6.8 km of protective layer on Autoroute 20 | $950,000 |
| Beaconsfield | Water and Wastewater Pipeline Renewal Program (PRECO) | $905,050 |
| Beauce | Autoroute 73/173 Phase 2 | $75,000,000 |
| Beauceville | Renovation of the sport and cultural centre | $812,343 |
| Beauceville | Upgrade of Treatment Centre And Pumping Stations | $623,420 |
| Beaudry | Highway 391, from Concession 5-6 Évain to Beaudry | $1,365,000 |
| Beaupré | Drinking water upgrade | * |
| Beaupré | Water and Wastewater Pipeline Renewal Program (PRECO) | $339,760 |
| Bellechasse | Improvement of the Bike Path | $264,294 |
| Beloeil | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,320,785 |
| Beloeil | Development of a Recreational Tourism Hub | $953,974 |
| Berthierville | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,934,910 |
| Blainville | Construction of wastewater infrastructure | * |
| Blainville | Highway 117 between Ducharme and Seigneurie boulevards in Blainville. | $1,565,000 |
| Blue Sea | Repairs to Blue Sea Road north | $835,000 |
| Boischatel | Water and Wastewater Pipeline Renewal Program (PRECO) | $429,030 |
| Bonaventure | Renovation of the Musée Acadien du Québec in Bonaventure | $138,300 |
| Bonne Espérance | Drinking water supply and treatment | * |
| Boucherville | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,999,735 |
| Boucherville | Installation of Runoff Mains on Catherine-Forestier Street | $512,590 |
| Boucherville | Installation of Runoff Mains on Jacques-Ménard Street | $596,773 |
| Bromont | Sewage collection changes in the Deux-Montagnes, Montcalm and Richmond streets sectors | $259,000 |
| Bromont | Water and Wastewater Pipeline Renewal Program (PRECO) | $182,110 |
| Bromont | Reconstruction of urban infrastructure on Shefford Street | $1,576,899 |
| Brossard | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,796,355 |
| Brossard/Longueuil | Surface course Highway 30-02-870 to 900 eastbound, surface course of Highway 10 at Highway 116, in Longueuil | $1,540,000 |
| Brownsburg-Chatham | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,058,790 |
| Bryson | Drinking water upgrade | * |
| Bryson | Construction of a water filtration plant | $2,300,000 |
| Cabano | Drinking water upgrade | * |
| Cabano et Saint-Louis-Du-Ha! Ha! | Highway 185 – Construction of an Autoroute (follow-up of work of 2009) | $14,906,000 |
| Candiac | Water and Wastewater Pipeline Renewal Program (PRECO) | $770,410 |
| Cap-Chat | Wastewater Sanitation | $5,157,090 |
| Cap-Santé and Donnacona | Wear surface on Routes 138, 358 and 41750 in the municipalities of Cap-Santé and Donnacona (length: about 8 km) | $1,165,000 |
| Carignan | Establishing a Wastewater System in the Centre Sector | $1,318,667 |
| Carleton sur Mer | Upgrade of drinking water supply | * |
| Causapscal | Water and Wastewater Pipeline Renewal Program (PRECO) | $48,750 |
| Centre multidisciplinaire de la Cité des jeunes | Construction of a multidisciplinary and sports complex in Vaudreuil-Dorion | $8,397,294 |
| Chambly | Water and Wastewater Pipeline Renewal Program (PRECO) | $961,485 |
| Chambord | Repairs to curves on a 1.4-km stretch on Highway 155 under a Hydro-Québec power line | $1,306,000 |
| Chambord | Resurfacing of Highway 169 between Val Jalbert and Chambord - phase 1 | $842,500 |
| Chambord | Highway 169 – Asphalting (between Val-Jalbert and Chambord) | $1,514,000 |
| Chandler | Upgrade of the Chandler theatre | $1,266,000 |
| Chapais | Resurfacing of Highway 113 between Chapais and the Highway 167 intersection | $1,820,000 |
| Charlemagne | Water and Wastewater Pipeline Renewal Program (PRECO) | $620,200 |
| Château-Richer | Sanitary sewer system and drinking water lines | * |
| Château-Richer | Restoration of the Côte de Beaupré interpretation centre | $233,000 |
| Châteauguay | Installation of Water Supply and Sanitary Sewer Networks on Allard, Lecourt and Dorais Streets | $1,172,800 |
| Chelsea | Treatment of Wastewater in the Centre Sector | $1,224,183 |
| Chelsea, La Pêche | Autoroute 5 – Extending the Autoroute (from Meech Creek to the Wakefield bypass) | $18,640,000 |
| Chertsey | Drinking water upgrade | * |
| Clermont | Water and Wastewater Pipeline Renewal Program (PRECO) | $341,500 |
| Collines-Du-Basque | Highway 198 – Rebuilding the Roadway | $1,250,000 |
| Colombier | Drinking water upgrade | * |
| Contrecoeur | Separation of Sewer Networks and Renewal of Pumping Stations and Wastewater Treatment | $681,000 |
| Cookshire-Eaton | Repairs to Highway 108 | $937,500 |
| Cookshire-Eaton | Rebuilding approaches on Highway 210 | $1,117,500 |
| Côte-Saint-Luc | Water and Wastewater Pipeline Renewal Program (PRECO) | $721,500 |
| Côte-Saint-Luc | Construction of an intergenerational/aquatic centre | $5,785,940 |
| Coteau-du-Lac | Bringing the Filtration Plant up to Standard | $712,500 |
| Cowansville | Repair of Infrastructure on Principale Street | $1,211,681 |
| Cowansville | Repair of Barker Reservoir | $54,095 |
| Déléage | Water and Wastewater Pipeline Renewal Program (PRECO) | $194,775 |
| Delson | Water and Wastewater Pipeline Renewal Program (PRECO) | $106,953 |
| Deschaillons-sur-Saint-Laurent | Mechanical upgrade of drinking water supply system | $70,250 |
| Deschambault-Grondines | Extension of Water Distribution Network, Grondines Sector | $1,992,525 |
| Disraeli | Renovation of the Arena and Rehabilitation of Public Parks | $296,212 |
| Disraeli | Repairing pipes, replacing watermains and sewer lines, and extending systems under several stretches of Champoux (Highway 263), Grégoire and St. Joseph streets | $971,667 |
| Dolbeau-Mistassini | Development of a Vauvert tourism centre | $1,706,392 |
| Dolbeau-Mistassini | Rehabilitate the municipal civic centre | $498,214 |
| Dolbeau-Mistassini | Mistassini and Dolbeau Arenas – Architectural Rehabilitation and Modernization of Heating and Cooling Facilities | $1,815,644 |
| Dollar-Des Ormeaux | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,712,105 |
| Donnacona | Ramp for Highway 40 and Donnaconna city boulevard | $1,100,000 |
| Dorion-Rigaud, Delson-Candiac et Blainville-St-Jérôme | Replacement and addition of switch heaters and track surfacing for commuter trains | $4,666,200 |
| Dorval | Water and Wastewater Pipeline Renewal Program (PRECO) | $552,905 |
| Dorval | Repair of a pumping station on Autoroute 20 | $3,000,000 |
| Dorval | Autoroutes 20 and 520 – Redeveloping the Dorval interchange (Dorval interchange) | $33,000,000 |
| Drummondville | Drummondville Cultural Centre | $6,166,000 |
| Drummondville | Repair of deck elements on structure 14511 W on Highway 55 (above Highway 20) | $2,600,000 |
| Dupuy | Water Quality Improvement | $339,479 |
| Estrie | Repairs to Highway 112 in Austin and Eastman | $782,500 |
| Farnham | Water and sewage infrastructure upgrades on Principale Street East | $164,418 |
| Farnham | Replacement of Water and Sewer Pipes on Saint-Paul Street (Route 235) | $444,392 |
| Ferland et Boilleau | Raising the profile of, and building a corrective layer and a wearing course on, a 3.98-km stretch of Highway 381 | $1,802,000 |
| Fermont | Wastewater Treatment | $2,762,425 |
| Forestville | Water and Wastewater Pipeline Renewal Program (PRECO) | $270,185 |
| Franquelin | Renewal of Municipal Water Infrastructure | $730,884 |
| Gaspé | Replacement of water pipes | * |
| Gaspé | Repairs to a 5.5-km stretch of roadway on Highway 132 | $900,500 |
| Gatineau | Moore Farm buildings and development | $4,800,000 |
| Gatineau | Park entrances development projects | $2,400,000 |
| Gatineau | Rebuilding of the Palais des congrès | * |
| Gatineau | Water and Wastewater Pipeline Renewal Program (PRECO) | $2,994,165 |
| Gatineau | Repair of deck elements on Structure 15094 in Gatineau | $1,112,500 |
| Gatineau | Various ramps of eastbound Highway 50 from the Draveurs Bridge. | $1,500,000 |
| Gatineau | Various ramps of eastbound Highway 50 from the Draveurs Bridge. | $1,500,000 |
| Gatineau | Water and Wastewater Pipeline Renewal Program (PRECO) | $4,926,805 |
| Gatineau | Construction of a multisport centre | $6,000,000 |
| Gatineau | Notch Road bridge and overpass improvement project | $1,300,000 |
| Gatineau | Highway 50 – Rebuilding the bridge deck (Bridge spanning Autoroute 5) | $1,112,000 |
| Girardville | Water and Wastewater Pipeline Renewal Program (PRECO) | $440,125 |
| Girardville | Bringing up to Standard and Modernizing the Drinking Water Supply System | $152,139 |
| Godbout | Wearing course of Highway 138, between Godbout and Baie-Trinité | $1,550,000 |
| Gracefield | Construction of a water filtration plant from the Gatineau River | $1,400,000 |
| Granby | Renewal and extension of Robitaille Street municipal infrastructure | $1,608,080 |
| Grande-Rivière | Renewal of Water Production Facilities | $3,595,996 |
| Grosse Île | Grosse Île and the Irish Memorial National Historic Site of Canada | $3,465,000 |
| Hampstead | Water and Wastewater Pipeline Renewal Program (PRECO) | $381,750 |
| Hébertville | Repairs to intersection 169-169 | $1,033,000 |
| Hébertville | Repairs to a 2.5-km stretch of roadway on Highway 169 | $550,500 |
| Hébertville | Renovation of Highway 169, continuation of Côte Raoul | $1,033,000 |
| Hébertville | Renovation of Rang Lac-Vert | $1,400,000 |
| Hébertville | Highway 169 – Redeveloping the intersection and rebuilding the pavement (intersection of 169/rang Caron and côte à Raoul) | $2,066,000 |
| Highway 389 | Correction of a substandard curve at KM 109 on Highway 389 | $1,050,000 |
| Île Perrot Water Board | Drinking water upgrade | * |
| Joliette | Water and Wastewater Pipeline Renewal Program (PRECO) | $573,710 |
| Jonquière | Enhanced bicycle path network, in Jonquière and integration link with the Véloroute des bleuets | $2,433,333 |
| Kénogami | Development of downtown | $3,585,672 |
| Kiamika | Creation of Recreation Facilities in the Municipal Park | $12,261 |
| Kingsbury | Wastewater treatment | * |
| L'Ancienne-Lorette | Water and Wastewater Pipeline Renewal Program (PRECO) | $3,608,435 |
| L'Ange-Gardien - Paroisse | Repairs to Royale Avenue - Phase 1 - western sector | $880,200 |
| l'Anse-à-Beaufils | Equipment upgrade in the theatre of the old factory | $412,500 |
| L'Ascension | Construction of a library in L'Ascension | $121,700 |
| L'Ascension-de-Notre-Seigneur | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,188,435 |
| L'ascension-de-Patapédia/Saint-François-D'Assise | Renovation of the pavement on Chamberland Road | $1,010,000 |
| L'Ile-Perrot | Water and Wastewater Pipeline Renewal Program (PRECO) | $487,000 |
| L'Isle aux Allumettes | Drinking water treatment and supply | * |
| La Conception | Drinking water upgrade | * |
| La Doré | Phase 1 of modernization of water production system | $127,087 |
| La Malbaie | Construction of Laure-Conan de La Malbaie library | $1,166,000 |
| La Malbaie | Upgrading the Musée Charlevoix, La Malbaie | $260,000 |
| La Minerve | Drinking water upgrade | * |
| La Pêche | Repairs to Highway 105 | $787,500 |
| La Prairie | Water and Wastewater Pipeline Renewal Program (PRECO) | $582,615 |
| La Prairie | Structure 13416 on Highway 15, on De Salaberry Blvd, in La Prairie | $3,667,500 |
| La Prairie | Autoroute 15 – Reconstruction of the bridge | $3,665,000 |
| La Rédemption | Wastewater Sanitation | $1,057,500 |
| La Reine | La Reine Road | $1,850,000 |
| La Trinité-des-Monts | Water and Wastewater Pipeline Renewal Program (PRECO) | $370,715 |
| Lac Achouakan | Rebuilding of Bridge P-01870B on Highway 169 in the unorganized territory of Lac Achouakan | $3,360,000 |
| Lac aux Sables | Wearing course on a 6-km stretch of Highway 153 | $655,000 |
| Lac Beauport | Water and Wastewater Pipeline Renewal Program (PRECO) | $75,000 |
| Lac Bouchette | Repairs to Highway 155, from KM 228.3 to KM 230 | $915,000 |
| Lac Etchemin | Resurfacing of the art and cultural centre | $383,070 |
| Lac Etchemin | Water and Wastewater Pipeline Renewal Program (PRECO) | $159,250 |
| Lac Mégantic | Multipurpose centre | $11,557,236 |
| Lac Mégantic | Water and Wastewater Pipeline Renewal Program (PRECO) | $197,015 |
| Lac-Achouakan | Highway 169 – Rebuilding bridge (bridge P-01870B, spanning the Pika River) | $2,750,000 |
| Lac-Ashuapmushuan | Correction of the curve and profile of Highway 167 at KM 165 | $1,232,000 |
| Lac-Ashuapmushuan | Highway 167 – Asphalting (from kilometre 167.9 to kilometre 172.9) | $661,000 |
| Lac-Brome | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,334,875 |
| Lac-des-Aigles | Highway 232 - Asphalting | $500,000 |
| Lac-Etchemin | Rehabilitation of the Municipal Arena – Phase 2 | $658,333 |
| Lac-Jacques-Cartier | Roadway resurfacing and paving of shoulders on Highway 169 in the unorganized territory of Lac Jacques Cartier | $831,000 |
| Lac-Pikauba territory | 6.1 kilometres of road repair on Highway 381 | $1,612,500 |
| Lac-Pythonga | More than 12.7 km of bituminous concrete reinforcement on Route 117 | $3,150,000 |
| Lac-Saint-Jean | Improvement phase II - Véloroute des bleuets | $1,684,373 |
| Lachute | Drinking water supply | * |
| Lachute | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,136,875 |
| Lachute | Pipeline Renewal Program (PRECO) – Lachute | $159,360 |
| Lachute | Pipeline Renewal Program (PRECO) – Lachute | $334,950 |
| Lachute | Water and Wastewater Pipeline Renewal Program (PRECO) | $688,600 |
| Lake Baillargeon | Correction of curves, Highway 198 | $1,250,000 |
| Lambton | Development of trails and games, repair of a building, and installation of a system to recover wastewater from watercrafts and aqueduct network connections in the Grand Lac St-François municipal park | $610,153 |
| Larouche | Construction of a multipurpose centre for la cité des retraités and the population of Larouche | $1,183,151 |
| Larouche | Construction of a road and and infrastructures to refit la cité des retraités of Larouche | $1,233,333 |
| Laval | Reconstruction of St Rose Blvd viaduct over Highway 15 | * |
| Laval | Water and Wastewater Pipeline Renewal Program (PRECO) | $2,189,065 |
| Laval | Upgrade three water treatment plants | $46,800,000 |
| Laval | Pipeline Renewal Program (PRECO) – Laval | $1,152,965 |
| Laval | Pipeline Renewal Program (PRECO) – Laval | $640,170 |
| Laval | Construction of a noise abatement structure on Highway A-440 | $3,125,000 |
| Laval | Redevelopment of intersections on a 3.2-km stretch of Highway 440 | $4,965,000 |
| Laval | Water and Wastewater Pipeline Renewal Program (PRECO) | $2,943,460 |
| Laval | Construction of organic waste treatment system | $30,550,000 |
| Laverlochère | Drinking water upgrade | * |
| Léry | Water and Sewer Systems in Léry | $4,053,200 |
| Les Basques MRC | Lift Upgrades at Mont-Saint-Mathieu Park | $747,500 |
| Les Cèdres | Sewer system | * |
| Les Cèdres | Repairing deck elements on Structure 13482 in Les Cèdres | $1,487,500 |
| Les Éboulements | Highway 362 – Rebuilding the pavement (from the Moulin River bridge for 4 km westbound) | $2,102,000 |
| Les Escoumins | Water and Wastewater Pipeline Renewal Program (PRECO) | $156,550 |
| Les Îles-de-la-Madeleine | Renovation and expansion of the maritime museum | $1,660,000 |
| Les Méchins | Drinking water supply and treatment | * |
| Lévis | Desjardins Drinking Water Facility | $11,750,000 |
| Lévis | Development of a transfer station, terminal and parking lot near the approaches to the bridges in Lévis. | $1,625,200 |
| Lévis | Lévis Forts National Historic Site of Canada - Revitalizing Fort No. 1 | $660,000 |
| Lévis | Construction work associated with the extension of 7th Street in the Saint Rédempteur sector | $2,604,000 |
| Listuguj | Redevelopment of Highway 132 | $2,000,000 |
| Lobitnière-Centre | Renewal of Water Supply and Wastewater Treatment | $1,645,572 |
| Longue Rive | Drinking water supply | * |
| Longue-Rive | Water Distribution and Discharge Project and Wastewater Treatment | $4,282,243 |
| Longueuil | Autoroute 30 – Asphalting (From Autoroute 10 to Highway 116) | $2,762,000 |
| Longueuil | Repairs to Highway 30 westbound, from Highway 10 to Chambly Road | $1,250,000 |
| Longueuil | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,826,300 |
| Longueuil | Repair of engineering structures of B-1347lS | $1,335,000 |
| Longueuil | Surface course (asphalt concrete) Highway 112-01-090 (Cousineaux), from Highway 116 to Highway 30, in Longueuil | $1,375,000 |
| Longueuil | Construction of organic waste treatment system | $21,500,000 |
| Lorrainville | Relocation of the municipal library and restoration of the fire station | $387,000 |
| Lotbinière | Water and Wastewater Pipeline Renewal Program (PRECO) | $770,000 |
| Louiseville | Wearing course on Highway 40 westbound between the Livernoche exit and the Rivière du Loup bridge | $685,000 |
| Louiseville | Water and Wastewater Pipeline Renewal Program (PRECO) | $832,155 |
| l’Isle-aux-Allumettes | Underwater research, implementation of water supply wells and the construction of a reservoir | $1,900,000 |
| Macamic | Highway 111, from Macamic towards Authier | $3,057,500 |
| Magdalen Islands | Rebuilding of water pipes | * |
| Magog | Major repairs to Bridge 9873S in Magog | $1,712,500 |
| Magog | Highway 10 eastbound, right-hand lane, from 1 km outside the Austin limits, in Magog | $2,032,500 |
| Magog | Rivière aux Cerises Marsh Observation and Education Centre | $1,172,156 |
| Malartic | Development of an Industrial Park | $929,721 |
| Maniwaki | Water and Wastewater Pipeline Renewal Program (PRECO) | $2,211,455 |
| Manseau | Rebuilding of Bridge B-13698 (at the junction of Highway 218 and Highway 20) | $2,265,000 |
| Maria | Drinking water upgrade | * |
| Maria | Refurbishment of drinking water supply lines | * |
| Marieville | 11.4 km of structural repair on the eastbound side of Autoroute 10 | $4,592,500 |
| Marieville | Bringing the Wastewater Treatment Plant up to Standard | $2,762,500 |
| Maskinongé | Wearing course on Highway 40 westbound in the municipality of Maskinongé between the rest area and the Livernoche exit | $620,000 |
| Massif du Sud | Secteur du Massif du Sud – water supply and water supply system | $1,546,012 |
| Massueville | Water and Wastewater Pipeline Renewal Program (PRECO) | $92,220 |
| Massueville | Replacement of Water and Sewer Infrastructure on Bonsecours Street | $606,000 |
| Matagami | Reinforcement of roadway of Highway 109, kms 205 to 222 | * |
| Matane | Restoration of SP-2 Pumping Station | $635,556 |
| Matapédia | Drinking water upgrade | * |
| Mauricie | Surface course on Highway 40 westbound in the municipality of Maskinongé between the rest area and the Livernoche exit | $620,000 |
| McMasterville | Reinforcement of Sports and Recreational Infrastructure at Ensoleillé Park | $1,738,178 |
| Mercier | Drinking water | * |
| Messines | Resurfacing runway 03/21 at Maniwaki Airport | $1,213,436 |
| Métabétchouan–Lac à la Croix | Repairs to Bridge P-03724 on St André Stree | $1,680,000 |
| Métabetchouan–Lac-à-la-Croix | Optimization of the Véloroute des Bleuets | $1,684,373 |
| Milan | Replacement of sanitary and storm sewers | $309,000 |
| Mirabel | 7.7 km of cement concrete resurfacing on Autoroute 15 | $11,350,000 |
| Mirabel | Highway 117, repair of asphalt | $1,137,500 |
| Mirabel | Water Treatment in Mirabel | $660,750 |
| Mirabel | Treatment of Drinking Water in the Saint-Janvier Sector | $660,750 |
| Moncerf-Lytton | Repairs to Highway 117 | $1,050,000 |
| Mont St Hiliaire | Resurfacing of Highway 116 | $1,656,000 |
| Mont-Joli | Replacement of Water Reservoir | $518,682 |
| Mont-Saint-Hilaire | Rehabilitation of Ozias-Leduc multisport park | $748,293 |
| Mont-Saint-Hiliaire | Water and Wastewater Pipeline Renewal Program (PRECO) | $373,100 |
| Montardville | Redevelopment of the Highway 20 interchange ramps | $1,125,000 |
| Montcalm | Asphalt repairs on a 4.6-km stretch of Highway 327 | $700,000 |
| Montcerf-Lytton, Lac-Pythonga | Highway 117 – Asphalting (two sections in the réserve faunique La Vérendrye) | $4,200,000 |
| Montérégie | Improvement of signage and road infrastructure | $2,600,000 |
| Montérégie | Highway 104 at Saint-Jean-sur-Richelieu | $5,750,000 |
| Montmagny | Repairs to parts of the deck on structure P-13531C on Highway 20, over the CN railway tracks | $2,280,000 |
| Montmagny/Saint-Pierre | Strengthening of Highway 20 westbound at Montmagny | $1,162,500 |
| Montreal | Autoroute 30 | * * |
| Montreal | Quartier des Spectacles | $40,000,000 |
| Montreal | Museum of Fine Arts | $13,000,000 |
| Montréal | Structural repairs on Autoroute 720 in the Viger sector | * |
| Montreal | Maison Saint-Gabriel Expansion | $2,100,000 |
| Montreal | Expansion Project - Montreal Museum of Fine Arts | $13,000,000 |
| Montréal | Wastewater treatment facility | $63,750,000 |
| Montreal | Repair of pumping systems in the Louis-Hippolyte-Lafontaine Tunnel | $275,000 |
| Montreal | Structural repair of St-Jean-Baptiste ramps on Autoroute 40 | $6,550,000 |
| Montreal | Restoration and maintenance of the Château Ramezay Museum | $494,666 |
| Montreal | IMAGO creative centre, research and presentation project | $1,624,600 |
| Montreal | Redevelopment of Les Deux Mondes theatre company | $970,000 |
| Montreal | Renovation and expansion of Théâtre d'Aujourd'hui | $685,833 |
| Montreal | Relocation of the DynamO Théâtre production centre to a permanent residence within TAZ | $943,000 |
| Montreal | Relocation of the jewelry school in the Quartier des spectacles | $704,220 |
| Montreal | Rehabilitate and develop the Outremont rail yards | $30,000,000 |
| Montreal | Common access portal for trucks | $9,000,000 |
| Montreal | The construction of a multipurpose sports centre in Saint-Laurent Borough | $11,668,428 |
| Montreal | Repairs to the structural systems of the Querbes overpass | $1,800,000 |
| Montreal | Expansion of Les Deux Mondes theatre and premises for the Aux Écuries group | $970,000 |
| Montreal | Wearing course of Highway 20 between St-Pierre and Woodland interchamges | $2,850,000 |
| Montreal | Rebuilding the structural systems of the Place Curatteau overpass bridge | $2,875,000 |
| Montreal | Wearing course of Highway 20 between St-Pierre and Woodland interchamges | $2,850,000 |
| Montreal | Rebuilding the structural systems of the Place Curatteau overpass bridge | $2,875,000 |
| Montreal | Relocation of the Francophone community radio of Montreal | $1,610,000 |
| Montreal | Construction of organic waste treatment system | $67,100,000 |
| Montréal | Autoroute 40: Boulevard Saint-Jean-Batiste overpass– Reconstruction of the overpass | $6,250,000 |
| Montréal | Autoroute 720: from rue Bleury to rue Berri eastbound | $5,100,000 |
| Montréal | Relocalisation de CIBL, Montréal | $1,610,000 |
| Montreal | Increase access point capacity along Hydro-Québec’s network in the Port of Montreal | $4,648,500 |
| Montreal (Southern rim) | Construction of organic waste treatment system | $31,000,000 |
| Nantes | Repairs to Highway 161 | $880,000 |
| New Richmond | Water system and sewer infrastructure | * |
| New Richmond | Water and Wastewater Pipeline Renewal Program (PRECO) | $245,000 |
| Nicolet | Rebuilding of Highway 259 | $850,000 |
| Nicolet River | Wearing course on a 6-km stretch of Highway 20 westbound near the Nicolet River | $995,000 |
| Nominingue | Asphalt repairs on a 5.6-km stretch of Highway 321 | $675,000 |
| North Hatley | Upgrading of drinking water production and supply infrastructure | * |
| Notre Dame des Pins | Reinforcement of the roadway on Highway 173 north of the municipality of Notre Dame des Pins | $1,100,000 |
| Notre-Dame-Bon-Conseil | More than 3 km of protective layer on the eastbound side of Autoroute 20 | $1,552,500 |
| Notre-Dame-de-la-Salette | Water and Wastewater Pipeline Renewal Program (PRECO) | $680,775 |
| Notre-Dame-des-Neiges | Water and Wastewater Pipeline Renewal Program (PRECO) | $342,125 |
| Notre-Dame-des-Neiges | Pipeline Renewal Program (PRECO) – Notre-Dame-des-Neiges | $198,750 |
| Notre-Dame-des-Prairies | Water and Wastewater Pipeline Renewal Program (PRECO) | $839,950 |
| Notre-Dame-des-Prairies | Pipeline Renewal Program (PRECO) – Notre-Dame-des-Prairies | $702,450 |
| Notre-Dame-des-Prairies | Water and Wastewater Pipeline Renewal Program (PRECO) | $461,400 |
| Notre-Dame-des-Prairies | Water Network on Hénault Street | $40,000 |
| Notre-Dame-du-Rosaire | Water Renewal, Repair of Water Supply, Sewer and Sanitization Networks | $3,714,554 |
| Nouvelle-Beauce | Redevelopment of civil aviation museum | $121,499 |
| Oka | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,091,690 |
| Oka | Renewal of Water Production Plant | $1,150,000 |
| Orford | Renovation and upgrade of facilities in the J.M.C Orford art centre. | $2,715,000 |
| Papineauville | Drinking water systems | * |
| Papineauville | Modifications to the existing water distribution system | $300,000 |
| Percé | More than 12 km of pavement resurfacing on Route 132 | $1,050,000 |
| Percé | Pavement repairs on Highway 132 (Prével sector) | $1,100,000 |
| Percé | Pavement repairs on Highway 132 (Prével sector) | $1,100,000 |
| Péribonka | Construction of a filtration plant | * |
| Péribonka | Correction of two substandard curbs and repair of 2.3 kilometres of the Route des Pionniers at Péribonka and St-Ludger-de-Milot | $1,057,500 |
| Péribonka | Highway Milot – Reconstruction of the road (de la bleuetière sector, Saint-Ludger-de-Milot | $1,057,000 |
| Petite-Rivière-Saint-François | Rehabilitation of the Charlevoix railway | $1,285,525 |
| Petite-Riviere-St-Francois | Wearing course of Highway 138, Petite-Rivière-Saint-François | $2,250,000 |
| Plaisance | Modification of water and sewer infrastructure | $265,000 |
| Plessisville | Repair of watermain and sewer pipes on St-Calixte Street | $1,596,666 |
| Plessisville | Water and Wastewater Pipeline Renewal Program (PRECO) | $114,100 |
| Plessisville | Blower Replacements - Wastewater Treatment Station | $200,602 |
| Plessisville | Extension of Avenue Méthot | $511,532 |
| Pohénégamook | Repairs to a 3.3-km stretch of roadway on Rang Tom Fox | $598,000 |
| Pointe-des-Cascades | Water and Wastewater Pipeline Renewal Program (PRECO) | $49,975 |
| Pointe-Lebel | Water Supply - Renewal And Capacity Increase of The Treatment Plant | $251,135 |
| Pointe-Lebel | Installation of Water Distribution and Wastewater Discharge Networks from Langlois and Murray Parks | $1,242,017 |
| Portage du Ford | Repaving of Highway 301 | $787,500 |
| Portage du Fort | Drinking water upgrade | * |
| Portage-du-Fort | Underwater research, the implementation of water supply wells and the construction of a reservoir | $2,200,000 |
| Portage-du-Fort | Feasibility study of a commuter train service between the regional county municipality of Pontiac, Renfrew County, and the City of Ottawa. | $136,000 |
| Portneuf | Reconstruction of 1st and 2nd Avenues | $2,325,834 |
| Prévost | Water and Wastewater Pipeline Renewal Program (PRECO) | $530,100 |
| Prévost | Pipeline Renewal Program (PRECO) – Prévost | $151,600 |
| Prévost | Renovation of drinking water supply infrastructures | $286,057 |
| Prévost | Wastewater Treatment Station Upgrade | $234,333 |
| Puvirnituq | Puvirnituq airport | * |
| Québec | Relocation of the Sainte Foy water intake | * |
| Québec | 440-740 interchange, Charest/Robert-Bourassa | * |
| Québec | Improvement work and the expansion of l’École de cirque de Québec | $3,200,000 |
| Québec | Fort and Château St-Louis | $11,000,000 |
| Québec | Montmorency Park | $330,000 |
| Québec | Fortifications of Québec National Historic Site | $4,950,000 |
| Québec | Wearing course on Highway 138 | $5,200,000 |
| Québec | Widening of Highway 138 | $2,850,000 |
| Québec | Chemin du Hibou and First Avenue in Stoneham | $1,327,500 |
| Québec | Repairs to Highway 362 | $2,162,500 |
| Québec | Wearing course on Highway 381, north of St Urbain | $1,812,500 |
| Québec | Construction of an auxiliary lane for slow-moving vehicles on Highway 138 east of St Hilarion | $1,344,000 |
| Québec | Expansion of the Monique Corriveau Library | $7,060,000 |
| Québec | Reinforcement of the major water system pipes | $18,333,333 |
| Québec | Construction of a multi-generational training centre in L’Ancienne-Lorette | $3,266,666 |
| Québec | Replacement of sewer pipes, Maizerets | $2,433,333 |
| Québec | Repaving over 12 kilometres of Highway 40 | $2,725,000 |
| Québec | 5.6 kilometres of road repair on Highway 40 | $1,585,000 |
| Québec | Redevelopment of Route 132 (urban perimeter boundary at Boivert Street (Phase 2)) | $3,760,000 |
| Québec | Water and Wastewater Pipeline Renewal Program (PRECO) | $11,132,570 |
| Québec | Completion of the Augustinian Graven in Our Memories project | $15,000,000 |
| Québec | Construction of Organic Waste Treatment System | $16,577,504 |
| Québec | Restoration and upgrading of the Alyne-Lebel Centre | $833,300 |
| Quebec City | Musée national des beaux arts du Québec | $34,000,000 |
| Quebec City | PEPS (Sport Pavilion Laval University) | $37,500,000 |
| Rapide-Danseur | Highway 388 from intersection 393 towards Ontario | $1,893,500 |
| Régie d'Assainissement des Eaux du Bassin de la Prairie | Renewal of Filtration Plant | $5,968,719 |
| Régie interm. D'aqueduc du Bas-Richelieu | Water and Wastewater Pipeline Renewal Program (PRECO) | $7,307,525 |
| Régie intermunicipale d'aqueduc et d'égout Lotbinière-Centre | Bringing the Water Supply and Waterwater Treatment Facilities up to Standard | $1,645,572 |
| Repentigny | Water and Wastewater Pipeline Renewal Program (PRECO) | $2,834,600 |
| Réservoir-Dozois | 11.8 km of pavement resurfacing on Route 117 | $3,600,000 |
| Richelieu | Water system and sewers | * |
| Richmond | Replacement of Water and Sewer Mains on Principale Street North (Route 243) | $924,000 |
| Rimouski | Relocation of la Coopérative de solidarité Paradis to downtown Rimouski | $1,366,000 |
| Rimouski | Installation of an orchestral pit in the Desjardins-Télus concert hall | $153,300 |
| Rivière-à-Claude | Relocation of Highway 132 | $1,000,000 |
| Rivière-à-Claude | Reconstruction of Route Mont-Saint-Pierre, the access road to the Gaspésie provincial park | $1,100,000 |
| Rivière-au-Tonnerre | Surface course Highway 138 in the Municipality of Rivière-au-Tonnerre | $2,300,000 |
| Rivière-Aux-Outardes | Wearing course of Highway 389 between kms 104 and 116 in Rivière-aux-Outardes | $1,525,000 |
| Rivière-Aux-Outardes | Wearing course of Highway 389 between kms 104 and 116 in Rivière-aux-Outardes | $1,525,000 |
| Rivière-Beaudette | Treatment of Wastewater in the Pointe-Lalonde Sector | $491,925 |
| Rivière-du-Loup | Construction of a music school | $1,200,000 |
| Rivière-du-Loup | Water and Wastewater Pipeline Renewal Program (PRECO) | $457,240 |
| Rivière-du-Loup | Biomethanization Project | $4,060,000 |
| Rivière-du-Loup | Creation of an Urban Park Downtown | $1,533,063 |
| Roberval | Resurfacing on a 5-km stretch of Highway 167 in the municipalities of Roberval and Chambord | $661,000 |
| Roberval | Construction of pedestrian and bicycle paths along Lac-St-Jean | $2,624,660 |
| Roberval | Water and Wastewater Pipeline Renewal Program (PRECO) | $236,550 |
| Rosemère | Water and Wastewater Pipeline Renewal Program (PRECO) | $592,325 |
| Rougemont | Water and Wastewater Pipeline Renewal Program (PRECO) | $135,625 |
| Rouyn-Noranda | Construction of an exposition centre | $1,751,772 |
| Rouyn-Noranda | Repairs to Highway 117 | $850,000 |
| Rouyn-Noranda | Water and Wastewater Pipeline Renewal Program (PRECO) | $483,765 |
| Rouyn-Noranda | Renovation and expansion of Dave Keon arena | $3,509,193 |
| Roxton Pond | Extension of water and sewer networks around Roxton Lake | $1,800,000 |
| Roxton township and the village of Roxton Falls | Wearing course on Highway 241 | $756,000 |
| Saguenay | Autoroute 73/175 Phase 2 | $112,500,000 |
| Saguenay | 4.3 km of pavement repair on Route Coulombe | $1,235,000 |
| Saguenay | Repairs to Bridge P-03348 over the Saguenay River | $2,210,000 |
| Saint-Adelme | Drinking water upgrade | * |
| Saint-Adolphe-d'Howard | Drinking and Sewer Water Pipelines in Saint-Adolphe-d'Howard | $1,300,000 |
| Saint-Adrien-d’Irlande | Replacement of water distribution pipes | $97,750 |
| Saint-Agapit | Construction of a multipurpose centre | $2,511,418 |
| Saint-Agapit | Water and Wastewater Pipeline Renewal Program (PRECO) | $305,900 |
| Saint-Aimé-du-Lac-des-Iles | Construction of a new library in Saint-Aimé-du-Lac-des-Iles | $89,500 |
| Saint-Alexandre-de-Kamouraska | Asset maintenance of the Saint-Alexandre music camp | $1,161,000 |
| Saint-Alphonse-de-Granby | Extension of Brodeur Street to Enable the Expansion of the Industrial Park | $496,512 |
| Saint-Alphonse-Rodriguez | Water and Wastewater Pipeline Renewal Program (PRECO) | $458,625 |
| Saint-Alphonse-Rodriguez | Infrastructure Renewal in Village Sector | $7,660,999 |
| Saint-Ambroise-de-Kildare | Water and Wastewater Pipeline Renewal Program (PRECO) | $120,000 |
| Saint-Ambroise-de-Kildare | Wastewater Sanitization on 30th Avenue | $127,500 |
| Saint-Antoine-sur-Richelieu | Saint-Antoine-sur-Richelieu Community Centre | $86,130 |
| Saint-Armand, Saint-Pierre-de-Véronne-à-Pike-River, Saint-Sébastien, Saint-Alexandre, Saint-Jean-sur-Richelieu | Autoroute 35 – Extension of the autoroute (from the American border up to Saint-Jean-sur-Richelieu) | $13,955,000 |
| Saint-Augustin-de-Desmaures | Construction of Lisbonne Street in the Fran?ois-Leclerce industrial park | $846,125 |
| Saint-Barnabé | Water and Wastewater Pipeline Renewal Program (PRECO) | $371,000 |
| Saint-Barnabé-Sud | Wastewater treatment | $1,422,113 |
| Saint-Barnabé-sud | Treatment of Wastewater | $1,422,113 |
| Saint-Bernard-de-Lacolle | Repair of embankment structures on Autoroute 15 | $3,575,000 |
| Saint-Bernard-de-Michaudville | Saint-Bernard-de-Michaudville Wastewater Treatment | $1,657,500 |
| Saint-Blaise-sur-Richelieu | Expansion and renovation of community centre and recreation centre | $464,106 |
| Saint-Boniface | Repaving 6.5 kilometres of Highway 55 | $3,150,000 |
| Saint-Bruno-de-Guigues | Water and Wastewater Pipeline Renewal Program (PRECO) | $283,415 |
| Saint-Célestin | Water and Wastewater Pipeline Renewal Program (PRECO) | $88,250 |
| Saint-Celestin | Pipeline Renewal Program (PRECO) – Saint-Celestin | $15,750 |
| Saint-Celestin | Pipeline Renewal Program (PRECO) – Saint-Celestin | $72,500 |
| Saint-Césaire | Water and Wastewater Pipeline Renewal Program (PRECO) | $425,375 |
| Saint-Césaire | Pipeline Renewal Program (PRECO) – Saint-Césaire | $307,500 |
| Saint-Césaire | Highway 112 at Rougemont and St-Césaire | $1,315,000 |
| Saint-Charles-de-Bellechasse | Renewal of Water Infrastructure | $1,281,122 |
| Saint-Charles-de-Borromée | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,533,065 |
| Saint-Charles-sur-Richelieu | Water and wastewater Infrastructure | * |
| Saint-Chrysostome | Expansion of the recreation centre | $47,776 |
| Saint-Cuthbert | Wastewater Sanitation | $1,671,667 |
| Saint-Cyprien | Repairs to a 3.5-km stretch of roadway on Highway 293 | $755,000 |
| Saint-Cyprien-des-Etchemins | Replacement of wastewater collection pipes and installation of water sewers | $289,333 |
| Saint-Cyrille-de-Wendover | Water and Wastewater Pipeline Renewal Program (PRECO) | $96,600 |
| Saint-Damase-de-l'Islet | Sewers and Water Sanitization | $1,702,293 |
| Saint-David | Domestic Wastewater Sanitization | $1,824,820 |
| Saint-Denis-sur-Richelieu | Surface course (asphalt concrete) Highway 137, surface course on 600 m south of the intersection of 4e Rang and Grand-Bois | $1,457,500 |
| Saint-Denis-sur-Richelieu | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,065,510 |
| Saint-Denis-sur-Richelieu | Conversion of a Skating Rink to a Multipurpose Surface | $106,668 |
| Saint-Denis-sur-Richelieu | Highway 137 – Asphalting (from the 4e rang des Grand-Bois to the boundary of La Présentation | $1,431,000 |
| Saint-Denis-sur-Richilieu | Water and Wastewater Pipeline Renewal Program (PRECO) | $559,400 |
| Saint-Dominique | Water and Wastewater Pipeline Renewal Program (PRECO) | $326,000 |
| Saint-Dominique-du-Rosaire | Wastewater and Water Collection and Sanitization | $2,433,867 |
| Saint-Édouard-de-Maskinongé | Water and Wastewater Pipeline Renewal Program (PRECO) | $577,275 |
| Saint-Eugène-d'Argentenay | Water and Wastewater Pipeline Renewal Program (PRECO) | $51,350 |
| Saint-Eustache | Water and Wastewater Pipeline Renewal Program (PRECO) | $33,375 |
| Saint-Eustache | Modifications to Wastewater Treatment Station | $182,750 |
| Saint-Félix-d'Otis | Drinking water upgrade | * |
| Saint-Félix-de-Valois | Water and Wastewater Pipeline Renewal Program (PRECO) | $409,850 |
| Saint-Félix-de-Valois | New Collection and Water Supply System in Belleville Sector | $400,000 |
| Saint-François-du-Lac | Water and Wastewater Pipeline Renewal Program (PRECO) | $108,500 |
| Saint-Gabriel-de-Rimouski | Adding Municipal Sewer Infrastructure with the Help of Regional Development | $301,897 |
| Saint-Gédéon | Water and Wastewater Pipeline Renewal Program (PRECO) | $690,765 |
| Saint-Gédéon-de-Beauce | Water and Wastewater Pipeline Renewal Program (PRECO) | $180,950 |
| Saint-Georges | Construction of a 700-seat theatre | $6,000,000 |
| Saint-Georges | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,430,975 |
| Saint-Georges | Repair of 115th Street and 2nd Avenue Network | $149,162 |
| Saint-Georges | Upgrade of Wastewater Treatment Plant | $107,595 |
| Saint-Georges | 25th Avenue extension and connection to future 74th Street | $589,916 |
| Saint-Germain-de-Grantham | Water and Wastewater Pipeline Renewal Program (PRECO) | $79,700 |
| Saint-Gilbert | Water and Wastewater Pipeline Renewal Program (PRECO) | $393,750 |
| Saint-Henri | Water and Wastewater Pipeline Renewal Program (PRECO) | $117,030 |
| Saint-Henri | Pipeline Renewal Program (PRECO) – Saint-Henri | $49,350 |
| Saint-Hippolyte | Revitalization of Village Centre | $405,971 |
| Saint-Honoré-de-Shendley | Repair of Principale Street – Route 269 | $677,333 |
| Saint-Honoré-de-Shenley | Bike/walking path | $151,489 |
| Saint-Hyacinthe | Water and Wastewater Pipeline Renewal Program (PRECO) | $474,925 |
| Saint-Hyacinthe | Addition of One Water Supply Main for Douville Sector and Repair of Various Infrastructure | $1,885,001 |
| Saint-Hyacinthe | Construction of a recreation/aquatic centre | $5,294,958 |
| Saint-Jacques | Replacement of Water and Sanitary Sewer Mains on Saint-Jacques and Collège Streets | $1,920,434 |
| Saint-Jacques-de-Leeds | Drinking Water and Wastewater | $5,280,551 |
| Saint-Jacques-le-Mineur | Wastewater Sanitization of Parc Landry Sector | $461,762 |
| Saint-Jean-de-Brébeuf | Installtion of water supply and sewage infrastructure for a recreation-tourism to development | $425,000 |
| Saint-Jean-de-Brébeuf | Residential development – Bullard Site | $425,000 |
| Saint-Jean-de-Matha | Water and Wastewater Pipeline Renewal Program (PRECO) | $222,030 |
| Saint-Jean-de-Matha | Rebuilding the Infrastructure on Rue Sainte-Louise (Highway 337) | $522,531 |
| Saint-Jean-Sur-Richelieu | Installation of Sanitary Sewers and Water Mains in the Fleur De Lys Sector | $1,233,334 |
| Saint-Jean-sur-Richelieu | Upgrading the Filtration Plant to Standard in the Iberville Sector | $1,900,000 |
| Saint-Joachim | Water and Wastewater Pipeline Renewal Program (PRECO) | $140,000 |
| Saint-Joseph-de-Beauce | Water and Wastewater Pipeline Renewal Program (PRECO) | $287,275 |
| Saint-Jules | Wastewater Treatment | $395,887 |
| Saint-Lambert | Wastewater Sanitization | $1,262,906 |
| Saint-Lazare-de-Bellechasse | Installation of water sewers | $250,000 |
| Saint-Léonard-d'Aston | Richard-Lebeau Multipurpose Centre | $1,704,618 |
| Saint-Louis-de-Blandford | Highway 20 eastbound, between Rivière Blanche and Rivière Goulet | $1,617,500 |
| Saint-Louis-de-Blandford | Multipurpose Recreation Centre | $257,984 |
| Saint-Louis-de-Gonzague | Collection and Sanitization of Wastewater | $1,155,103 |
| Saint-Louis-du-Ha! Ha!, | Phase 2 of the Route 185 project | $241,900,000 |
| Saint-Luce | Water and Wastewater Pipeline Renewal Program (PRECO) | $24,375 |
| Saint-Magloire | Repairs to Municipal Hall | $85,000 |
| Saint-Malachie | Replacement and extension of water and sewage infrastructure | $804,657 |
| Saint-Malachie | Replacement of watermains and wastewater collection pipes – 11th Street district | $804,657 |
| Saint-Marc-de-Figuery | Asphalt reinforcement of the highway and culvert reconstruction on Route 111 from Massicotte Road to Saint-Marc-de-Figuery | $1,750,000 |
| Saint-Marc-du-Lac-Long | Water Supply and Treatment and Wastewater Sanitization | $3,646,500 |
| Saint-Marcel-de-Richelieu | Wastewater Sanitization | $1,275,000 |
| Saint-Marie-Madeleine | Water and Wastewater Pipeline Renewal Program (PRECO) | $101,500 |
| Saint-Mathieu-de-Beloeil | Water and Wastewater Pipeline Renewal Program (PRECO) | $126,000 |
| Saint-Mathieu-de-Beloeil | Highway 229 – Rebuilding Bridge B-13711 | $5,875,500 |
| Saint-Mathieu-de-Beloeil | Autoroute 20 and Highway 229 – Reconstruction of the bridge and redevelopment of the intersections | $2,750,000 |
| Saint-Maurice | Highway 352 – Asphalting (between Autoroute 40 and the urban sector) | $570,000 |
| Saint-Michel | Wastewater sanitization infrastructures | $3,868,652 |
| Saint-Michel-de-Bellechasse | Repair of breakwaters | $66,667 |
| Saint-Narcisse | Correction of the vertical profile on Highway 359 | $1,112,500 |
| Saint-Nazaire | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,273,395 |
| Saint-Nérée | Water and Wastewater Pipeline Renewal Program (PRECO) | $71,875 |
| Saint-Pamphile | Water and Wastewater Pipeline Renewal Program (PRECO) | $201,450 |
| Saint-Pamphile | Repairing pavement structure on Highway 204 in Saint-Pamphile | $1,007,500 |
| Saint-Pamphile | Repairing pavement structure on Highway 204 in Saint-Pamphile | $1,007,500 |
| Saint-Paul | Water and Wastewater Pipeline Renewal Program (PRECO) | $174,000 |
| Saint-Paul-de-Montminy | Water and Wastewater Pipeline Renewal Program (PRECO) | $221,425 |
| Saint-Placide | Renewal of Wastewater Treatment System | $1,275,000 |
| Saint-Prime | Water and Wastewater Pipeline Renewal Program (PRECO) | $425,250 |
| Saint-Prosper | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,875,000 |
| Saint-Prosper | Water Treatment and Distribution, Wastewater Sanitization | $4,089,035 |
| Saint-Roch-de-l'Achigan | Highway 339, repair of asphalt | $1,130,000 |
| Saint-Roch-des-Aulnaies | Water Supply, Installation of Water Network and Sanitary and Runoff Sewers, and the Construction of a Wastewater Treatment System | $5,338,635 |
| Saint-Simon | Waste water and drinking water upgrades | * |
| Saint-Thomas | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,007,895 |
| Saint-Tite | Water and Wastewater Pipeline Renewal Program (PRECO) | $61,250 |
| Saint-Tite | Water Treatment and Supply | $4,427,063 |
| Saint-Tite-des-Caps | Road repair and replacing the asphalt layer over 2.5 kilometres on Route 138 | $775,000 |
| Saint-Urbain | Water and Wastewater Pipeline Renewal Program (PRECO) | $236,975 |
| Saint-Valliet/Saint-Michel | Strengthening of the road base from Highway 20 eastbound to Saint-Vallier and Saint-Michel-de-Bellechasse | $1,001,000 |
| Saint-Victor | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,435,095 |
| Saint-Victor | Pipeline Renewal Program (PRECO) – Saint-Victor | $977,595 |
| Saint-Zénon | Construction of Water Treatment Plant | $1,294,000 |
| Sainte-Agathe-des-Monts | Highway 15, asphalt patching | $1,507,500 |
| Sainte-Agathe-des-Monts | Wastewater Treatment Station Upgrade and Overflow Controls | $7,723,667 |
| Sainte-Angèle-de-Mérici | Highway 234 - Asphalting | $388,000 |
| Sainte-Anne-de-Bellevue | Water and Wastewater Pipeline Renewal Program (PRECO) | $132,200 |
| Sainte-Anne-des-Plaines | Water and Wastewater Pipeline Renewal Program (PRECO) | $99,375 |
| Sainte-Anne-des-Plaines | Construction of a wastewater management pond | $915,146 |
| Sainte-Appoline-de-Patton | Wastewater Collection and Sanitization | $1,896,439 |
| Sainte-Brigitte-des-Saults | Putting New Well Into Operation; Replacement of Part of The Pipeline Network; Construction of a Sewer Network | $1,497,543 |
| Sainte-Catherine | Water and Wastewater Pipeline Renewal Program (PRECO) | $384,900 |
| Sainte-Catherine | Rebuilding Saint-Laurent Boulevard Between Rue Centrale and 1st Avenue | $1,351,424 |
| Sainte-Catherine-de-la-Jacques-Cartier | Water and Wastewater Pipeline Renewal Program (PRECO) | $498,000 |
| Sainte-Cécile-de-Whitton | Collection and Treatment of Wastewater in Saint-Samuel-Station Sector | $1,310,452 |
| Sainte-Claire | Creation of a Community Park | $79,071 |
| Sainte-Clotilde de Beauce | Development of the industrial park and municipal infrastructure | $128,882 |
| Sainte-Croix | Water and Wastewater Pipeline Renewal Program (PRECO) | $170,595 |
| Sainte-Élisabeth | Water and Wastewater Pipeline Renewal Program (PRECO) | $768,750 |
| Sainte-Geneviève-de-Berthier | Water and Wastewater Pipeline Renewal Program (PRECO) | $901,250 |
| Sainte-Julie | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,845,510 |
| Sainte-Julie | Pipeline Renewal Program (PRECO) – Sainte-Julie | $1,240,250 |
| Sainte-Julie | Redevelopment of the Fer à cheval interchange and construction of a park-and-ride lot | $1,080,000 |
| Sainte-Julie | Pipeline Renewal Program (PRECO) – Sainte-Julie | $605,260 |
| Sainte-Lucie-des-Laurentides | Bringing the Drinking-Water Supply up to Standard for the Village and Lac Swell Sectors | $318,333 |
| Sainte-Malachie | Rehabilitation and construction of aqueduct and sewer infrastructure | $1,026,143 |
| Sainte-Marcelline-de-Kildare | Water Supply Renewal for Lac Morin Sectors | $337,775 |
| Sainte-Marguerite | Drinking water upgrade | * |
| Sainte-Marie | Cultural and sports centre | $9,137,685 |
| Sainte-Marie | Water and Wastewater Pipeline Renewal Program (PRECO) | $155,175 |
| Sainte-Marie | Water and Wastewater Pipeline Renewal Program (PRECO) | $801,755 |
| Sainte-Monique | Water and Wastewater Pipeline Renewal Program (PRECO) | $54,500 |
| Sainte-Sabine | Renovation of the community centre | $55,000 |
| Sainte-Sabine | Water Supply Renewal for the Longeant Sector Along Route 235 | $2,411,251 |
| Sainte-Thérèse | Water and Wastewater Pipeline Renewal Program (PRECO) | $275,785 |
| Sainte-Ursule | Sanitary Drainage in the Petit-Poste Sector | $1,038,110 |
| Sainte-Victoire-de-Sorel | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,969,200 |
| Sainte-Victoire-de-Sorel | Wastewater Sanitization | $1,334,250 |
| Salaberry-de-Valleyfield | Water and Wastewater Pipeline Renewal Program (PRECO) | $3,076,710 |
| Senneville | Collection of Wastewater in Crevierville Sector | $293,541 |
| Sept-Îles | Port of Sept-Îles - optimization of Pier 30 | $4,535,000 |
| Sept-Îles | Port Authority - Optimization of the Relance terminal | $15,000,000 |
| Sept-Îles | Water and Wastewater Pipeline Renewal Program (PRECO) | $244,515 |
| Sept-Îles | Development of Pointe-Noire Terminal | $5,000,000 |
| Shannon | Water supply system | $13,345,000 |
| Shawinigan | Restoration and upgrade of the Maison de la culture Francis-Brisson | $1,225,000 |
| Shefford | Collection and Treatment of Wastewater in Sylvie Street Sector | $467,500 |
| Sherbrooke | Upgrading of drinking water supply infrastructure | * |
| Sherbrooke | Repairs to Highway 55 in Sherbrooke, from the Highway 222 viaduct northward (left-hand lane) | $892,500 |
| Sherbrooke | Repairs to Highway 55 in Sherbrooke, from the Highway 222 viaduct northward (right-hand lane) | $1,190,000 |
| Sherbrooke | Multi-sport and health centre at Bishop’s University | $13,250,000 |
| St Agathe des Monts | Water production upgrade | * |
| St Ambroise | Rebuilding of Bridge P-01870B on Highway 172 | $1,400,000 |
| St Angèle de Mérici | Repairs to a 3.5-km stretch of roadway on Highway 234 (western section) | $600,500 |
| St Calixte | Reinforcement of Highway 335 | $715,000 |
| St Catherine de Hatley | Repaving of Highway 55 | $577,500 |
| St Charles sur Richelieu | Water supply and wastewater treatment | * |
| St Épiphane and St François Xavier de Viger | Repairs to a 8.6-km stretch of roadway on Highway 291 | $775,000 |
| St Étienne de Grès | Wearing course on St Thomas Road | $762,500 |
| St Flavie and Mont Joli | Repairs to a 3.5-km stretch of roadway on Perreault Road eastbound | $600,500 |
| St Flavien | Repairs to and expansion of the multipurpose municipal building | $513,865 |
| St François d’Assise | Upgrade of drinking water supply infrastructure | * |
| St Henri de Taillon | Groundwater supply | * |
| St Honoré de Témiscouata | Repairs to the roadway of Highway 291 | $575,000 |
| St Hubert de la Rivière du Loup | Drinking water upgrade | * |
| St Monique | Drinking water supply | * |
| St Octave de Métis and Padoue | Repairs to a 7.3-km stretch of roadway on Chemin Kempt | $625,500 |
| St Paul de Montminy | Drinking water upgrade | * |
| St Pierre de Véronne à Pike River, Stanbridge Station and Bedford township | Repairs to Highway 202 | $1,000,000 |
| St Rémi de Tingwick | Rebuilding of Principale Street | $750,000 |
| St Rose du Nord | Drinking water upgrade | * |
| St Sixte and Lochaber | Repairs to Highway 317 | $945,000 |
| St Sylvestre | Wearing course on a 6.2-km stretch of Highway 269 | $880,000 |
| St Thomas, Lavaltrie and Joliette | Wearing course and planing of a 5.4-km stretch of Highway 31 | $800,000 |
| St Zénon | Asphalt repairs on a 5-km stretch of Highway 131 | $850,000 |
| St-Honoré-de-Shenley | Water and Wastewater Pipeline Renewal Program (PRECO) | $444,250 |
| St-Jacques-le-Mineur | Rebuilding of structures on Highway 15, southbound | * |
| St-Sauveur | Reconstruction of structure on Highway 364 over Highway 15 | * |
| St. Martin | Drinking water upgrade | * |
| Stanstead East | Repairs to Highway 143 | $677,500 |
| Ste-Barbe/St-Stanislas-de-Kostka | Highway 132 at Ste-Barbe and St-Stanislas-de-Kostka | $1,190,000 |
| Stoneham-et-Tewkesbury | Highway 175 - (from Stoneham-et-Tewkesbury and in the Réserve Faunique des Laurentides, for about 130 km northbound) | $7,414,000 |
| Tadoussac | Upgrade of drinking water supply | * |
| Témiscaming | Drinking water upgrade | * |
| Témiscouata | Conversion of the BeauLieu culturel de Témiscouata to group several cultural services together | $833,000 |
| Terrebonne | Water and Wastewater Pipeline Renewal Program (PRECO) | $2,724,320 |
| Thurso | Upgrading Drinking-Water Plant to Standard | $1,387,500 |
| Tring Junction | Restoration of the former Tring Junction train station and a public library | $267,200 |
| Trois Rivières | Trois Rivières Amphitheatre | $13,300,000 |
| Trois Rivières | Wearing course on a 2.5-km stretch of Highway 157 | $520,000 |
| Trois Rivières | Wearing course on Highway 40 eastbound and westbound in Trois Rivières between the Des Récollets exit and Highway 55 | $535,000 |
| Trois Rivières | Wearing course on a 4.3-km stretch of Highway 352 in Trois Rivières | $570,000 |
| Trois-Rivières | Drinking water upgrade | * |
| Trois-Rivières | Trois-Rivières Port - Phase 1 | $5,900,000 |
| Trois-Rivières | Water and Wastewater Pipeline Renewal Program (PRECO) | $929,020 |
| Trois-Rivières | Water and Wastewater Pipeline Renewal Program (PRECO) | $1,776,435 |
| Val-David | Water and Wastewater Pipeline Renewal Program (PRECO) | $281,250 |
| Val-d’Or | Maintenance of the Félix-Leclerc concert hall | $781,200 |
| Val-d’Or | Extension of the municipal water system | $677,703 |
| Val-Jalbert | Resurfacing of Highway 169 between Val-Jalbert and Chambord, Phase 2 | $672,000 |
| Val-Morin | Water and Wastewater Pipeline Renewal Program (PRECO) | $940,750 |
| Valcourt | Water and Wastewater Pipeline Renewal Program (PRECO) | $137,150 |
| Vallée Jonction | Repairs to water mains, sanitary and storm sewers, roadwork of Principal (Route 173) and du Point (Route 112) streets | $1,000,000 |
| Vallée-Jonction | Water and Wastewater Pipeline Renewal Program (PRECO) | $476,125 |
| Vaudreuil-Dorion | Wear surface on Route 340 from St-Clet to Vaudreuil–Dorion | $1,275,000 |
| Vaudreuil-Dorion | Rehabilitation of the Vaudreuil-Dorion Arena and Expanding it by Adding a New Skating Rink | $3,249,092 |
| Vaudreuil/Saint-Antoine/Saint-Hilaire/Saint-Eustache/Delson/Mascouche | Installation of five railway yard shelters. | $11,666,000 |
| Vaudreuil–Dorion | Construction of a new exit ramp on Highway 40 (Exit 26 North, Montée Daoust in Vaudreuil–Dorion) | $1,762,500 |
| Vaudreuil–Dorion | Wearing course on a 6-km stretch of Highway 20 | $950,000 |
| Villeroy | Reconstruction of Highway 20/railroad structures | * |
| Wakefield-la Pêche | Construction of the community centre | $1,646,182 |
| Warwick | Replacement of water and sewer mains | $494,084 |
| Waterloo | Water and Wastewater Pipeline Renewal Program (PRECO) | $34,200 |
| Waterville | Upgrading of drinking water production and supply infrastructure | * |
| Weedon | Water and Wastewater Pipeline Renewal Program (PRECO) | $328,000 |
| Westbury | Renewal of Water Network on Vincent and Dearden Roads | $139,166 |
| Westbury and Bury | More than 8 km of bituminous concrete reinforcement on Route 214 | $1,595,000 |
| Westmount | Water and Wastewater Pipeline Renewal Program (PRECO) | $996,125 |
| Westmount | Renovating the Facilities of the Arena-Pool | $9,984,720 |
| Wickham | Highway 139 | $1,732,500 |
| York River | Relocation of Highway 198 bordering | $1,250,000 |